ML20198F578

From kanterella
Jump to navigation Jump to search
Discusses Util Effort to Resolve 1872 Earthquake Issue.Util Believes Reasoned Argument Supported by Geophysical Data Can Be Made for Tectonic Boundary Between Columbia Plateau & Northern Cascades & That Earthquake in Chalan-Entiat Area
ML20198F578
Person / Time
Site: Washington Public Power Supply System
Issue date: 05/06/1977
From: Cox T
Office of Nuclear Reactor Regulation
To: Stepp J
NRC
References
CON-WNP-1143 NUDOCS 8605290011
Download: ML20198F578 (2)


Text

c G i

?:

)

/

BAY 2 0 25 Docket Nos.: 50-460/513 A. Schwercer, Chief, Light Water Reactors Branch 2-3, DRL FORT 11CDMING MEETING WITH WASHINCION PDILIC POWER SUPPLY SYSTDI (WPPSS)

DATE AND TIIIE:

Ifay 29,19M Thdrsddy" 8:30 a.m.

LOCATION:

Roon 6110; Itaryland-Nation 51 Bank Bldg.

Bethesda, Maryland PURPOSE:

To discuss applicant's response to four outstanding issues (see agenda)

PARTICIPANTS:

WPPSS: A Hosler, Licensin;;

N. Porter, Electrical Design W. IIeeg, Lonneville Povar Administration United Engineers and Contractors:

A. J. Friedtssa, Licensing B&W:

K. Suhrhe, Licensing NRC:

T. Cox, Project Manager V. Stallo, Assistant Director for Reactor Cafety R. DeYoung, Assistant Director, LWR Group 1 T. Novak, Branch Chief,

['

Reactor Systems

~

R. Baer, Section Leader, Reactor Systens F. Rosa, Section Leader, Electrical Controls and -

Instrumentatien D. Basdekas, Ett6 neer, Electrical 1

controls and Instrumentation 06 teel Ugad by l

~ ~.

t T. H. Cox, Project Manar,er Light Water Seactora Branch 2-3 Division of Reactor Licensin::

Attachment:

Agenda 8

i j

LWR.2-3 0605290711 750520

.m..,

-11C --

PDR ADOCK 05000460

} TCox: pact..

A poa om *

..$lE91H -.

-( -

p ABC.HS (Rev. MH ASOE SHS 8 W. # **V8""..mpmmmmMN FM a M6*

p 0

o AGENDA MEETING OF STAFF AND APPLICANT ON MAY 29, 1975 WNP-1. 4 PROJECTS Approximate Outstanding Issues Time of (Numbers refer to list Key Staff Discussion in 5/2/75 letter to applicant)

Participants 8:30 a.m.

A2 BPI/LPI Alignment F. Rosa, R. Baer, D. Basdekas, T. Cox 9:00 a.m.

A7 Regulatory Guide 1.75 T. Ippolito, F. Rosa, D. Basdekas, T. Cox 10:00 a.m.

A9 Offsite Power System T. Ippolito, F. Rosa, D. Basdekas, T. Cox 11:00 a.m.

Al DHRS design V. Stello, R. DeYoung, T. Novak, R. Baer, F. Rosa, D. Basdekas, T. Cox

.