UNITED STATES j
y"
'4 NUCLEAR REGULATORY COMMISSION h
WASHINGTON, D. C. 20666 e
\\,*..../
FEB g 1977 fs #
DISTRIBUTION SEISMOLOGY REVIEW PLAN FOR PACIFIC NORTHWEST PLANTS A meeting was held among DPM and DSE staff on February 2,1977, to discuss appropriate seismic review actions needed to resolve licensing decisions on the nuclear plants located in the Pacific Northwest that are under review for construction permi_ts considering the potential impact of the 1872 Earthquake and the likely progress of the USGS review of the reports submitted by the Pacific Northwest utilities task force group.
The recommended review actions summarized herein for the several plants are based on the following:
(1) The staff can support conclusions for s'eismic design bases for WNP 3, 5 and Skagit 1 & 2 and the staff believes that its conclusions for these plants will not likely be affected by the USGS review of the 1872 Earthquake.
(2) The 1872 Earthquake evaluation by USGS should be evaluated in review of the seismic ~ design of the other plants (i.e., WNP 1,4; WNP 2; Pebble Springs 1 & 2).
(3) The USGS will likely take about 3 months to complete its review of the 1872 Earthquake report submitted by the utilities task force group.
/)vt a b
John F. Stolz, Chief i
k,/ight Water Reactors Branch No.1 1
ivision of Project Management i
Enclosure:
Recommended Review Action i
l * !l 0605290003770D09 i
PDR ADOCK 05000460 l
A 4 PDR t
ENCLOSURE FGR SEISMGLOGY REVIEW PLA.N F0k PACIFIC NORTHWEST PLANTS e'
FACILITY PRESENT STATUS RECOMMENDED REVIEW ACTION WNP 3, 5 Needs LWA-1; only 1872 seismic Staff to prepare affidavits by 3/1/77-for issue involved. Safety hearing transmittal to ASLB by 3/8/77 to support scheduled to begir. 5/17/17.
LWA-1 decision; SER Supplement to be sub-sequently issued prior to safety hearing.
Except no change in previous seismic design basis (0.32 ) conclusions; no U5GS review 9
will be requested, since USGS did not par-ticipate in this plant review.
Skagit 1, 2 Needs LWA-1; combined hearing with Staff to prepare seismic input to SER by Pebble Springs on need for power 3/1/77 (SSE to be likely 0.35g instead of scheduled for March '77; seismic 0.30g present design basis). USGS review cor.cern among the issues affecting of staff conclusions will be requested; will resumption of er.vironmental hearing proceed to LWA hearing without USGS letter possibly in April '77 & issuance of unless USGS has significant problem with LWA-1; ACRS meetir.g scheduled for staff's conclusions; may possibly have USGS June '77.
letter for June ACRS meeting but if necessary will proceed to ACRS without USGS letter.
Pebble Springs 1, 2 Needs LWA-1; combined hearing with Staff will wait for USGS report on 1872 Skagit on need for power scheduled earthquake to support SER supplement.
for March '77: ACRS meetisig will be Supplemer.t likely to be issued by June 1977.
delayed to.1alv '77.
~
WNP-1 CP issued 12/23/75 WNP-2 CP issued 3/19/73; cor.struction about 30% complete.
WNP-4 L'AA-1 & 2 issued 8/1/75; LWA-2 supplement issued 10/3/75 authorizing work that will be completed by about 9/77. Seis.vic issue is pacing item for AStB decision on CP.
W mf
~ ^
o DISTRIB'JTION B. Rusche E. Case R. Boyd R. C. DeYoung D. B. Vassallo F. J. Williams J. Stolz K. Kniel
- 0. Parr S. Varga L. Crocker H. Smith H. Berkow R. Heineman J. Knight I. Sihweil H..Denton V. Moore W. Gammill J. Stepp I. Peltier C. Stable T. Cox M. D. Lynch A. Bournia E. Hylton M. Service M. Rushbrook J. Lee ELD Central Files (RD 16-6 1872 Earthquake)
Docket Files 522/523 50-51.4/515 50-460/513 50-397 50-508/509 e
e I
._