Text
r cEO 2 3 Y374 l
Docket Nos. 50-460 and 50-513 l
E. Denton, Assistant Director for Site Safety Technical Laview, L Thrus V. A. Moore, Assistaat Director for Light Water Rasetors, Group 2 L USGS LETTER FOR WNF-1, 4 AFPLICATION I
j SAR input to the SER for WNF-1, 4 is due on 1/23/74. We recognise that the USGS letter evaluation is sometimes difficult to obtain on schedule.
I would like to susseet that steps be taken as soon as practicable to assure that the USGS effort on the WPPSS docket will be completed for submittal with the staff SER input.
i t&4 1
A. Schwencer. Chief Light Water Reactors Branch 2-3 Directorate of Licensing Distribution:
LWR 2-3 Rdg Docket Files (2)
VAMoore TCox 7
ASchwencer Scoplan WCasatill RMcMullen 8605280530 741223 PDR ADOCK 05000460 E
PDR x7886/ LWR 2-3 C-LWR 2-3,,,,,, _,,
ADfLWR..2/L, TCoxtra ASchwencer VAMoo re.,,_....,_
12/ /74 12/ /74 12/ /74 Forms AEC Sla (Rev. 9-13),AAO4 0240