Forwards Corrections to Section XI of Des,Per 721113 Memo
ML20198F486
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/05/1972
From: Harold Denton
US ATOMIC ENERGY COMMISSION (AEC)
To: Muller D
US ATOMIC ENERGY COMMISSION (AEC)
References
CON-WNP-0892, CON-WNP-892 NUDOCS 8605280523
Download: ML20198F486 (2)


Text

I o

DISTRIBUTION:

Docket File 50-39 7 c "

L-Rdg.

L-AD/SS L-cB DE 5 19 2

, Docket No. 50-397 i Daniel R. Muller, Assistant Director for Environmental Projects, L l

i CORRECTIONS TO SECTION II 0F THE DRAFT ENVIRONMENTAL STATEMENT I

FOR HANFORD 2 PLANT NAME: Hanford No. 2 Nuclear Power Plant LICENSING STAGE: CP DOCKET NUMBER: 50-397 i RESPONSIBLC B R AN Cll: Environmental Projects Branch #4 PROJECT HANAGER: R. Loose DATE REQUEST RECEIVED BY CBAB: November 27, 1972

, REQUESTED COMPLETION DATE: Novembe r ,30, 1972 DESCRIPTION OF RESPONSE: Corrections to Section II of Draft Environmental Statement.

REVIEW STATUS: A cursory review of Cost-Benefit considerations has been made.

I The evaluation of consents on the Draft Environmental Statement for Hanford 2 given in our memorandum of November 13 has been adequately taken into account in the preparation of Section XII of the Final Environmental Statement. There are a few corrections to the changes in Section II made at Argonne in going from a plant factor of 851 to 802.

These corrections are given in the enclosure and have been agreed to by William Hallett of Argonne.

o. ,p i, a u4
11. LL pawn Harold E. Denton, Assistant Director for Site Safety Directorate of Licensing

Enclosure:

As stated I f l

l cc: w/o emel.

A. Giamb us s o i W. Mcdonald 8605280523 721205 PDR ADOCK 05000397 w/ encl. D PDR S. Hanauer i i J. Hendric l

R. Haliaqd

( omer > . ...K....S p an g1e r..L .: .C.B_ .......L :..Q.B ,, .,L.; S S,.

I W. Regan /DP 1@%k). 7 i sumwr > ... RT- L o o s e - E OU * :.D _P_a n g.}.e.r . . M. ' t.o n_ ,

om > . . p . . . . v4 ,, . . . 12./.4./ 7 2 12 f.f./ 7.2.. ..1.2./L . 2 .

Form AEC-Sls (Rev. 9-SS) AECM 0240 cu s c.ou awe *.* wa.c. c*

  • ct 1972-466-984

O e

CORRECTIONS TO SECTION XI 0F THE DRAFT ENVI RONMENT AL STATEMENT FOR liANFORD-2, AS AMENDED BY ARGONNE In Tab l e XI-3 on page XI-16 under the heading of " Coal-pur fi red ," the gross annual cos ts (present w o r th) should be

, gy $474 million, the total cost should be $769 m ' lion, and p the f uel requirc d annually should be 3.5 million tons.

If I On page XI-18 in the sixth line of the first paragraph, annual operating costs should be $34.4 million.

On page XI-18 in the fifth line of the last paragraph, th e amount of coal burned should be 3.5 million tons / year.

On page XI-19 in the fifth line of the fourth paragraph, inc remental pre s en t,wo r th costs should be $96,000,000, i

-