Text
I o
DISTRIBUTION:
Docket File 50-39 7 c "
L-Rdg.
L-AD/SS L-cB DE 5 19 2 Docket No. 50-397 i
Daniel R.
Muller, Assistant Director for Environmental Projects, L l
CORRECTIONS TO SECTION II 0F THE DRAFT ENVIRONMENTAL STATEMENT i
I FOR HANFORD 2 PLANT NAME:
Hanford No. 2 Nuclear Power Plant LICENSING STAGE:
CP DOCKET NUMBER:
50-397 i
RESPONSIBLC B R AN Cll:
Environmental Projects Branch #4 PROJECT HANAGER:
R.
Loose DATE REQUEST RECEIVED BY CBAB:
November 27, 1972 REQUESTED COMPLETION DATE:
Novembe r,30, 1972 DESCRIPTION OF RESPONSE:
Corrections to Section II of Draft Environmental Statement.
REVIEW STATUS:
A cursory review of Cost-Benefit considerations has been made.
I The evaluation of consents on the Draft Environmental Statement for Hanford 2 given in our memorandum of November 13 has been adequately taken into account in the preparation of Section XII of the Final Environmental Statement.
There are a few corrections to the changes in Section II made at Argonne in going from a plant factor of 851 to 802.
These corrections are given in the enclosure and have been agreed to by William Hallett of Argonne.
- o.,p i, a u4
- 11. LL pawn Harold E.
Denton, Assistant Director for Site Safety Directorate of Licensing
Enclosure:
As stated f
I l
l cc:
w/o emel.
A.
Giamb us s o i
W.
Mcdonald 8605280523 721205 PDR ADOCK 05000397 w/ encl.
D PDR S.
Hanauer i
J.
Hendric i
l R. Haliaqd
(
omer >
....K....S p an g1e r..L.:.C.B_
.......L :..Q.B
,,.,L.; S S,.
I W.
Regan
/DP 1@%k).
7 E OU * :.D
_P_a n g.}.e.r.. M.
' t.o n_
i sumwr >
... RT-L o o s e -
om >
.. p.... v4,,...
12./.4./ 7 2 12 f.f./ 7.2..
..1.2./L. 2 Form AEC-Sls (Rev. 9-SS) AECM 0240 cu s c.ou awe *.* wa.c. c*
- ct 1972-466-984
O e
CORRECTIONS TO SECTION XI 0F THE DRAFT ENVI RONMENT AL STATEMENT FOR liANFORD-2, AS AMENDED BY ARGONNE In Tab l e XI-3 on page XI-16 under the heading of " Coal-pur fi red," the gross annual cos ts (present w o r th) should be
, gy
$474 million, the total cost should be $769 m ' lion, and the f uel requirc d annually should be 3.5 million tons.
p If On page XI-18 in the sixth line of the first paragraph, I
annual operating costs should be $34.4 million.
On page XI-18 in the fifth line of the last paragraph, th e amount of coal burned should be 3.5 million tons / year.
On page XI-19 in the fifth line of the fourth paragraph, inc remental pre s en t,wo r th costs should be $96,000,000, i
-