ML20198F470
Jump to navigation
Jump to search
| ML20198F470 | |
| Person / Time | |
|---|---|
| Site: | Columbia, Washington Public Power Supply System, Satsop |
| Issue date: | 12/23/1974 |
| From: | Ballard R US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Berkson H US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| CON-WNP-0889, CON-WNP-889 NUDOCS 8605280518 | |
| Download: ML20198F470 (1) | |
Text
DISTRIBUTION Docket File L:Rdg L:AD/S5 L:ESB
- t; 2 3 W4 H. Berkson, Environamatal Specialists Brmek, L DES REVIEW - WPPSS h0S. 2-4 70- S$4 The DES for WPFSS Nos. 2-4 has been issued. We are schaduled to review the DES and submit co
- nments to Environmental Projects by January 3, 1975. Please note that our attention should concentrate on the adequacy of the summary and conclusions in reflecting the principal issues raised in the text.
J. Sclan was the principal reviewer of this case.
Orya.. s ;.G Lt.<orcid L Bal'ard, Ronald L. Ballard, Chief Environmental Speciclista Stanch Directorate of Licensing Enclosuret DES ces w/o enclosure J. Dolen R
0605280518 741223
=
l
. *..._L ES ti
_ PDR ADOCK 0D000397 i
D PDR kOO 18td !)a b,,.... _. -...
owe es us t-
.. !. 3..M be
[.
.Re. 9 $3) A2CM 0240
- w. a sevseama=* Peinte=a oeritte e.va.ess.sae