ML20198F454
| ML20198F454 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde, 05000000, Satsop, Atlantic Nuclear Power Plant |
| Issue date: | 09/30/1975 |
| From: | Parr O Office of Nuclear Reactor Regulation |
| To: | Boyd R Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-1089 NUDOCS 8605280514 | |
| Download: ML20198F454 (1) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION W ASHINGTON, D. C. 20555 SEP 3 01975 g
1.- / O R. S. Boyd, Acting Director, Division of Reactor Licensing, NRR THRU:
R. C. DeYoung, Assistant Director, Light Water Reactors gg Group 1, DRL 7
OCTOBER ACRS SUBCOMMITTEE MEETINGS Three ACRS subcommittee meetings are scheduled during October for applications assigned to LWR 1-3:
Pala hrde October 20 gTPSS3/5)
October 23 FNP October 29/30 I plan to attend the Palo Verde and WPPSS 3/5 subcommittee meetings along with the LPMs as both of these applications reference CESSAR and my recently assigned LPM (Villaiva) is not up to speed on CESSAR. Regarding the FNP subcommittee meeting I believe that DeYoung or myself should plan to attend along with Birkel due to the unique design concept.
b.
an D. Parr, Chief Light Water Reactors Project Branch 1-3 Division of Reactor Licensing O
h )\\
U 8605280514 750930 PDR ADOCK 05000437 A