ML20198F339
| ML20198F339 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 01/23/1974 |
| From: | Cox T US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Schwencer A NRC |
| References | |
| CON-WNP-0944, CON-WNP-944 NUDOCS 8605280479 | |
| Download: ML20198F339 (3) | |
Text
.
y O
JW 2 3 73/4 Dochet No.. -460 Note to A. Schwencer:
ITINERARY FOR t/AsilINGTO:i INCLEAR ONE SITE TOUR (REVISED)
The site visit vill be on January 30, 1974, with travel on January 29 and 31.
A tentative agenda for the 1/30 nceting is enclosed.
The following personnel are asked to nake their own travel arrangements to arrive at the llanford ifouse in Richland, Washington on the evening of 1/29.
A. Schwencer T. Cox L. Soffer R. Fic"ullen S. Coplan
- 11. !!ickey (USGS)
P.. ". orris (USGS)
L. lleller (Watertays Experiment Station)
Biotel reservations for the above attendees, for the nights of January 29 and 20, have been cade at the IIanf ord House (509-9'.6-7611).
Reservationa tode by h"aren Fer;;uon, single rooms, all have been guaranteed.
A suggested airline schedule is as follous:
1/29/7',
Lv Nat'l Airport 11:15 a.m. via UA 277 Ar Scattle 5:27 p.m.
Lv Seattle 7:10 p.rc, n'.1 9 2 8 At Pasco 7:47 p.t.
Lv P a:,c o f o r I;a n t'o rd !!ou a e, Richland in tua rental cars (reserved for T. Co:: and A. Schwencer) 1/31/7, Lv ilaifird : louse 9:15 a.m., in rental cars for Pasco Airport L" Pa s c o 10 : /. 2 a.. v ia 3'./ 5 21 Ar Seattic 11:33 a.n.
Lv Stattle 12:20 p.a. via NW 70 Ar N a t 'l 9 :11 p.r.i.
0 T.11. Cox, Proj ec t flanager I.'.!R 2-3, DOL cc:
- P" Ne:.t page hh52OO47974o123 ADocx c500046o A
PDR lj-
i e
A. Schwencer JD 2 3 gea ec:
T. Cox W. Ca::cill B. Gri::es L. Soffer R. !!cMullen i
S. Coplan Project Files
r 3
s JAN 2 3 G74 UASHINGTON UUCLEAR ONE SITE TOUR AGENDA January 30, 1974 9:00 a.m.
1.
General Tour of Hanford No. 1 Site (Local Times) a.
Location of major structures - buildings, switch yard, oil storage points, b.
Onsite meteorological tower, location of new tower.
Existing and planned intake structures, and seal c.
well and outfall line, d.
Non-radwaste discharge points c.
Site surroundings f.
Area geological features 12:00 p.m.
2.' Lunch 1:00 p.m.
3.
General Tour - Hanford No. 2 Site 3:00 p.m.
4.
Meeting - Location specified later Discussion of draf t geology and seismology a.
requests and questions arising from site tours, b.
Regulatory staff sunmary of significant items.
5:30 p.m.
5.
Departure from site J
F
. i
~
~ * - - ' ' - - ' ' ' ' ~ ' ~ ~ ' ' " ' ' ' ' ' ' ' " ' ' ~ ~ ^
~ ~ - ' ' ~ ~
-