Forwards Hydrological Engineering Questions Re Application for CP to Be Transmitted to Util
ML20198F288
Person / Time
Site: Washington Public Power Supply System
Issue date: 01/08/1974
From: Harold Denton
US ATOMIC ENERGY COMMISSION (AEC)
To: Moore V
US ATOMIC ENERGY COMMISSION (AEC)
References
CON-WNP-0940, CON-WNP-940 NUDOCS 8605280462
Download: ML20198F288 (3)


Text

W DISTRIBUTYON Docket File 50-460 -

g6 yjg L:Rdg L:AD/SS trSAB Voss A. Moore, Aseintant Dire <cor for Light k' ster Reactors Group 2 L HYDROLOGIC E5CINEERING QUEST [0MS PT. ANT NAME: WPSS Unclear 1 LICDiSING STACE: CP DOCKET NWBER: 50-460 RESPONSISLM B2MCH: LVR 2-3 REQUESTED COMPLETION DATE: Debember 28, 1973 APPLICANTS PISPONSE DATE NECESSARY POR NETT ACTION TLANNED GN PROJEL"r About February 15, 1974 DESCRIPT1CN OF RESPONSE: Answerr Questional REVIEW STATUS: site Analysis Branch (Hydrologic Engineering) -

Awaiting Information Enclosed are the hydrologic engineering questiotta, prepared by L, C. Hulmas and E. P. Pawkins, for your transmittal to the appifcent.

Ou.m i,. A ty IL 11.Dscica Harold R. Denten, Assistant Director for Site Safety Dire.storate of Licensing Enclos*are:

As stated ce; v/o enclosure

4. Gianbusso W. Mcdonald J. PangarelLa SS Branch Chiefs cc: w/ enclosure S. Hanauer J. Hendrie W. Casatill C. Long L. Shao A. Schwencer T. Cox 0603200462 740108 R. Klecker PDR ADOCK 05000460 A

PDR D. Eisenhut J. Carter N

q_ varam RFP ATTH'strn SHE ?T FAR CONCURRENCE.

t. m ',;[

LrAD/SS Tad. /d

,t.m omes*

y.

TWr lm d inh._,Jrunt t 4 m c tznc om,411 HRDent'on eveneme,

o

.1/.7/74 1/ /74

_,,1L,/,7,4 1/i/74,,_,

oats, e

Aac.m enes. *sm ascu one ee.

s==

.. = > +

  • * * = = =

4 DISTRIBUTION Do'cket File

-460

.: pag L;AD/SS

SAB

\\

N Richard C.

Young, Assistaat Director for PWR's, L HYDEDLOGIC ENC NEERIUG QUESTICES PLANT NAME: UPPS Nuclear 1 LICENSING STAGE:

DOCKET !!CEER: 50-440 EESPCNSIBLE DRA! G : @ Branch #4 REQUESTED COMPLETION DATE: Decesher 28, 19 APPLICANTS RESPONSE DATfsNICESSART TOR

!! EXT ACTION Pl.AhNED CN YROJECT: Abooty abruary 15, 1974 DESCRIPTION OP RESPCNSE: Answer Quest.tene AwaitingInf(ormation REVIEIT STATUS:

Site Analysi Branch ydrologic Engineering) -

Enclosedarethehydrologicengine/

\\ ering questions, prepared by L. C. Bulman and E. P. Hawkins, fo't' your transmittal to the applicant.

i Harold Denton, Assistant Director for S,e Safety Directorate of Licensing Enclosura:

As stated cc: w/o enci e

4. ci + id W. McDepa J. Passarella

/

ee: v/mptioence s!sananer J

Hendrie

. Commi11 C. Long L. Shao A. Seft. renter T. Cos L. Hulman

.. ~..Lg.. -...

L: FAB

.L. : S AB L:AD/SS omum g

.L. C..H. 7 a a : 1 ab....E..F. H. a..w.k. ins- - PCami.l..l...

..H..R..D..e..n.t. o n.

W 7

on rr >.... @

Foem AEC-5IS (Rev 9d3) AICM $240.

' N../.d.../.7l... f k[./h.

Y /. [.N;....

- _ -~~

.se -is--e l ess-g eeU7s

HYDROLOGIC ENGINEERING QUESTIONS WPPSS NUCLEAR PROJECT NO.1 DOCKET NUXBER 50-460 1.

Section 2.4.1 and Table 2.1-9 reference water users along the Colu=bia River from State of Washington records through 1969, and excludes those users that have not applied for water rights.

Please extend Table 2.1-9 for any major existing users, or any that are kno en that propose to use the Columbia River as a water supply, as far downstream as just below the Tri-Cities.

2.

It is not clear that the roofs and drainage system of safety-related structures will be designed to adequately store and/or pass rainfall of probable maximum severity without a loss of function. Provide your analysis of the consequences of the occurrence of rainfall as severe as the thunderstorm probable maxi-num values indicated in Section 2.4.3.1 on the roof of each safety-related structures where accumulations can occur. Furthermore, provida your design bases and analyses of the capability of the same facilities to withstand severe ice and snow accumulations approaching probable maximum severity.

3.

Provide preliminary plan and cross section views of the river bank in the vicinity of the intake which show the extent of the riprap protsetion referred to in Sections 2.4.3.6 and 2.4.5.7.

Provide a discussion of your application of the bases for the

.