ML20198F120
| ML20198F120 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 11/08/1974 |
| From: | Loose R US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Paton W US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| CON-WNP-1218 NUDOCS 8605280418 | |
| Download: ML20198F120 (1) | |
Text
-
.....~
,y
~
- ~ ~. _
~,
[
c t
as e
, w-DISTRIBUTION:
O (f.efitral File'
. l W -4 Reading RRLoose NOV 8 1374
,'l
~'
'5 Q
-q NOTE TO: William Paton '
^ y ;A: ng ~. ::-
- o a. ^,.
' EFFSS 1 & 4
- k. 'Mc% lr:$ % w.Y.,.
._ FN, -
-y [y y;ugy,:Q,;ff.p;p.gq, ?
v g'_,
W f.
v.
" 1.In resp e to your note of Novembee'6, 1974-I offer the following 7
t M ensaments:'
.n M.t!f/.8 D a-s.
m
. c s; w ' ;.n. s W' y.
q, e, s,
.M..
- e gg. m7
,.-2 j
.~ M 1.: In accordamse with st==dard " green cover" review procedures, of - Sections 1 thru 7 of the WFFSS 1 & 4 DES were reviewed at ANL
'M
' N.. - 9 'dm October 10 and 11, 1974. At that time, no substantial
'.k M.;
problems were identified in these sections except for your question i;
on tran==imaion lines which is addressed in item 3 below. Accor-i dingly, your cousments, as well as EP's have been incorporated into l,
t sections 1 thru 7 of the DES which is now ready for publication.
=
9 l
2.
At the time of the " green cover" review at ANL, complete drafts Q, U..of Sections 8, 9 and 10 were not available.
l
. v, --
Specifically, items
..;(a) thru (c) _of your memo were missing and itent (d) was identified
%y.-"_ as needing revision in view of intervention. I have been advised l.
a by ANL that complete drafts of Sections 8, 9 and 10, incloding a
, revised geothermal alternative discussion, will be available for OGC and EF review by November 15, 1974. At this time I would espect a normal 2 day " green cover" review of these sections. I
- find no basis in your memo which would substantiate additional f
review time, esp =ef=117 since the review is already partially complete.
t 3.
I have had additional discussions with John McLeod of BFA concerning
~
l transmission lines. He has assured me that the transainsion lines associated with the Ash Substation.were p1 maned.before WNP 1 and 4,
[
s ai that fchey would be built regardless of the existance of WNP 1 and G.Ji. 4 and will have the especity to handle the load of VNP 1 and 4.
f l
v n Ee is sending me a Intter to document these facts. In addition I t
i have the BFA EIS's for these lines which were. issued in draft form l
'M on Jammary 14, 19744 Since the decision to move the WNP #1 site and l
'W-add WMF #4 was not.nede until July 1974, it 'is elaae that the 14naa l
- in question are not being constructed due to the WNP projects. 'Ihere-l
'.s ' fore EP will only discuss those tran -fanion lines necessary to get t
the power from the Stations to the Ash Substation in the WNP 1 and 4 DES.
S 4
kkDN l
Ronal6 RM 8605220418 741108
'j -
I PDR ADOCK 05000460
- 1. R. Loose, Project Manager 4 g D
PDR Environmental Projects Branch 4 r fV M4 rac e ne n r.m nF T f a
-=4.ne L:EP-4 on, c g,
g,,
Wi1 hins RRLoose:sl
..,_Regan 4
Gallo 11/8/74 u,.,
e.n. Asc.na <a p.m As m ono
- u.
......,,,i.,,
..u.
r.a. ~ mm..aw.2n.e.x.e,..ak:.. % ; w..
._-w.u.+..~.w.n. a u ~, -.. i.,J.2L w
. _ _ _