UNITE 3 STATES 3*
NUCLEAR REIULATORY COMMISSION o
g g
wASMNGTON, D. C. 20555 k...../
November 13, 1985 Docket No. 99900773/85-01 Siemens - Allis Inc.
ATTN:
H. A. Hincks General Manager 1
P.O. Box 29503 i
Raleigh, North Carolina 27626 Gentlemen:
This refers to the inspection conducted by Mr. K. R. Naidu of this office on May 13-14, 1985, of your facilities located at Wendell and Sanford, North Carolina and to the discussions of our findings with Mr. R. D. Giuli of your staff at the conclusion of the inspection. This also refers to th inspection of your switchgear installed at the Shearon Harris nuclear power piant conducted on July 8,1985 with you, members of your staff and plant electrical maintenance personnel, to observe the defeciencies identified during routine maintenance and to the subsequent discussions on the corrective actions proposed by you to correct these defeciencies.
The purpose of these inspections was to review the implementation of your quality assurance program and corrective action taken relative to the weld deficiencies and other problems identified in the switchgear supplied to Shearon Harris nuclear power' plant. Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.
The results of the inspection indicate that you have either taken or initiated appropriate corrective action on each of the identified problems.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
)
l dl 8511140241 e51113 Gary'G. Zech, C ef GA999 EPp/sfE A Vendor Program Branch PDR 99900773 Division of Quality Assurance, Vendor, and Technical Training Center Programs Office of Inspection and Enforcement
Enclosure:
[og Inspection Report 99900773/85-01
\\f
Novemb:r 13, 1985 Siemens - Allis Inc. j 1 DISTRIBUTION:
N
> VPB Reading
.DQAVT Reading RVollmer
~JTCollins JStone GHolahan,NRR/0RAB BKGrimes GZech EMerschoff KRNaidu l
I AVT
- DQAVT DIR: QAVT VP.
.KR aidu:tt hoff-GZec MB imes 1$/g/85
/b /85
%)C/ /85 1
/G//85
!