Text
istribution: w/ encl.
% ocket File JAN 18 M LWR #3 File
- 0. Parr T. Cox Docket flos. 50-460 M. Rushbrook and 50-513 F. J. Williams MEliORAllDUM FOR:
R. Heineman, Director, Division of Systems Safety, tlRR FROM:
Olan D. Parr, Chief. Light Water Reactors Branch !!o. 3, DPM
SUBJECT:
TECHilICAL ASSISTAllCE REQUEST Your assistance is requested for the following:
Plant flane:
WPPSS iluclear Projects flos.1 & 4 (WiiP-1,4)
Docket l10.:
50-460 and 50-513 Responsible Branch:
LWR #3
Contact:
T. H. Cox, Project Manager, x27243 Technical 'ED+ Branch:
Analysis Branch
' - - ~ ~
Reactor Systems Branch Target Completion Date:
Review completed - February 25, 1977 SER supplement input to LPM - ?! arch 7,1977 Description of Request:
Review applicant's response (Reference 1) to liRC request (Reference 2) concerning revision to B&W ECCS model and application of this revised model to the WilP-1,4 construction permit application. The applicant has reported, in a response prepared by B&W, that the LOCA limits previously submitted on this application and approved by the staff are still valid and conservative. Advise LPM of additional l
infonnation needed, if any, by February ll, 1977. The review should be complete by February 25, 1977. SER supplement input with conclusion on applicant's compliance with Appendix K should be transmitted to Division of Project Management by March 7, 1977.
u,o Md I
I I
8605280377 770118
{DR ADOCK 0500 0
l l.
l..
Foran Al&.tla (Rev. 9 53) AIOt 0240 W u. s. oovenmasant enes time orrecas ter4.eae.see e
s JAN 18 W/7.
References:
(1) January 12, 1977 letter from D. Renberger (WPPSS) to 0. Parr (DPil) providing proposed revision to BaW ECCS Evaluation
- Model, g
(2) December 29, 1977 letter from 0. Parr (DPil) to J. J. Stein (WPPSS) advising of need for ECCS model revision and reevaluation for WNP-1,4.
Original Signed b1
- 0. D. P.ars/
Olan D. Parr, Chief Light Water Reactors Branch ?lo. 3 Division of Project Management
Enclosure:
Reference 1 cc:
W. ficDonald, MIPC D. B. Vassallo L. Crocker H. Berkow E. Ketchen, OELD Z. Rosztoczy T. !bvak D. Ross 1
Q LWR #3 LWgg.
o,,,e.
TCox/LLMN ODParr 1/ / 7 /77 1/ if /77..
- o..
form AFC 3la (Rev. 9+S3) AECM 0243
- u. s. novsannouwt pamtime orricas sera.sas. sos