ML20198E973
| ML20198E973 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 12/08/1997 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Cottle W HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20198E979 | List: |
| References | |
| 50-498-97-06, 50-498-97-6, 50-499-97-06, 50-499-97-6, EA-97-572, NUDOCS 9801090272 | |
| Download: ML20198E973 (5) | |
See also: IR 05000498/1997006
Text
pw
. www ~~
-
-
-
--
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ..
. - - - .
H
[
o. q ;
.
,
LEA 97 57?
December 8,1997
William T/Cottle, Group Vice
President,~ Nuclear :
Houston Lighting & Power Company
P.O. Box 289
Wadsworth, Texas 77483 -
. SUBJECT:
NRC INSPECTION REPORT 50-498/97-06; 50 499/97-06 AND NOTICE OF
VIOLATION
Dear Mri Cottle:
On October _4,1997, the NRC completed an inspection at your South Texas Projects
Units 1 and 2, facility. The enclosed report presents the scope and results of that
inspection.
During the 8 week period covered by this inspection, your conduct of activities at South
Texas Project was generally characterized by safety conscious operations with strong
maintenance and engineering practices, and careful radiological work controls. During the
course of the inspection, three violations of NRC requirements were identified. The first
violation involved two examples of an inappropriate use of equipment clearance orcers to
perform work requiring the use of written procedures.- The NRC has concluded that
corrective actions discussed in your response to Violetion 498;499/97005 03, should be
sufficient to correct the causes of this violation. Therefore, while this vio;ation is cited as
Violation A in the enclosed Notice of Violation, we have determined that your docketed
corrective actions satisfy the intent of 10 CFR 2.201 and, therefore, no further response is
required. The second violation occurred when NRC inspectors identified that test, vent,
and drain line isolation valves associated with 10 containment penetrations were not
verified to be closed as required by Techrical Specifications. The final violation involved a
determination by NRC inspectors that a writte.n safety evaluation had not been prepared
i
-
prior-to the installation of the advance liquid processing system in September 1992.
While reviewing your administrative controls for backup pressurizer heaters with the cold
overpressure mitigation system out of service, NRC inspectors identified that the required
adminictrative controls over systems or components that could result in a reactor coolant
,
system mass or temperature increase were not readily identifiable as procedural steps in
one procedure intended to assure this. We are concerned that not having these
administrative controls specifically delineated in one procedure may lead to a repeat of the
January 12,1994, water solid condition wherein the power-operated relief valves were
inoperable while the pressurizer heaters were not inoperable. In discussions with your
i
Operations Support Manager on November 18,1997, you committed to revise your plant
I
startup procedure to specifically delineate the required administrative controls which will
. provide assurance that low temperature-overpressure conditions are not encountered.
.
Please provide us, within 30 days of the receipt of this letter, confirr,ation of this
commitment along with the details of the changes you plan to make.
i
'
9001090272 971208
'
i
ADOCK 05000498
pp%##
_*
-
!
'
e
.,
.
,
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
its enclosure, and your response will be placed in the NRC Public Document Room. To.the
extent possible, your response should not include any personal privacy, proprietary, or
safeguards information so that it can be placed in the Public Document Room without
redaction.
Should you have any cuestions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
,
/s/
Thomas P. Gwynn, Director
Division of Reactor Projects
.
Docket Nos.: 50-498
50 499
License Nos.: NPF 76
Enclosures:
2. NRC Inspection Report
50 498/97-06; 50-499/97-06
cc w/ enclosures:
Lawrence E. Martin, General Manager
Nuclear Assurance & Licensing
'
Houston Lighting & Power Company
P.O. Box 289
Wadsworth, Texas 77483
Mr. J. C. Lanier/Mr. M. B. Lee
City of Austin
Electric Utility Department
721 Barton Springs hoad
Mr. K. J. Fiedler/Mr. M. T. Hardt
-City Public Service Board
P.O. Box 1771
San Antonio, Texas 78296
Jack R. Newman, Esq.
1800 M. Street, N.W.
Washington, D.C. 20036 5869
l
_
i
..
.
,
Mr. G. E. Vaughn/Mr. C. A. Johnson
' Central Power & Light Company
P.O. Box 289
Mail Code: N5012
Wadsworth, Texas 77483
Records Center
700 Galleria Parkway .
Atlanta Georgia 30335-5957
.
Dr. Bertram Wolfe
15453 Via Vaquero
Monte Sereno, California 95030
Bureau of Radiation Control
State of Texas
1100 West 49th Street
Mr. Glenn W. Dishong
Texas Public Utliity Commission
7800 Shoal Creek Blvd.
Suite 400N
John Howard, Director
Environmental and Natural Resources Policy
Office of the Governor
P.O. Box 12428
Judge, Matagorda County
Matagorda County Courthouse
1700 Seventh Street
Bay City, Texas 77414
Licensing Representative
Houston Lighting & Powei Compary
Suite 610
Three Metro Center
Bothesda, Maryland 20814
Rufus S.' Scott, Associate
General Counsel
Houston Lighting & Power Company
P.O. Box 61867
Houston, Texas 7/208
Joseph R. Egan, Esq.
I
-
- .
,
.
Egan & Associates, P.C.
2300 N Street, N.W.
Washington, D.C. 20037
+
F
4
.
_.
'
.
..
..
E-Mail report to T. Frye (TJF)'
E Mail report to T. Hiltz (TGH).
E-Mail report to NRR Event Tracking System (IPAS)
E Mail report to Document Control Desk (DOCDESK)
E Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec'to DCD (IE01)
bec distrib. by RIV:
Regional Administrator -
Resident inspector
DRP Director
DRS-PSB
Branch Chief (DRP/A)-
MIS System
Project Engineer (DRP/A)
RIV File
Branch C'11ef (DRP/TSS)
R. Bachmann, OGC (MS: 15 B 18)
DOCUMENT NAME: R:\\_STP\\ST706RP.DPL
lo receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy wth enclosures "N" = No copy
RIV: SRI
DRP/A
RI:DRP/A
RI:DRP/D
PE:DRP/A
DPLoveless;df'
JCEdgerly'
WCSifre'
JMKeeton'
RAKopriva'
11/19/97
NA
11/8/97
11/7/97 "%K)
11/7/97
unummmmmmmmmmme uneuenmummmmmuns ammuumusumummmum
.
. sammemusimumummumummus
C:DRP/A
D:DRP
JiTapia
TPGwynn
-
12/5/97
12/5/97
/previously concurred
OFFICIAL RECORD COPY
,
Y a