Forwards LAR 98-15,proposing Change to TS Involving Relocation of TS 3/4.7.10 & Associated TS Table 3.7-3 to Technical Requirements Manual
ML20198E710
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 12/16/1998
From: Feigenbaum T
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198E716 List:
References
NYN-98131, NUDOCS 9812240130
Download: ML20198E710 (3)


Text

.-

. -.~..

.. o

-o,

'\\

North Atlantic Energy Service Corporation North i'o iw 3*

Seabrook, Nil 03874 A i l

' fill 111111C 903)4;4 9521 The Northeast Utilities Spiem December 16,1998 j

Docket No. 50-443 NYN-98131 j

i United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Seabrook Station License Amendment Request 98-15

" Relocation of TS 3/4.7.10, ' Area Temperature Monitoring,'

To The Technical Requirements Manual" North-Atlantic Energy Service Corporation (North Atlantic) has enclosed herein License Amendment Request (LAR) 98-15. LAR 98-15 is submitted pursuant to the requirements of 10CFR50.90 and 10CFR50.4.

LAR 98-15 proposes a change to the Seabrook Station Technical Specifications. The change is based on the NRC's " Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors"(58 FR 39312), issued in July 1993, and; the results of the NRC StalT review of WCAP-ll618, " Methodically Engineered, Restructured and Improved Technical

. Specifications, Merits Program - Phase 11 Task 5, Criteria Application," including ' ddendum 1, A

' as documented in a letter dated May 9,1988 to R. A. Newton, Chairman of the Westinghouse Owners Group (generically referred as the NRC STS Split Report). The proposed change involves the-relocation -of Technical Specification (TS) 3/4.7.10, " Area Temperatwe

. Monitoring," and associated TS Table 3.7-3, to the Seabrook Station Technical Requirements Manual _(SSTR). The SSTR is referenced in the Seabrook Station Updated Final Safety Analysis Report and is the implementing manual for the Technical Specifications Improvement Program referenced in Section 6.7 of the Technical Specifications.

I li'

\\

7 j3 9

L 0

t 9812240130 981216 PDR ADOCK 05000443

[

P PM i

'S -

' U S Nuclear Regulatory Commission NYN-98131/ Page 2 Similar License Amendment changes have been approved by the NRC Staff, e.g., Shearon Harris Nuclear Power Plant (Amendment No. 62, issued August 28,1995), and Vogtle Units I and 2 (Amendment Nos. 83 and 61, respectively, issued January 23,1995).

LAR 98-15 has been reviewed and approved by the Station Operation Review Committee and the Nuclear Safety Audit Review Committee.

As discussed in the enclosed LAR Section IV, the proposed change does not involve a significant hazard consideration pursuant to 10CFR50.92. A copy of this letter and the enclosed LAR have been forwarded to the New Ilampshire State Liaison Officer pursuant to 10CFR50.91(b).

North Atlantic requests NRC Staff review of LAR 98-15 and issuance of a license amendment by June 15,1999 (see Section V enclosed). North Atlantic has determined that LAR 98-15 meets the criteria of 10CFR51.22(c)(9) for a categorical exclusion from the requirements for an Environmental Impact Statement (see Section VI enclosed).

Should you have any questions regarding this letter, please contact Mr. Terry L. Harpster, Director of Licensing Services, at (603) 773 7765.

Very truly yours,

. NORTH ATLANTIC ENERGY SERVICE CORP.

[

A fed C. Feigenbaum /'

Executive Vice President and Chief Nuclear Oflicer cc:

H.'J. Miller, NRC Regional Administrator

. J. T. Harrison, NRC Project Manager, Project Directorate 1-3 R. K. Lorson, NRC Senior Resident inspector Mr. Woodbury P. Fogg, P.E., Director New Hampshire Office of Emergency Management State Office Park South 107 Pleasant Street Concord,NH 03301

,a

4 J

+

n--

a a

w-,

s+-Ju.

a am,.-

u m

Je....A-

.a AA

&a-s..,m.a,6 a

e e

s 8

ENCLOSURE 1. TO NYN-98131

.