ML20198E265
| ML20198E265 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 11/05/1985 |
| From: | Reinaldo Rodriguez SACRAMENTO MUNICIPAL UTILITY DISTRICT |
| To: | Martin J NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| RJR-85-541, NUDOCS 8511130243 | |
| Download: ML20198E265 (1) | |
Text
($SMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT C 6201 S Street. P.O. Box 15830, Sacramento CA 95852-1830,(916) 452-3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA RJR 85-541 November 5, 1985 J B MARTIN REGIONAL ADMINISTRATOR REGION V 0FFICE OF INSPECTION AND ENFORCEMENT ATTENTION DOCUMENT CONTROL DESK U S NUCLEAR REGULATORY COMMISSION WASHINGTON DC 20555 DOCKET NO. 50-312 LICENSE N0. DPR-54 NOTICE OF VIOLATION FOR IE INSPECTION 85-08
REFERENCE:
July 17, 1985 Letter, R. J. Rodriguez, SMUD to J. B. Martin, NRC, same subjec.
In the referenced letter, the District committed to upgrading four (4) pro-cedures related to the battery testing of the 125V DC system by October 15, 1985. Because of an unexpected increased workload on our electrical per-sonnel resulting from startup problems, this committed completion date was not met.
The status of the procedures is as follows:
SP 206.04 - Draft revision has been completed.
EM.104 Upgrade has been completed.
EM.105
- Upgrade is in final review.
EM.106
- Draft revision has been completed.
All of the procedures will be completed and full compliance achieved by December 13, 1985.
If there are any questions concerning this matter, please contact Mr. R. W.
o at the Rancho Seco Nuclear Generating Station.
l R. ). 0DRIGU ASSISTANT GENE AL MANAGER, NUCLEAR 8511130243 851105 I
gDR ADOCK 05000312 h
PDR i
RANCHO SECO NUCLEAR GENERATING STATION O 1444o Twin Cities Road, Herald, CA 95638-9799;(209) 333-2935 L._