| ML20198D522 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 05/18/1992 |
| From: | Gardner R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20198D527 | List: |
| References | |
| NUDOCS 9205210062 | |
| Download: ML20198D522 (2) | |
See also: IR 05000295/1992008
Text
4
- h
MAY 181392
Docket No. 50-295
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Senior Vice President
Licensing Department-Suite 300
Opus West III
1400 Opus Place
Downers Grove, IL
60515
Dear Mr. Reed:
This refers to the inspection conducted by Mr.
K.
D. Ward of this
office on March 23-24, 30-31, April 1,
9-10, 24, and May 12,
1992.
The inspection included a review of authorized activities
for your Zion Station, Unit 2 facility.
The focus of this
inspection was your inservice inspection efforts.
At the
conclusion of the inspection, the findings were discussed with
those members of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the
report.
Within these areas, the inspection consisted of
sels :tive examinations of procedures, representative records,
observation of activities and interviews with personnel.
No violations of NRC requirements were identified during the
course of this inspection.
.
In accordance with 10 CFR 2.790 of the Commission's regulations,
a copy of this letter and the enclosed inspection report will be
placed in the NRC Public Document Room.
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
Original signed by R. N. Gardner
R.
N.
Gardner, Acting Chief
Engineering Branch
Enclosures:
1.
Inspection Report
No. 50-295/92008(DRS)
2.
Mr.
C.
Dodd Trip Report
dated April 14, 1992
See Attached Distribution
~
RIII
.I
RIIL
RIII
Q'(V
-
flQf-
Ah
y
fsWard/jk
son
Farber
Gardner
05/18/92
05/g3/92
05/g /92
05//$ /92
1
9205210062 920518
i
ADOCK 05000295
O
i
1
<1, L, f
S
-
4
I
.
Commonwealth Edison Company
2
MAy ] g ;gg7
pistribution
cc w/ enclosures:
M.
J.
Wallace, Vice President-
PWR Operations
T.
Kovach, Nuclear Licensing
Manager
R.
Chrzanowski, Regulatory
Assurance Supervisor
T. Joyce, Station Manager
DCD/DCB (RIDS)
OC/LFDOB
Resident Inspectors-Byron,
Braidwood, Zion
Richard Hubbard
Mayor, City of Zion
J ..
W.
McCaffrey, Chief
Public Utilities Division
C.
Patel, LPM, NRR
Robert Newmann, Office of Public
Counsel, State of Illinois
Center
Robert M. Thompson, Administrator
Wisconsin Division of Emergency
Government
State Liaison Officer