ML20198D396
| ML20198D396 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 05/14/1992 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20198D401 | List: |
| References | |
| NUDOCS 9205210023 | |
| Download: ML20198D396 (3) | |
See also: IR 05000277/1992009
Text
._.
.
_ . . . _ .
n
.._a
4
1
,
kitY1 4 092
s
Docket /Lic6nse No. 30-277/DPR-44
50-278/DPR-56
hir. D. ht. Smith
Senior Vice PresNent-Nuclear
Philadelphia Electric Company
_,
Correspondence Control Ded
P. G.110r.195-
Wayne, PA 19087-0195
'
Dear hir. Smith:
SUllJECT:
COh1BINED INSi>ECTION 50-277/92-09 AND 50-278/92-09
,
!
'Ihis letter transmits the findings of the resident safety inspection conducted by hiessrs. J. J.
Lyash and L. E. hiyers, his bl. G. Evans and others from h1 arch 31,1992 through hiay 4,
1992, at the Peach Bottom Atomic Power Station, Delta, Pennsylvania.- The inspectors based
'
these findings on observation of activities, interviews and document reviews, and discussed them
with hir. K. P. Powers of your staff. The inspectors noted that your oversight of activities
_
during the period continued to be very good. Reactor operator's and shift supervision handled
i
'
the April 7 shutdown of Unit 2 in an excellent manner.
a
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
its enclosure will be p! aced in the NRC Public Document Room. We appreciate your coopera-
tion.
Sincerely,
m
- -;
g,
[U:. .D C. kE l:LC3
Edward Wenringer, Chief
Projects Branch 2 =
Division of Reactor Projects
Enclosure: NRC Region I Combined Inspection Report 50-277/92-09 and 50 278/92-09
,
>
!
'
'
.[
9205210023 920S14
i
ADOCK0500g7
DR
..
_
.
.
--
. - .
_
.
.
.
. . .
J
l'
.
.
,
.
.
Philadelphia Electric Company
2
cc w/ encl:
D. B. Miller, Vice President, Peach Bottem Atomic Power Station
D. R_. Helwig, Vice President, Nuclear Engineering and Services
K. P. Powers, Plant Af anager, Peach Bottom Atomic Power Station
J, 'W. Austin, Project Manager, Peach htom Atomic Power Station
E. J. Cullen. Esquire, Assistant General Counsel (Without Report)
G. J. Beck, Jr., Manager, Licensing Section
R. N. Charles, Chairman, Nuclear Review Board
,L A. Fulvio, Regulatory Engineer, Peach Bottom Atomic Power Station
C. Schaefer, External Operations-Nuclear, Delmarva Power & Light Co.
J. A. :sabe la, Director, Generation Projects Department, Atlantic Electric
B. Gorman, Manage, Futerned Affairs
!
J. W. Durham, Sr., Senior V(ce President and General Counsel
R. L. _Hovis, Esquire (Without Report)
R. McLean, Power Plant Siting, Nuclear Evaluations
J. H. Walter, Chief Engineer, Public Service Commission of Maryland
D. Poulson, Secretary of Harford County Council
R. Ochs, Maryland Safe Energy Coalition
K. Abraham, PAO (2)
Public Document Room (PDR)
,
Local Public Document Room (LPDR)
'
Nuclear Safety information Center (NSIC)
l
NRC Resident inspector
'
Commonwealth of Pennsylvania
,
TMl - Alert -
l
--
a
P
4
)
i
_
_ _ .
!
-
.
.
J
~
}
rr-
.
. -
,
.
.
.
Philadelphia Electric Company
3
bec w/ encl:
Region 1 Docket Room (with concurrences)
hianagement Assistant, DRMA (w/o enclosure)
E. Wenzinger, DRP
J. Lyash, DRP
J. Shea, NRR
J. Joyner, D_RSS
,
R. Lobel, EDO Office
'
R. McBrearty, DRS
D. Chawaga, DRSS
R. Paolino, DRS
W. Ruland, DRS
l
bec w\\ letter and Executive Summary only:
W. Hehl, DRP
,
J. Wiggins; DRP
W. Ikxiges, DRS
C. Anderson, DRS
L. Bettenhausen, DRS
R. Cooper, DRSS
T. Kenny, SRI-Limerick
is. Norris, PI Shoreham
C. Miller, NRR
i
r
i
s
'
CONCURRENCPS: f W
/Y
Rl:
p,) RP
/Dh'i j '
,
,
Ivans
Lyash
LWenzinger
v f 6/
f/0/
f/f/jp
a
OFFICIAL RECORD COPY
h
2
s
+.e-ees.3. ' . ,- - .
n
,,,w,..,
,,r
- , .
.
.,,.,.._,-.......,,,,.u.,,
yw w ,.
w es,-=-..,w.m..-
.-w--.
-,-%r-
--
,.w.,-y,.e.v,,we-,
-,.,.m
e
n
.w,
e--
.
-