Forwards Permanent,Partial Exemption from Requirements of 10CFR50,appendix J,Section III.D.2(b)(ii) Re Containment Air Lock Pressure Test
ML20198D319
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 05/07/1992
From: Kokajko L
Office of Nuclear Reactor Regulation
To: Cross J
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20198D321 List:
References
TAC-M83075, NUDOCS 9205200113
Download: ML20198D319 (4)


Text

._.

May 7, 1992 Docket No. 50-344 Mr. James E. Cross Vice President, Nuclear

-d Portland General Electric Company 121 S.W. Salmon Street Portland, Oregon 97204

Dear Mr. Cross:

SUBJECT:

PERMANENT, PARTIAL EXEMPTION FROM THE REQUIREMENTS OF 10 CFR PART 50, APPENDIX J, SECTION Ill.D.2 (b)(li) REGARDING CONTAINMENT AIR LOCK PRESSURE TEST (TAC NO. M83075)

By letter dated Aoril 1,1992, Portland General Electric Company, et al.,

requested a permanent, partial exemption from Title 10 of the Code of Federal Regulations, Part 50, Appendix J, paragraph III.D.2.(b)(ii).

The requested

]

exetption would allow the performance of a reduced pressure test at not less than 10 psig (rather than at P, of 60 psig) as is done for periods when containment integrity is required; provided, no maintenance or modifications that could affect sealing capability was performed on the air lock during the period.

Based on the considerations discussed in the exemption, we have concladed that the information provided and the actions described in the applications form an acceptable basis for the granting of an exemption. The Commission has determined, pursuant to 10 CFR 50.12, that this exemption is authorized by law and will not endanger life or property and is otherwise in the public interest.

The exemption is enclosed. A copy of the exemption is being forwarded to the Office of the Federal Register for publication.

Sincerely, Original Signed By:

Lawrence E. Kokajko, Senior Project Manager Project Directorate V Division of Reactor Projects Ill/IV/V Office of Nuclear Reactor Regulation

Enclosure:

DISTRIBUTION:

As stated See next page g

nmLp j'Id hQ gMf t

cc w/ enclosure:

See next page OFC:

PDV/LA :PDV/PM :PDV/PM :PDV/PD :SP

0
ADR/4/5
D:3/4

[hajko:TQua

~

MVigho NAME: DFoste Mssa
CMcCr ken:
BBo r DATE:f//93:

P/92:f/F/92: 4/d/92:d.;24/92

q/Q/92: '/ '2 92:fff/92 M

/

0FFICIAL RECORD COPY DOCUMENT NAME TJ83075.EXM h

38P98s!R8?8886 P

PDR i

/pa h00g%,

UNITED STATES

!" 3 NUCLEAR REGULATORY COMMISSION

^,

o h' A W ASHINGT ON, D. C. 20V 5

?

%, 5 1

G

/

May 7, 1992 l

Docket No. 50-344 Hr. James E. Cross Vice President, Nucleat Portland General Electric Company 121 S.W. Salmon Street Portland, Oregon 9H04

Dear Hr. Cross:

SUBJECT:

PERMANENT, PARTIAL EXEMPTION FROM THE REQUIREMENTS OF 10 CFR PART 50, APPENDIX J, SFCTION lll.D.2.(b)(ii) REGARDING CONTAINMENT AIR LOCK PRESSURE TEST (TAC NO. M83075)

By letter dated April 1,1992, Portland General Electric Company, et al.,

requested a permanent, partial exemption from Title 10 of the Code of Federal Regulations, Part 50, Appendix J, paragraph Ill.D.2.(b)Pii). The requested exemption would allow the performance of a reduced pressure test at not less than 10 psig (rather than at P of 60 psig) as is done for periods when containment integrity is requi, red; provided, no maintenance or modifications that could affect sealing capability was performed on the air lock during the period.

Based on the considerations discussed in the exemption, we have concluded that the information provided and the actions -Jescribed in the applications form an acceptable basis for the granting of an exemption. The Commission has determined, pursuant to 10 CFR 50.12, that this exemption is authorized by law and will not endanger life or property and is otherwise in the public interest.

The exemption is enclosed, t ey of the exemption is being forwarded to the Office of the Federal Register for publication.

Sincerely,

(

Lawrence E. Kokajko, Senior Project Manager Project Directorate V Division of Reactor Projects llI/IV/V Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

s See next page b

_ - _ _. _ _ - - - - -. - - - _ _ - - - - _ - _- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ - - - -

4. '

Mr. James E. Cross Poitland General Electric Company Trojan Nuclear Plant cc:

Senior Resident inspector U.S. Nuclear Regulatory Comission Trojan Nuclear Plant Post Office Box 250 Rainier, Oregon 97048 Mr. Michael J. Sykes, Chairman Board of County Commissioners Columbia County St. Helens, Oregon 97501 Mr. David Stewart-Smith Oregon Department of Energy Salem, Oregon 97310 Regional Administrator, Region V U.S. Nuclet.r Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. Tom Walt General Manager, Technical functions Trojan Nuclear Plant 71760 Columbia River Highway Rainier, Oregon 97048 l-l t