ML20198D167
| ML20198D167 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 12/14/1998 |
| From: | Capra R NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20198D173 | List: |
| References | |
| NUDOCS 9812230023 | |
| Download: ML20198D167 (4) | |
Text
ga atav
&p
'o.
- h.,y
-"g UNITED STATES 4
j
,g NUCLEAR REGULATORY COMMISSION o, ;'...../
WASHINGTON, D.C. 20515 0001 s
DUQUESNE LIGHT COMPANY OHIO EDISON COMPANY THE CLEVELAND ELECTRIC ILLUMINATING COMPANY THE TOLEDO EDISON COMPANY DOCKET NO. 50-412 DEAVER VALLEY POWER STATION. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 95 License No. NPF-73 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Duquesne Light Company, et al. (the licensee) dated September 24,1998, as supplemented November 3: 1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter l; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can ce conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
9012230023 981214 PDR ADOCK 05000412 p
. _... -. _.. ~... -... -. - - - -.... - _ _ -
-. -..~... -..-.
i t
2-2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-73 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appenda A, as revised through Amendment No. 95, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated in the license. DLCO shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance, to be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION 5 O Q.. CQ Robert A. Capra, Director Project Directorate 1-2 Division of Reactor Projects - t/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of issuance: December 14, 1998 l
l l
4 l
l i
. - ~.
= - _ -.
ATTACHMENT TO LICENSE AMENDMENT NO. 95 FACILITY OCERATING LICENSE NO. NPF-73 DOCKET NO. 50-412 1
Replace the following page of the Appendix A Technical Specifications with the enclosed page as indicated. The revised page is identified by amendment number and contains vertical lines indicating the areas of change.
1 Remove lnsert 3/4 1-15 3/4 1-15 L
l l
i
+
J
. -. - ~.. ~. _..
~. -. -. -.
'NPF-73 l
k REACTIVITY CONTROL SYSTEMS BORATED WATER SOURCES - OPERATING l
LIMITING CONDITION FOR OPERATION l
3.1.2.8 As a minimum, the following borated water source (s) shall be OPERABLE as required by Specification 3.1.2.2.
a.
A boric acid storage system with:-
j 1.
A minimum usable volume of 13,390 gallons, l
l 2.
Between 7000 and 7700 ppa of boron, and
)
l l
3.
A minimum solution temperature of 65'F.
l b.
The refueling water storage tank with:
1.
A minimum usable volume of 859,248 gallons, l
2.
A boron concentration between 2000 and 2100 ppa, and l
3.
A solution temperature of 2 45*F and 5 50*F.
l APPLICABILITY:
MODES 1, 2,
3&4.
l ACTION:
l a.
With the boric acid storage system inoperable, restore the l
storage system to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY and borated to a SHUTDOWN MARGIN equivalent to at least 14 Ak/k at 200*F within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore the boric acid storage system to OPERABLE status within the next 7 days or be in COLD SHUTDOWN within j
the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
1 b.
With the refueling water storage tank inoperable, restore the tank to OPERABLE status within one hour or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD J
SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQUIREMENTS 4.1.2.8 Each borated water source shall be demonstrated OPERABLE:
4 i
i
)
i l
BEAVER VALLEY - UNIT 2 3/4 1-15 Amendment No. 95 4