ML20198D163
| ML20198D163 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 05/11/1992 |
| From: | Pederson C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Schnell D UNION ELECTRIC CO. |
| References | |
| NUDOCS 9205180208 | |
| Download: ML20198D163 (1) | |
Text
() c 0 6
MAY 111992 s
Docket flo. 50-483 Union Electric Company ATTil: 11r. Donald F. Schnell Senior Vice President - fluclear Post Office Box 149 - Mail Code 400 St. Louis,110 63166
Dear tir. Schnell:
This acknowledges receipt of fir. G. Randolph's letter dated tiarch 16, 1992, which transmitted changes identified as Revision 18 of the Callaway Plant Physical Security Plan submitted under the provisions of 10 CFR 50.54(p).
We have reviewed the submitted changes and have determined that they are consistent with the provisions of 10 CFR 50.54(p) and are therefore acceptable.
The enclosure to your letter contained Safeguards Information of a type specified in 10 CFR 73.21 and is being withheld from public disclosu.e.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the itRC Public Document Room.
Sincerely, T
" Original signe:! by Cynthia D. Pederson" Cynthia D. Pederson, Chief Reactor Programs Branch cc: See Attached List bcc:
!!RR/DRIS/RSGB SG Case File: 0500048335WA SG Inspector File:
G. Ch.istoffer SG Correspondence file:
G. Pirtle flRR Docket File:
., c., b a
-en
.i u u Rlli RIII RIII ITT 3I T7f Y3
(?d
%?,
f M
g, 'e Pe erson Pirtle/jp C'hri ttof f e r Fig
- ed 05/8 /92
)
R/ffu S,lh'iL y
gk0 9205180208 920511 PDR ADOCK 05000483 y\\g F
- - - - _ _ _ _ _ _ _ _ _ _