ML20198D163

From kanterella
Jump to navigation Jump to search
Advises That 920316 Rev 18 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable
ML20198D163
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/11/1992
From: Pederson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
References
NUDOCS 9205180208
Download: ML20198D163 (1)


Text

6 () c 0 MAY 111992 s

Docket flo. 50-483 Union Electric Company ATTil: 11r. Donald F. Schnell Senior Vice President - fluclear Post Office Box 149 - Mail Code 400 St. Louis,110 63166

Dear tir. Schnell:

This acknowledges receipt of fir. G. Randolph's letter dated tiarch 16, 1992, which transmitted changes identified as Revision 18 of the Callaway Plant Physical Security Plan submitted under the provisions of 10 CFR 50.54(p).

We have reviewed the submitted changes and have determined that they are consistent with the provisions of 10 CFR 50.54(p) and are therefore acceptable.

The enclosure to your letter contained Safeguards Information of a type specified in 10 CFR 73.21 and is being withheld from public disclosu.e.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the itRC Public Document Room.

Sincerely, T " Original signe:! by Cynthia D. Pederson" Cynthia D. Pederson, Chief Reactor Programs Branch cc: See Attached List bcc:  !!RR/DRIS/RSGB SG Case File: 0500048335WA SG Inspector File: G. Ch.istoffer SG Correspondence file: G. Pirtle flRR Docket File:

., -en

.i cu .,

u b a RIII RIII ITT 3I T7f Rlli

(?d  %?, f '

M Fig g, 'e Y3 Pirtle/jp C'hri ttof f e r  ; ed Pe erson 05/8 /92 )  ; R/ffu S,lh'iL gk0 y

> 9205180208 920511 PDR y\g F ADOCK 05000483 PDR

- - - - _ _ _ _ _ _ _ _ _ _