ML20198C915
| ML20198C915 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 12/31/1997 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Horn G NEBRASKA PUBLIC POWER DISTRICT |
| References | |
| NUDOCS 9801080082 | |
| Download: ML20198C915 (4) | |
Text
.
a**p**Coqk; UNITED STATES
~ $.'
- g --
NUCLEAR REGULATORY COMMISSION u
-)
= REuloN IV a-sit nYAN PLAZA DRIVE s'JITE 400.
%, * * " *,8 -
ARUNGTON. TEXAS 76011 8004
!b
- DEC 3 l Ll997 s
i.
G. R. Horn, Senior Vice President of Energy Supply.
Nebraska Public Power District 141415th Street.
' Columbus, Nebraska 68601
Dear Mr. Hom:
During a telephone conversation on December 29,1997, between Mr. E. E. Collins of my staff and Mr. Mike Peckham of your staff, Nebraska Public Power District changed its commitment to have essential electrical power installed to the elevated release point sump pumps. Although you originally intended to have the modificauon installed by December 31,1997, your subsequent reviews indicated that it was more prudent to install the modifbation during the midcycle outage scheduled to begin on February 28,1998, or during an unplanned outage if one occurs before this time. We agree that operational safety is better served by this minor schedule delay. The purpose of this letter is to request confirmation of this commitment. Please confirm this commitment in writing within 30 days of the date of this letter.
Thank you for your cooperation. Should you have any quest'ons concerning this matter, please contact me or Mr. E. E. Collins of my staff at 817/860-8291 Sin Thomas P. Gwy n, Di cto Division of Reacto oje s Docket No.: 50-298 License No.: DPR-46 cc:
John R. McPhail, General Counsel Nebraska Public Power District P.O. Box 499 Columbus, Nebraska 68602-0499 P. D. Graham, Vice President of Nuclear Energy Nebraska Public Power District
+
P.O. Box 98
'gkyd.
, ff Brownville, Nebraska 68321 ti 1. i, i 9901000082 971231 PDR ADOCK 05000298 P
6:., -
yi
~
9 Nebraska Public Power District !
- 8. L. Houston l Nuclear Licensing -
and Safety Manager -
1
' Nebraska Public Power District P.O. Box 98 Brownville, Nebraska' 68321 Dr. William D. Leech MidAmerican Energy 907 Walnut Street P.O. Box 657-Des Moines, Iowa 50303-0657 Mr. Ron Stoddard Lincoln Electric System
- 11th and O Streets Lincoln, Nebraska 68508 Randolph Wood, Director -
Nebraska Department :f Environmental Quality -
P.O. Box 98922 Lincoln,' Nebraska 88509-8922 Chairman Nemaha County Board of Commissioners Nemaha County Courthouse 1824 N Street -
Aubum, Nebraska 68305 Cheryl Rogers, LLRW Program Manager Environmental Protection Section Nebraska Department of Health 301 Centennial Mall, South P.O.- Box 95007 Lincoln, Nebraska 68509-5007
~
R. A. Kucera, Department Director of Intergovemmental Cooperation Department of Natural Resources P.O. Box 176
. Jefferson City, Missouri 65102 Kansas Radiation Control Program Director s
+
1'$'
f-4~
i{
r Nebraska Public Power District 3 DEC 31 1997!
L:_
bec to DCD (IE01) -
- bec distrib, by RIV;
- y Regional Administrator Resident inspector
- DRP Director DRS-PSB Branch Chief (DRP/C).
MIS System
- Branch Chief (DRP/TSS)
RIV File Project Engineer (DRP/C) 4
[
To receive copy of document, Indicate in box: "Q" = Copy without enclosures "E" = Copy with enclosures "N" = No copy i RIV:C:DRP/C 2 r.. D:DRP M,
EECollins:df 7 60 TPGwynn77 6
I4 /lol O
]2. /J i /
. OFFICIAL-RECORD COPY
-: e <..
,t-L
ir -
bec distrib.' by RIV.-
Regional Administrator Resident inspector
.DRP Director -
DRS-PSB
. Branch Chief (DRP/C).
MIS System Branch Chief (DRP/TSS)
RIV File -
Project Engineer (DRP/C) t 0
080019 To receive copy of document,1ndicate in box: "9" = Copy without enclosures "E" = Copy with enclosures "N" = No copy -
RIV:C:DRP/CE z r.e D:DRP 1),
l EECollins:df'Fgio TPGwynn77 IL liol 9 ?
Jg. fJ l l OFFICIAL RECORD COPY 4