Forwards Rev 3 to PECO-COLR-P3C12, COLR for PBAPS Unit 3, Reload 11,Cycle 12, Incorporating Revised ARTS flow- Dependent MCPR & MAPLHGR Thermal Limit Curves
ML20198C667
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 12/14/1998
From: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198C671 List:
References
NUDOCS 9812220134
Download: ML20198C667 (1)


Text

.

w.

5 A

TS 5.6.5.d v

PECO NUCLEAR eccosme,ovcomgemv A Unit of PECO Energy Nuclear Group Headquarters 965 Chesterbrook Boulevard Wayne PA 19087-5691 December 14,1998 Docket No. 50-278 License No. DPR-56 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington DC 20555

Subject:

Peach Bottom Atomic Power Station, Unit 3 Issuance of the Core Operating Limits Report for Reload 11, Cycle 12, Revision 3

Dear Sir / Madam:

Enclosed is a copy of the Core Operating Limits Report (COLR) for Peach Bottom Atomic Power Station (PBAPS), Unit 3, Reload 11, Cycle 12 (Revision 3). Revision 3 of this report incorporates revised ARTS Flow-Dependent MCPR and MAPLHGR thermallimit cura s.

This COLR is being submitted to the NRC in accordance with PBAPS, Unit 3 Techn' cal Specifications (TS) Section 5.6.5.d.

If you have any questions, please do not hesitate to contact us.

V ly yourg l

arrett D. Edwards Director - Licensing Enclosure cc:

H. J. Miller, Administrator, Region I, USNRC (w/ Enclosure)

A. C. McMurtray, USNRC Senior Resident inspector, PBAPS (w/ Enclosure)

I

/1 O

9812220134 981214

[T

/

PDR ADOCK '05000278 !

P PDR I

i