w.
5 A
PECO NUCLEAR eccosme,ovcomgemv A Unit of PECO Energy Nuclear Group Headquarters 965 Chesterbrook Boulevard Wayne PA 19087-5691 December 14,1998 Docket No. 50-278 License No. DPR-56 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington DC 20555
Subject:
Peach Bottom Atomic Power Station, Unit 3 Issuance of the Core Operating Limits Report for Reload 11, Cycle 12, Revision 3
Dear Sir / Madam:
Enclosed is a copy of the Core Operating Limits Report (COLR) for Peach Bottom Atomic Power Station (PBAPS), Unit 3, Reload 11, Cycle 12 (Revision 3). Revision 3 of this report incorporates revised ARTS Flow-Dependent MCPR and MAPLHGR thermallimit cura s.
This COLR is being submitted to the NRC in accordance with PBAPS, Unit 3 Techn' cal Specifications (TS) Section 5.6.5.d.
If you have any questions, please do not hesitate to contact us.
V ly yourg l
arrett D. Edwards Director - Licensing Enclosure cc:
H. J. Miller, Administrator, Region I, USNRC (w/ Enclosure)
A. C. McMurtray, USNRC Senior Resident inspector, PBAPS (w/ Enclosure)
I
/1 O
9812220134 981214
[T
/
PDR ADOCK '05000278 !
P PDR I
i