Notifies of 900410 Meeting W/Nrc in Rockville,Md Re Facility Simulator & Closeness of Delivery Date to Certification Date,Per
ML20198C400
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/28/1990
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Hunemueller N
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-90-015, CON-NRC-90-15 VPNPD-90-096, VPNPD-90-96, NUDOCS 9107020394
Download: ML20198C400 (1)


Text

_

Wisconsin

'lik>Ch7C POWER COMPANY 231 W Michigart Po Box 2046.Mw.xMe W153201 (414)221-2345 VPNPD-90-096 NRC-90-015 11f E71^/7 -

L 2B VO February 28, 1989 F

gA/

FEDERAL EXPRESS I

U.

S.

NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station P1-137 Washington, D.

C.

20555 Attention:

Mr. Neal Hunemueller Operator Licensing Branch OWFN-10D18 Gentlemen:

DOCKETS 50-266 AND 50-301 PLANT SIMULATOR PRESENTATION POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 As stated in our October 11/ 1989 letuce (NRC-89-124), it is

~

important that we brief the NRC staff on some of the specifics of the Point Beach Nuclear Plant rimulator and the closeness of the delivery date to the certification date.

Accordingly, through arrangements made with the NRC Project Manager, the presentation will be held at 1:00 p.m. on April 10, 1990, in the NRC White Flint offices.

Enclosed is a folder containing material to be presented at the meeting.

Please contact our Simulator Coordinator, Steve Pullins, at 414-755-2321 if you have any questions concerning this matter.

Very truly yours, 50 deu y C. W.

F Vice President Nuclear Power Enclosure (3 folders)

Copies to NRC Regional Administrator, Region III (withaut enc.)

NRC Resident Inspector (wittout enc.)