ML20198B891

From kanterella
Jump to navigation Jump to search
Forwards Brief Description of NRC Activities in Umtrap for Period of 851001-860930 Per Request
ML20198B891
Person / Time
Issue date: 10/16/1986
From: Martin D
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Themelis J
ENERGY, DEPT. OF
References
REF-WM-39, TASK-TF, TASK-URFO NUDOCS 9801070100
Download: ML20198B891 (2)


Text

_-

bbd g,,,,,g'o UNITED STATES

[ % eq ' 'g NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

/

OCT : 8 WS o

P John G. Themelis, Project Manager S

ggeclyh. \\C Uranium Mill Tailings Project Office Of OCT 231986* 1 t.

Albuquerque Operations Office I p t

U. S. Department of Energy u.S. Ned4T PCM. '

P.O. Box 5400 cwnnaam A;

Albuquerque, NM Q1 rE'. tcetb" 6

Dear Mr. Themelis:

W In response to your request for input with regards to the UMTRA Project Annual Status Report, I am transmitting a brief description of NRC activities in UMTRAP for the period of October 1, 1985 through September 30, 1986.

h Should you have any questiont regcrding this transmittal, please contact Giorgio Gnugnoli of my staff.

Sincerely, A41 $

Dane. Martin,[SectionLeader Uranium Recovery Projects Section

_ Low-level Waste and Uranium Recovery Projects Branch Division of Waste Management Office of Nuclear Material Safety and Safeguards

Enclosure:

As stateo O

cc: w/ encl.

R. Dale Smith, URF0 J. Turi, DOE /HQ 9001070100 861016 PDR WASTE WM-39 PDR

~

o'

~

OCT :6 $8s..

ENCLOSURE Nuclear Requiatory Conmission (NRC) - NRC reviewed and commented on modifications to cooperative agreements with Utah, New Mexico, Idaho and Oregon.

CADSAR and NEPA documents reviewed by NRC included those for Green River, Slick Rock, Maybell, Naturita, Tuba City, Grand Junction, Monument Valley, Mexican Hat and Ambrosia Lake.

Remedial action plans and modifications reviewed by NRC in FY 1986 included Durango, Canonsburg, Lakeview, Shiprock, Salt Lake City, Ambrosia Lake, Tuba City, Mexican Hat, Monument Valley and Grand Junction.

Conditional tcr.currences in the selection of remedial action were provided for the Lakeview and Shiprock sites.

The Canonsburg dran certification of remedial action completion was reviewed and commented on by lll NRC. Construction design reviews and site inspections have included Canonsburg, Lakeview, Shiprock, Salt Lake City, Tuba City, Grand Junction, the Burrell PA Vicinity Property and Rifle.

Generic efforts have included establishment of final Standard Review Plans, revisions of the Memorandum of Understanding, institution of an NRC UMTRAP construction inspection guidance manual, and investigation of the feasibility of co-disposal of UMTRAP and active site uranium milling wastes.

PRC also reviewed DOE generic documents such as the Project Certification Plan, the Project Surveillance and Maintenance Plan, the Project Technical Approach Document and the Interim Ground-Water Protection Plan.

NRC has also continued to review VP REAs and completion reports associated with processing site cleanups.

The VP Certification Plan and a VPMIM modification were reviewed by NRC 1.n FY 1986.

O t

_ _ _