Advises That Commitments Per Re CRD Return Line Defect Complete,W/Exception of Metallographic Exam of Weld. Exam Cannot Be Completed Due to Inadvertent Disposal of Affected Piece of Piping
ML20198B584
Person / Time
Site: FitzPatrick 
Issue date: 11/01/1985
From: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Vassallo D
Office of Nuclear Reactor Regulation
References
JPN-85-81, NUDOCS 8511070073
Download: ML20198B584 (2)


Text

b 123 Man Street Whte Ptains. N ew York 10601 g

914 681.6240

  1. > NewYorkPbwer fat"ers,eem, tv Authority

- ' o-'-

November 1, 1985 IRE 85-81 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Attention:

Mr. Domanic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Control Rod Drive Return Line Defect

Reference:

1.

NYPA letter J.P. Bayne to D.B. Vassallo (NRC) dated July 7, 1983 (JPN-83-64), concerning the same subject.

Dear Sir:

During the 1983 Reload 5/ Cycle 6 refueling outage, inspection of the Control Rod Drive Return Line (CRDRL) revealed a through-wall weld defect in the three-inch piping upstream of the reactor vessel penetration.

Subsequent ultrasonic examination determined that the crack ran parallel to the fusion zone of the weld, in the heat affected area, for a circumferential distance of 3.5 inches.

In Reference 1, the Authority committed to: remove the affected piping: cap the reactor vessel nozzle permanently: conduct a metallographic examination of the joint to determine the extent and cause of this cracking; and, complete additional plant modifications in the 1985 Reload 6/ Cycle 7 refueling outage.

The Authority has fulfilled these commitments with the exception of the metallographic examination of the weld.

Due to an oversight, the affected piece of piping was not retained following its removal from the Control Rod Drive System.

The Authority inadvertently disposed of the affected piece along with the rest of the piping.

f k

8511070073 851101 f 0p PDR ADOCK 05000333 S

PDR g g L

e e

The Authority regrets that we are unable to fulfill this commitment.

If you have any questions on this matter, please contact Mr. J. A. Gray, Jr. of my staff.

Very truly yours, ohn C. Brons Senior Vice President Nuclear Generation cc:

Office of the Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 136 Lycoming, New York 13093