Discusses ASME Code Revs to Design Rules for Piping Sys. Believes That NRC Liaison Activities Has Accomplished Intended Purpose & That Valuable Technical Insights Developed by NRC Have Been Provided to Working Group
ML20198B557
Person / Time
Issue date: 12/23/1997
From: Sheron B
NRC (Affiliation Not Assigned)
To: Eisenberg G
AMERICAN SOCIETY OF MECHANICAL ENGINEERS
References
NUDOCS 9801070001
Download: ML20198B557 (4)


Text

_

ki t

L m swas.

g NUCLEAR REGULATORY COMMISSION

. wasumetom, o.c. senswam December 23, 1997

....e Mr. G. M. Eisenberg 4

Director, Nuclear Codes and Standards Amerloan Society of Mechanical Engineers 345 East 47th Street c

New York, NY 10017 2392

~

SUBJECT:

ASME CODE REVISIONS TO THE DESIGN RULES FOR PIPING SYSTEMS New rules for the design of ASME Class 1,2, and 3 piping systems were published in the 1994 Addenda of Section ill of the ASME Boliar and Pro 6sure Vessel Code, and were set:7suy i

I made part of the 1995 Code,.~ On May 24,1995, the NRC provided a summary of technical comments that led the staff to conclude the new piping rules were not soceptable and on May 25,1995, the NRC met with representatives of ASME to discuss the NRC's technical.

)

oomments. Subsequently the ASME established a Special Working Group (SWG) under the l

Subgroup on Design (SGD) to reexamine the piping design rules and recommend an appropriate action to the consensus committee. NRC designated two representatives to serve -

as observers on the SWG and to perform liaison activities with the SWG. In addition, NRC oc,mmitted to provide the SWG with information from an ongoing NRC research program that was investigating the seismic analysis of piping and the impact of the new design rules on the overall safety margins in piping systems.

I As you are aware, NRC liaison actiMies with the SWG have continued over the past two years.

Trip reports, summarizing the NRC observer's understanding of SWG activities and areas where staff concoms with the evaluations and decisions of the SWG remain, have been provided to NRC management and ASME Extensive work has been conducted by the Energy Technology Engineering Center (ETEC), under contract to NRC, to evaluate the technical basis for the new 1

piping seismic rules. This work has undergone peer review and has been made available to the 1

SWG, where it has received detailed scrutiny, Although the ETEC evaluation has not boon l

published as a final NUREG document, we believe it provides solid technical support for the NRC staffs conclusion that the technical basis for the new piping seismic rules was incomplete.

.j i

At this time, we believe NRC liaison activity has accomplished its intended purpose and that valuable technicalinsights developed by NRC have been provided to the SWG, Accordingly, we believe it is appropriate for any further development of piping doeign criteria to be pursued as i[

part of the normal code development process. NRC will continue to participate in the code g

M[UfES25IEACOPI gpg '

c-yd ASM i

- M ",

ll@l%AlII l

, -Q' I

M*!M"iA*}'g

-[

j y

.:_.._4....,#.

,.,m_,,,,g___,;..._._,

_.,_L;._a-,_._.,._..,

J

. m m,,,

..,,,...,..,,7

-.m.

l 4

t h

3 development and consensus process via its designated representatives to the Working Group

[

on Piping Design, SGD, and other Boiler and Pressure Vessel Committees, i

Sincerely, j

Original Signed by:

l Brian W. Sheron, Acting Associate Director l

for Technical Review Office of Nuclear Reactor Regulation 3

E. B. Branch 1

i DISTRIBUTION:

Flie Center PDR EMEB RF/CHRON Manoly AJMurphy NChokshi JFair KWichman PKuo MHartzman JCraig

'See previous concurrences DOCUMENT NAME:G:\\WESSMANWSMESWG.WPD To receive a copy of this document, Indicate in the box C* copy w/o attachment / enclosure E= Copy with attachment / enclosure N=No copy

~

A OFFCE EMEB.DE C (A)DD/DE:NRR (A)D-DE:NRR g;DIR:RES (A)'ADhRR NAME RWessman-JStrosnider Glainas

. MD BSher[

DATE 12/18/97*

12/19/97*.

12/18/97*

IL/tt/97 M12/97 ~

k T

qp h

4-i 2

direct NRC liaison with the SWG is no longer necessary. NRC will continue to participate in the code development and consensus process via its designated representatives to the Working Group on Piping Design, SGD, and other Boiler and Pressure Vessel Committees.

Sincerely, i

Brian W. Sheron, Acting Associated Director for Technical Review cc:

R. W. Barnes E. B. Branch 1

DISTRIBUTION:

File Center PDR-EMEB RF/CHRON

. KManoly AJMurphy NChokshi JFair KWichman PKuo MHartzman JCraig DOCUMENT NAME:G:\\WESSMAN%SMESWG.WPD To remlve a copy of this document, indicate in the box C= copy w/o attachment / enclosure E= copy wdh attachment / enclosure N=No copy OFFICE EMEB.D(

p

($DE:NRR D.DIR:RES (A)ADT NRR NAME Rh Ghas LShao BSheron DATE 4/k7 -

kdD97

/. /97

/ /97 (I 100 0/20I hiIfl9!47 i

I L_.-