Text
C Y.USEC A GWI Enery Company December 22,1997 Mr. Robert C. Pierson SERIAL: GDP 97-0214 Chicf, Special Projects Branch Division ofFuel Cycle Safety and Safeguards, NMSS United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 Portsmouth Gaseous Diffusion Plant (PORTS)
Docket No. 70-7002-Notification of a Deletion of a Regulatory Commkment
Dear Mr. Pierson:
This letter provides notifici i ; a (' '9 tic, of a regulatory commitment concerning autoclave containment valves. The sp ins ( 't'nis come 'tnent and thejustification for deletion are provided below.
Dflgription of Commitment USEC letter GDP 97 06.
4 arch 1,1997, e r smitted to the Nuclear Reg"latory Commission (NRC) a list of or r
.ent of Energy (DOE) regulatory commitments as required by Issue 1 of the Plan
.ng Compi me with NRC Regulations. Enclosure 2 of this letter provided the follo nitment:
o (UX95104345)
"The Pror Autoclave Nuc.tr f afety Upgrade Project (#J20340) calls for the nu, ciave tntainment valve to be upgraded to a bellows sealed globe-tyr valve. i... apgrade will reduce seat and stem icakage
/'[
associate i with this valve."
The obe date for the abe-commitment is December 30,1997.
9001060203 971222 P
6903 Rockledge Drive. Bethesda. htD ~2081', 818 Telephone-301564 32.0 Fax 301564-3201 http:#www.usec.com.
Omca in ljvermore, CA Paducah. iW lbrismouth. OH Tashington, DC '
e
l
\\
\\
l Mr. Robert C. Pierson Decer'nber 22,1997
?
GDP 97 0214, Page 2 Justification for Deletion The above commitment was originally generated as part of the corrective ac' ions for DOE Event Report PTS 95 138 dated September 12,1995, concerning an autoclave containment valve that had leakage through the seat and stem, caused by wear of the valve plug sleeve. Subsequent to this commitment, a PORTS Compliance Plan issue was developed that requires upgrades to the autoclave containment valves. As part of the modifications being performed to complete this Compliance Plan action, bellows scaled globe-type valves are being installed which reduce the seat and stem leakage. The Plan of Action and Schedule for PORTS Compliance Plan issue 3 states that this modification will be completed by May 1,1998, for the first of thirteen autoclaves and that the remaining autoclaves will be completed by February 1,2001. Thejustification for continued operation (JCO) with the current design is provided in the JC0 associated with thi*
Compliance Plan issue.
Therefore, USEC is deleting the commitment that originated from DOE Event Report PTS-95 138 since it is similar to the commitment referred to in the PORTS Compliance Plan.
If you have any questions or require additionalinformation, please contact Ron Osston at (614) 897 2".s. There are no new commitments contained in this submittal.
Sincerely, 6.Q 6Ak Steven A. Toelle Nuclear Regulatory Assurance and Policy Manager cc:
NRC Resident inspector PORTS i