ML20198B076

From kanterella
Jump to navigation Jump to search

Informs That Coc GDP-2 Is Amended by Adding Addl Commitment to Tsr 3.11.1,to Identify SSCs & Support Sys Necessary to Meet NCS Double Contingency Principle IAW 970616 Application & Per 10CFR76
ML20198B076
Person / Time
Site: Portsmouth Gaseous Diffusion Plant
Issue date: 12/12/1997
From: Paperiello C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: John Miller
UNITED STATES ENRICHMENT CORP. (USEC)
Shared Package
ML20198B082 List:
References
TAC-L32035, NUDOCS 9801060188
Download: ML20198B076 (2)


Text

-

. ., December 12, 1997 Mr. J,ames H. Miller -

Vice President, Production -

U. S. Enrichment Corporation 2 Democracy Center 6903 Rockledge Drive -

Bethesda, MD 20817

SUBJECT:

CERTIFICATE AMENDMENT REQUEST- PORTSMOUTH GASEOUS DIFFUSION PLANT COMMITMENT TO IDENTIFY STRUCTURES, SYSTEMS AND COMPONENTS (SSCs) NECESSARY TO MEET NUCLEAR CRITICALITY SAFETY (NCS) DOUBLE CONTINGENCY PRINCIPLE (TAC NO. L32035)

Dear Mr. Miller.

In accordance with your applicatior dated June 16,1997, and pursuant to Part 76 to Title 10 of the Code of Federal Regulations, Certificate of Comp"ance GDP-2 is hereby amended by adding to TSR 3.11.1, an additional commitment to identify SSCs and support systems necessary to meet the NCS double contingency principle. Accordingly, Condition 9 has been revised to include the date of June 16,1997.

All other conditions of this certificate shall remain the same.

Enclosed is a copy of the revised Ceificate of Compliance.

Sincerely, f

[0riginal signed by:] ,

Carl J. Paperiello, Director Office of Nuclear Material Safety ) g and Safegitards Docket 70-7002 i Certificate GDP-2 Amendment 07 gg E CENTER cap

Enclosure:

Certificate of Compliance GDP-2 -

cc: Mr. Randall DeVault, DOE Mr. Jim Morgan, PORTS Mr. Steven Toelle, USEC ll. sll sllll a elllllln e ll DISTRIBUTION:(Control No.140S) .._.

Docket 70-7002 NRC File Center PUBLIC KO'Brien, Rlll NMSS Dir. Off. r#

CCox NMSS r# FCSS r# WSchwink, FCO2 SPBr#

PHiland Rlll DHartland, Rlli OGC JDavis, FCOB G:%MD9L3.POR *See Prevolus Concurrence CP/ PROOFED /T ECEMBEl4 12,1997 OFC SPB* SPB* SPB* SPB* FCSS* IJMSP/1 _

NAME YFarar q DHoadic y DMartin RPierson ETenEyck C o DATE 12/9/97 12/12/97 12/10/97 12/10/97 12/1 *

  • M'/ / /97 C = COVEk E = COVER & ENCLOSURE N = NO COPY oF?lCIAL RECORD COPY 9901060188 971212 PDR ADOCK 07007002: <

C PDR

Mr. James H. Miller Vice President, Production U. S. Enrichment Corporation 2 Democracy Center 6903 Rockledge Drive Bethesda, MD 20817

SUBJECT:

CERTIFICATE AMENDMENT REQUEST PORTSMOUTH GASEOUS DIFFUSION PLANT COMMITMENT TO IDENTIFY STRUCTURES, SYSTEMS AND COMPONENTS (SSCs) NECESSARY TO MEET NUCLEAR CRITICALITY SAFETY (NCS) DOUBLE CONTINGENCY PRINCIPLE (TAC NO. L32035)

Dear Mr. Miller:

In sccordance 'th your application dat.=G June 16,1997, and pursuant to Part 76 to Title 10 of the Code o(Federal Regulations, Certificate of Compliance GDP-2 is hereby amended by adding to TSR 3.11.1, an additional commitment to identify SSCs and suppor+ systems necessary to meet t\e NCS double contingincy principle. Accordingly, Condition 9 has been revis.ed to include the date of June 16,1937 All other conditions of t is certificate shall remain the same.

Encicsed is a copy of the r vised Certificate of Compliance.

Sincerely, Carl J. Paperiello, Director Office of Nuclear Material Safety and Safeguards Docket 70-7002 Certificate GDP-2 Amendmert 07

Enclosure:

Certificate of Compliance GDP-2 cc: Mr. Randall DeVault, DGE Mr. Jim Morgan, POF.TS Mr. Steven Toelle, USEC DISTRIBullON: (Control No.140S)

Docket 70-7002 NRC Hle Center PUBUC KO'Drien, Rill MSS Dir. Off. r/f CCox NMSS r/f FCSSr/f WSchwink, FCOB S r/f PHiland, Alli DHartland, Rill oGC J0avia. FCOB G MMD9dPOR OFC SPB I 8PB \FC,SS') NMSS '

NAME YFarar oadley Martin erson e Eyck CPaperiello DATE IS. /7/97 lF /7 /97 h//h/97 h/Y/97 l.7.1 I/97 / /97 / /97 C = COVER E = COVER & ENCLOSURE OFFICIAL RECORD COPY N = NO COPY

! /

/ d