ML20198A938
| ML20198A938 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley, Millstone, Wolf Creek, Sequoyah, Byron, Braidwood, Summer, Prairie Island, Callaway, Vogtle, Farley, Cook, Zion, 05000000, Trojan |
| Issue date: | 10/28/1985 |
| From: | Cermak J STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM, WESTINGHOUSE OPERATING PLANTS OWNERS GROUP |
| To: | Wigginton D Office of Nuclear Reactor Regulation |
| References | |
| OG-162, TAC-48146, WOG-HELB-SBOC, WOG-HELB-SBOC-0, WOG-HELB-SPOC, NUDOCS 8511060258 | |
| Download: ML20198A938 (1) | |
Text
f SNUPPS se asneia.e mes.n unit OG-162 s cm. chewy n**d WOG-HELB/SB00-019
$ 7g.",f,'*"d
October 28, 1985 Mr. D. L. Wigginton, Program Manager Farley Units 1 & 2 Office of Nuclear Reactor Regulation Cook Units 1 & 2 U.S. Nuclear Regulatory Commission
{lonUnits1&2 Phillips Building nyron Units 1 & 2 Washington, DC 20555 Braidwood Units 1 & 2 i
Beaver Valley Units 1 & 2
Subject:
Westinghouse owners Group V gtle Units 1 & 2 Wolf Creek High Energy Line Break /Superheated Blowdowns s o" Outside Containment Subgroup Program Completion e
Unib 1 & 2
Reference:
- 1) OG-145, Dated Feb. 25, 1985 Trq.an Summer
- 2) OG-147, Dated March 21, 1985
- 3) OG-157, Dated July 30, 1985 Sequoyah Units 1 & 2 Callaway
Dear Mr. Wigginton:
The purpose of this letter is to inform you and your staff of the completion of the Westinghouse Owners Group (WOG) program to address superheated blowdowns outside containment. A final report detailing the results of the program was issued to Subgroup members on October 21, 1985.
As discussed in the reference letters, the purpose of the program is to supply steamline break mass and energy release information which will be used by WOG HELB/SBOC members in establishing plant specific EQ temperature envelopes. As each utility is responsible for plant specific evaluations, a final schedule for completion of these evaluations cannot be determined by the WOG Subgroup.
As stated in the reference letters, however, it is expected that a minimum of 90 days is required to establish temperature envelopes for each plant and 60 days to prepare a list of equipment potentially affected by the revised temperature envelopes.
If there are any questions on this, please do not hesitate to call.
Sincerely, 0511060250 051020 PDR ADOCK 05000282 J. O. Cermak, Chairman P