ML20198A541

From kanterella
Jump to navigation Jump to search
Amend 76 to License DPR-61,reflecting Tech Spec Changes Authorizing Cycle 14 Operation W/O Removing Tube 37-73 in Steam Generator 2 from Svc by Plugging
ML20198A541
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 05/14/1986
From: Charemagne Grimes
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20198A523 List:
References
NUDOCS 8605210125
Download: ML20198A541 (4)


Text

r

,gacg y UNITED STATES

.g y g NUCLEAR REGULATORY COMMISSION -

%  :[ WASHINGTON, D. C. 20555

%, ,o CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT DOCKET N0. 50-213 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 76 License No. DPR-61

1. The Nuclear Regulatory Commission (the Comission) has found that:

A. The application for amendment by Connecticut Yankee Atomic Power Company (the licensee), dated May 9, 1986, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I;

8. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Comission's regulations; D. The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

~

B605210125 860514 PDR ADOCK 05000213 p PDR

r

2. Accordingly, the license is amended by changes to the technical specifications as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. DPR-61 is hereby amended to read as follows:

(2) Technical Specifications The technical specifications contained in Appendix A, as revised through Amendment No.76 , are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the technical specifications.

3. This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

+9 W .

Christopher I. Grimes, Director Integrated Safety Assessment Project Directorate Division of PWR Licensing - B

Attachment:

Changes to the Technical Specifications Date of Issuance: May 14, 1986 m

ATTACHMENT TO LICENSE AMENDMENT N0. 76 FACILITY OPERATING LICENSE N0. DPR-61 DOCKET N0. 50-213 Replace the following page of the Appendix A technical specifications with the enclosed page as indicated. The revised page is identified by the captioned amendment number and contain a vertical line indicating the area of change.

REMOVE INSERT 4-21c 4-21c m

s. r.

~,

a) ' A seismic occurrence greater than the operating basis I earthquake. )

b) A loss of coolant accident which causes significant deviations in ,

temperature or pressure which affect the integrity of the steam generator tubes, or requires actuation of the engineered

safeguards.

j c) A major steam lin- or rnajor feedwater line break.

D. Acceptance Criteria:

1. As used in this Specification:

^

a) -Imperfection means an exception to the dimensions, finish or

.- contour of a tube from that required by fabrication drawings or

. specifications. Eddy-current testing indications below 20% of

. the nominal tube wall thickness, if detectable, may be considered as imperfections.

b) Degradation means a service-induced cracking, wastage, wear 4

. or general corrosion occurring on either inside or outside of a tube, c) Degraded Tube means a tube containing imperfections R 20%

of the nominal wall thickness caused by degradation.

d)  % Degradation means the percentage of the tube wall thickness af fected or removed by degradation.

e) Defect means an imperfection of such severity that it exceeds the plugging limit. A tube containing a defect is defective, f) Plugging Limit means the imperfection depth at or beyond which the tube shall be removed from s:rvice because, it may become unserviceable prior to the next inspection and is equal to 50% of the nominal tube wall thickness.

g) Unserviceable describes the condition of a tube if it leaks or contains a defect large enough to af fect its structural integrity in the event of a Operating Basis Earthquake, a loss-ci coolant accident, or a steam line or feedwater line break as specified in Specification 4.10.1.C.3.

h) Tube inspection means an inspection of the steam generator tube from the point of entry (hot leg side) completely around the U-bend to the top support of the cold leg.

! 2. The Steam Generator may be returned to service after completing i the corresponding actions (plug a!! tubes exceeding the plugging limit l

and all tubes containing through wall cracks) required by Table 4.10.1-2, with the exception of plugging the tube in Row 37, Column 73 in Steam Generator 2 for Cycle 14.

! E. Following each inservice inspection of steam generator tubes, the number of tubes plugged in each steam generator shall be reported in accordance l with Specification 6.9.

l 4-21c Amendment No. 8 J , 76

- - - . - - - .- ._- . . - _ - -