Forwards Braidwood Nuclear Power Station 10CFR50.59 Summary Rept,960619 Through 980618, Vols I & Ii,Consisting of Descriptions & SE Summaries for Changes to Procedural UFSAR Changes,Tests & Experiments & Fire Protection Rept
ML20197K219
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/15/1998
From: Schwartz G
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20197K223 List:
References
NUDOCS 9812160122
Download: ML20197K219 (1)


Text

-

/'-

Commonwealth Exlison Company p

Ilraidwood Generating Station Houte 01, llox 84.

Ilraceville, IL 60407-9619 Tel 815-158-2801 December 15,1998 1

- U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Braidwood Station Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457

Subject:

10 CFR 50.59 Summary Report i

Reference:

NRC letter, " Commonwealth Edison Proposal for Updated Final Safety Analysis Report Revision Submittal Frequency", dated June 15,1993.

Pursuant to the requirements of 10 CFR 50.59 (b) (2), Braidwood Station is submitting the 10 CFR 50.59 Summary Report. This report covers the period from June 19,1996, through June 18,1998, and consists of descriptions ar$ sefety evaluation summaries for changes to the Facility, procedural Updated Final Safety Analysis Report (UFSAR) changes, Tests and j

Experiments, and the Fire Protection Report.

j The report is being submitted to coincide with the UFSAR and Fire Protection Report updates j

consistent with the provisions of 10 CFR 50.59 (b) (2). Updates to the UFSAR and Fire Protection Report will be submitted in a separate transmittal. The UFSAR and Fire Protection Report updates are currently submitted every 24 months in accordance with the provisions of 10 CFR 50.71 (e) (4). In the referenced letter, the NRC concurred with Commonwealth Edison Cornpany's proposal to provide UFSAR updates to the NRC no later than 24 months from the submittal date of the previous revision.

Please direct any questions regarding this submittal to T. W. Simpkin, Regulatory Assurance Supervisor, (815) 458-2801, extension 2980.

Respectfully, AXAs G. K. Schwartz Braidwood Station ager

' GKs98037. doc

Attachment:

10 CFR 50.59 Summary Report cc:

Regional Administrator-USNRC, Region 111 NRC Senior Resident inspector - Braidwood Station 9812160122 991215 a

PDR ADOCK 05000456 R

PM J

. A Unicum Company.