Text
.-
.~.- -..- -
\\
- /'p aeog'e_
}
-ps T.
UNITED STATES ~
f NUCLEAR REGULATORY COMMISSION-i WASHINGTON, D.C. 30666-0001
-(...* -L December 18, 1997 l
Mr. C. K. McCoy -
Vice President Southem Nuclear _ Operating Company, Inc.
- Post Omco Box 1295 Birmingham, Alabama 35201-1295 7
SUBJECT:
- COMPLETION OF LICENSING ACTION FOR GENERIC LETTER 96-01,
? TESTING OF SAFETY-RELATED LOGIC CIRCUlTS," DATED JANUARY 10,
.1996; VOGTLE ELECTRIC GENERATING PLANT, UNIT 1 (TAC NO. M94747) d
Dear Mr. McCoy:
On January 10,1996, tim U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 96-01, " Testing of Safety-Related Logic Circuits," to all holders of operating licenses or construction parmits. The NRC issued GL 96-01 for three principal reasons:
-1.
Notify addressees about problems with testing of safety-related logic circuits; 2.
- Request that all addressees implement the actions described within the GL; and 3.
Require that all addressees submit to the NRC a written response regarding implementation of the requested actions, g
i in GL 96-01, the NRC staff specifically requested that licensees take the following actions:
l 1.
Compare electrical schematics and logic diagrams for the reactor protection system, l
emergency diesel generator load shedding and sequencing, and actuation logic for the engineered safety feature systems against plant surveillance test procedures to ensure that all portions of the logic circuitry, including the parallel logic, interlocks, bypasses, and inhibit circuits,' are adequately covered in the surveillance procedures to fulfill the technical specification requirements. This review should also include relay contacts, control switches, and other relevant electrical components within these systems, utilized in the logic circuits performing a safety function; and 2.
Modify the surveillance procedures as necessary for complete testing to comply with the technical apecifications. Additionally, the licerisee may request an amendment to the
- technical specifications if relief from certain testing requirements can be justified.
(JO i-9901050248 971218 PDR ADOCK 05000424 P
Mr. C. K. McCoy Furtherrnore, the NRC staff required that addressees prepare and submit the following:
1.
A written response indicating whether or not the licensee would implement the actions requested above or propose an alternative action; 2.
A schedule for completing the requested actions or proposed alternative; and 3.
A response confirming completion of the requested actions.
In response to GL 96-01, you provided letters dated April 12,1996, and November 20,1997, for Vogtle Electric Generating Plant, Units 1 and 2. These submittals provided both the information requested and the responses required by GL 96-01 for Vogtle Unit 1; therefore, TAC No. M94747 is closed. We understand that the GL 96-01 activities for Vogtle Unit 2 will be completed during the upcoming outage. Following receipt of confirmation on completion of these activities, the GL 96-01 review (TAC No. M94748) for Vogtle Unit 2 will be closed.
If you have any questions regarding this matter, please contact David H. Jaffe at (301)415-1439.
Sincerely,
\\
0 Projec(t Directorate 112, Jiyfe knjor Project Manage vi Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket No. 50-424 cc: See next page
- +.
i Vogtle Electric Generating Plant cc:
Mr. J. A. Bailey Harold Rehels, Director Manager, Licensing.
205 Butler Street, SE. Suite 1252 Department of Natural Resources Southem Nuclear Operating Company, Inc.
Atlanta, Georgia 30334 P. O. Box 1295 Birmingham, Alabama 35201-1295 Attomey General Law Department Mr. J. B. Beasley 132 Judicial Building General Manager, Vogtie Electric Atlanta, Georgia 30334 Generating Plant Southem Nuclear Operating Mr. R. D. Barker Company, Inc.
Program Manager j
P.- O. Box 1600 Fossil & Nuclear Operations
- Waynesboro, Georgia-30830 Oglethorpe Power Corporation i'
2100 East Exchange Place Regional Administrator, Region ll P. O. Box 1349 U. S. Nuclear Regulatorv Tucker, Georgia 30085-1349 Commission Atlanta Federal Center Charles A. Patrizia, Esquire -
61 Forsyth Street, SW., Suite 23T85 Paul, Hastings, Janofsky & Walker
' Atlanta, Georgia 30303 10th Floor 1299 Pennsylvania Avenue Office of Planning and Budget Washington, DC 20004-9500 Room 6158 270 Washington Street, SW.
Arthur H. Domby, Esquire Atlanta, Georgia 30334 Troutman Sanders NationsBank Plaza Mr. J. D. Woodard 600 Peachtree Street, NE.
2 Executive Vice President Suite 5200 Southem Nuclear Operating Atlanta, Geor0 a 30308-2216 l
Company, Inc.
P. O. Box 1295 Resident inspector
. Birmingham, Alabama 35201-1295 Vogtle 8805 River Road
- Steven M. Jackson-Waynesboro, Georgia 30830
- Senior Engineer-Power Supply
- Municipal Electric Authority Office of the County Commissioner _-
of Georgia--
Burke County Commission 1470 Riveredge Parkway, NW.-
Waynosboro, Georgia 30830
- Atlanta, Georgia 303284684 J
,4,.
.;yw
+
m 1J Mr. C. ; K[ McCoy1
-2=
December
- 18, 1997 Furthermorelthe NRC staff required that addressees prepare and submit the following:
1.
A written response indicating whether or not the licensee would implement the actions 1 requested above or propose an attemative action; 2.
A schedule for completing the requested actions or proposed attemative; and.
3.
A response confirming completion of the requested actions, In response to GL 96-01, you provided letters dated April 12,1996, and November 20,1997, for Vogtle Electric Generating Plant, Units 1 and 2, These submittals provkled both the information requested and the responses required by GL 96-01 for Vogtle Unit 1; therefore, i
TAC No, M94747 is closed. We understand that the GL 06-01 activities for Vogtle Unit 2 will be completed during the upcoming outage. Following receipt of confirmation on completion of these activities, the GL 96-01 review (TAC No. ! M94748) for Vogtle Unit 2 will be closed.
If you have any questions regarding this matter, please contact David H. Jaffe at
.(301) 415-1439.
Sincerely, ORIGINAL SIGNED BY:
David H. Jaffe, Senior Project Manager Project Directorate 11-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket No,- 50-424
. cc:: See next paga DISTRIBUTION:
Set!ItttfIle H. Garg, HlCB
- PUBLIC ACRS PDil-2 Rdg.
DJeffe
. BBoger LBerry _.
~
"JZwolinski JJohnson, Rll HBerkow -
PSkinner, Ril OGC DOCUMENT NAME: G:\\VOGTLE\\GL9601.WP To receive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copp OFFICE PM:PpH 1 LA:PDll 20r HICB:NRR D:PDifh NAME' DJalffFcM LBerry XM HGarg NW HBerk& /
DATE' 1(79Y ]
114M 4~C '
II/I4 9 7
/)/ H/
g
_. OFFICIAL RECORD COPY
'^