Discusses 971215 Telcon Re Arrangements Made for Administration of Licensing Exams at Beaver Valley During Week of 980420.To Meet Schedule,Exam Outline Requested by 980220
ML20197J992
Person / Time
Site: Beaver Valley
Issue date: 12/22/1997
From: Meyer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Cross J
DUQUESNE LIGHT CO.
References
NUDOCS 9801050170
Download: ML20197J992 (3)


Text

e D3cember 22, 1997 I

i Mr. J. E. Cross President Generation Group Duquesne Light Company Postt Office Box 4 Shippingport, Pennsylvania 15077

SUBJECT:

SENIOR REACTOR INITIAL EXAMINATIONG BEAVER VALLEY

Dear Mr. Cross:

In a conversation on December 15,1997, between Mr. T. Kenny and Mr. T. Burns, arrangements were made for the administration of licens!ng examinations at the Beaver Valley facility during the week of April 20,1998.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guioelines la Interim Revision 8,if NUREG 1021, " Operator Licensing '

Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the exarninations are administered.

To meet the above schedule, it will be necussary for your staff to furnish the examination outlines by February 20,1998. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES 201 will be due by March 20,1998. Any delay in receiving the required examination, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled, in order to conduct the requested written examination and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES 402, and to make the simulation facility availabl: on the dates noted above. In accordance with ES.302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E or NUREG 1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications [ Office of Management and Budget (OMB) approval number 3150-00901, medical certifications (OMB approval number L

3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination datc. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed

}

i.

applications certifying that a18 training has been completed should be submitted at least

)'

14 days before the first examination date.

O f

9901050170 971222 PDR ADOCK 05000334 V

PDR

~

4 Mr. J. E. Cross 2

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections wore approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30, 2000.

l The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T 6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555 0001, or by r

Internet electronic mail at BJS1@NRC. GOV; and to the Desk Officer, Office of Information and Regulatory Aff airs, NEOB 10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. T. Burns has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's axamination procedures and guidelines, please contact T. Kenny at (610) 337 5287 or me at (610) 337 5211.

Sincerely, Glenn W. Meyer, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket No.

50-334 cc w/ encl:

Sushil C. Jain, Vice President, Nuclear Services R LeGrand, Division Vice President, Nuclear Opcations Group & Plant Manager W. Kline, Manager, Nuclear Engineering Department B. Tuite, General Manager, Nuclear Operation' lnit M. Pergar, Acting Manager, Quality Services

  • Wt J. Arias, Director, Safety & Licensing Depar*

.,nt J. MacDonald, Manager, System and Performance Engineering T. Burns, Training M. Clancy, Mas or Commonwealth of Pennsylvania State of Ohio l

State of West Virginia

+ -,. -

--n

i Mr. J. E. Cross 3

Distribution w/encI:

Region l Docket Room (with concurrences)

PUBLIC Nuclear Safety Information Center (NSIC)

NRC Resident inspector P. Eselgroth, DRP D. Haverkamp, DRP N. Perry, DRP

{

A. Linde, DRP T. Kenny,DRS J. Stolz, PDI 2, NRR D. Brinkman, PM, PDI 2, NRR W. Dean, OEDO R. Correia, NRR F. Talbot, NRR DOCDESK Inspection Program Branch, NRR (IPAS).

01 Facility File t

I DOCUMENT NAME:. A: 120LTR.BV TO receive a copy or this docuawat indkate le the bes: "C' = Copy without attachment / enclosure

  • E* = Copy with anachmenvenclosure
  • N* = No copy OFFICE Rl/DRS Rl/DRS Rl/

Rll l

Rll NAME TKenny 1%

GMeyer 1

DATE 12/22/97 '

12/@7 - X" 12/ /97 12/ /97 12/ /97 OFFICIAL RECORD COPY e

-