ML20197J782

From kanterella
Jump to navigation Jump to search
Informs That Addl Time Is Required to Complete Development of Implementing Procedures & Begin Implementation of Verification Program,Per GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs
ML20197J782
Person / Time
Site: Pilgrim
Issue date: 12/23/1997
From: Oheim H
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BECO-2.97.133, GL-96-05, GL-96-5, NUDOCS 9801050086
Download: ML20197J782 (2)


Text

f 9.

Pdgrim Nuclear Power Staten Hocky Hdt Road Plymouth Massachusetts 02360 A

Henry V. Oholm o,neral Manager. Technical Section December 23,1997:

BECo Ltr. 2.97.133 U.S; Nuclear Regulatory Commission ATTN: Document Control Desk L Washingtun,. D.C. 20555-0001 Docket No. 50-293 pcense No. DPR-35 SUPPLEMENTARY INFORMATION RELATED TO GENERIC LETTER 96-05

References:

(1) Boston Edison Company Letter No. 2.97.064, " Generic Letter 96-05: 180-Day Response," dated June 18,1997.

(2) Generic Letter 96-05, " Periodic Verification Of Design Bas!s Capability Of Safety-Related Motor Operated Valves.

By Reference 1, Boston Edison Company provided a summary description of the periodic verification program for safety-related motor operated valves at Pilgrim Nuclear Power Station in response to Generic Letter 96-05 (Reference 2). In that letter, we repeated our commitment to establish the verification program by September 30,1997. We wish to inform you that the periodic verification program was established by that date, in Reference 1, we also stated that we planned to. develop the implementing procedures and expected to begin implementation of the verification program by December 31,1997. By this letter, we wish to inform you that additional time is required to complete these activities, in recent weeks our staff has been required to support an unplanned plant outage as well as the NRC inspection for /..

Generic Letter 89-10 close-out activities. Accordingly, we now expect to develop the implementing / p procedures and begin implementation of the periodic verification program by February 28,1998.

If you have any quest;ons regarding the information contained in this lett,er, please contact Walter Lobo at (508)830-7940, H.V.- Oheim wgenosA doc y

W3 9801050086 971223 ?

PDR ADOCK 05000293' P

PDR; k'< mc7

~

^

I cc:

Mr. Alan B[ Wang, Project Min:ger.:

Project Directorate 13:

Office Of Nuclear Reactor Regulation

.. Mall Stop: OWF 1482' 1 White Flint North :

11555 Rockville Pike '

Rockville, MD 20852 U.S. Nuclear Regulatory Commisslor,

= Region 1-475 Allendale Road King of Prussia, PA 19406 Senior Resident inspector Pil,im Nuclear Power Station 6

i E

k 4

i -

1' u

E n

-..