Category:CORRESPONDENCE-LETTERS
MONTHYEARML20062J8881993-11-0909 November 1993 Forwards Revised Vol II of Final Project Rept for Decontamination & Decommissioning of Pu Facility & Multiple Failure Bldg at Nuclear Lake,Pawling,Ny ML20062J7791993-11-0505 November 1993 Completes Review of Listed Repts on Decontamination & Decommissioning of Multiple Failure,Plutonium Facility & Waste Disposal Bldgs.Based on Rept Data,Residual Contamination in Plutonium Facility Below NRC Guidelines ML20062J6321993-11-0303 November 1993 Forwards Vols I & II of Final Project Rept for Decontamination & Decommissioning of Pu Facility & Multiple Failure Bldg Nuclear Lake Pawling,Ny ML20062J7551993-11-0303 November 1993 Completes Review of Listed Repts Re Decontamination & Decommissioning of Multiple Failure,Waste Disposal & Plutonium Facility Bldgs,Nuclear Lake Site,Pawling, New York ML20059J7751993-10-27027 October 1993 Forwards Addemdum to Final Project Rept for Decontamination & Decommissioning of Pu Facility & Multiple Failure Bldg Nuclear Lake Pawling,Ny ML20058N8941993-10-15015 October 1993 Responds to Chevron Requesting Clarification of NRC Approving Demolition of Outdoor Area Structures at Pawling Site ML20058P1341993-10-12012 October 1993 Requests Clarification of Last Sentence of First Paragraph of NRC Approving Demolition of Listed Outdoor Structures at Natl Park Svc Property at Pawling,Ny Site ML20058N9101993-10-0808 October 1993 Approves Chevron 931007 Request to Demolish Outdoor Area Structures,Including Sodium Tent Pad,Emergency Generator Bldg & Shield Blocks.Approval Based on Oak Ridge 930920-28 Gamma Scan Surveys ML20058N9751993-10-0606 October 1993 Approves Demolition of Engineering Bldg,Critical Facility, Shield-Mock-up Bldg,Lodge & Remote Assembly Bldg,Based on Results of Surveys Performed by Oak Ridge Institute for Science & Edcucation,In Response to 930930 Telcon Request ML20058N5631993-10-0505 October 1993 Forwards Summary of Confirmatory & Radiological Surveys of Nuclear Lake Site Findings ML20057E0361993-09-17017 September 1993 Forwards Revised Confirmatory & Radiological Survey Plan for Nuclear Lake Site,Pawling,Ny ML20059J5271993-09-17017 September 1993 Forwards Revised Proposed Confirmatory & Radiological Survey Plan for Nuclear Lake Site Pawling,Ny, Incorporating Comments Provided to Environ Survey & Site Assessment Program in 930917 Telcon W/Nrc ML20057C7081993-09-17017 September 1993 Forwards Response to NRC Review & Comments Re Final Project Rept for Decontamination & Decommissioning on Pu Facility & Multiple Failure Bldg at Nuclear Lake Site,Pawling Ny, ML20059J5111993-09-16016 September 1993 Forwards Proposed Confirmatory & Radiological Survey Plan for Nuclear Lake Site Pawling,Ny, Incorporating Comments Provided to Environ Survey & Site Assessment Program in NRC 930916 Facsimile ML20057B5621993-09-13013 September 1993 Submits Comments on Final Project Rept for Decontamination & Decommissioning of Plutonium Facility & Multiple Failure Bldg,Nuclear Lake,Pawling,Ny, Dtd Aug 1993,prepared & Submitted on 930831 by Nes,Inc/Ies ML20059K1671993-09-13013 September 1993 Forwards Fax Received from Natl Parks Svc Dtd 930831.FAX Indicates Possibility That Residual Surface Contamination Could Be Still Present in Waste Disposal Bldg.Change Order to Chevron,Usa Contract C-092385 Also Encl ML20059J7461993-08-31031 August 1993 Forwards Final Project Rept for Decontamination & Decommissioning of Pu Facility & Multiple Failure Bldg Nuclear Lake,Pawling,Ny, for Review ML20058N1171993-06-0808 June 1993 Forwards Figures for Radiological Survey of Dam Improvement Area,Nuclear Lake Site,Pawling,Ny ML20138D2371993-02-0303 February 1993 Responds to Re Alleged Radioactive Contamination at Nuclear Lake Site in Pawling,Ny & Contract Between RP Densen Contractors,Inc & Dept of Agriculture.Orise Contracted to Perform Addl Walkover Surveys ML20127A7261993-01-0808 January 1993 Responds to 921218 Request for Explanation for Approving Work Plan for Soil Remediation of Natl Park Svc Property Located Near Pawling,Ny W/Cleanup Level of 15 Pci/G for Cs-137 ML20126D0291992-12-18018 December 1992 Ack Receipt of to Chevron Co Re Contaminated Areas at Nuclear Lake Site in Pawling,Ny.Requests Explanation for Approving Work Plan W/Cleanup Levels for Cs-137 Double Levels Considered Appropriate Previous Yr ML20128F0461992-12-11011 December 1992 Responds to Requesting Approval to Begin Remediation of Contaminated Soil Areas at Nuclear Lake Site in Pawling,Ny ML20126D0791992-12-0909 December 1992 Comments on Work Plan for Soil Remediation of Natl Park Svc Property Located Near Pawling,Ny for Chevron Usa,Inc ML20125C2831992-12-0202 December 1992 Advises That Work Plan & Health & Safety Plan for Natl Park Svc Property at Pawling,Ny Will Be Provided for Review.Natl Park Svc & Licensee Plan to Enter Into Cooperative Agreement to Remediate Site ML20128B6191992-12-0101 December 1992 Forwards Work Plan for Soil Remediation of Natl Park Svc Property Located Near Pawling,Ny for Chevron Usa,Inc & Health & Safety Plan for Remediation of Natl Park Svc Property Located Near Pawling,Ny for Chevron Usa,Inc ML20127P7001992-10-30030 October 1992 Discusses Progress Being Made Towards Cleanup of Former Gulf Atomics Co Owned Facility at Nuclear Lake Site Near Pawling, Ny ML20234F5731987-07-0101 July 1987 Responds to FOIA Request for Documents Re Plutonium Accountability at Listed Facilities.Forwards App a Documents.Documents Also Available in Pdr.App B Documents Partially Withheld (Ref FOIA Exemptions 3 & 4) ML20235Y5421987-07-0101 July 1987 Documents 870610 Telcon Responding to 870511 Questions Re Potential for Radioactively Contaminated Matls to Be Present in Nuclear Lake Near Pawling,Ny & Possibility of Any Radioactivity Infiltrating Water Table in Surrounding Area ML20235Y5581987-05-11011 May 1987 Expresses Concern Re Potential for Radioactively Contaminated Matls in Nuclear Lake,Located Near Pawling,Ny & Possibility of Any Radioactivity Infiltrating Water Table in Surrounding Area.Requests Info on Questions Raised ML20211E0771986-06-11011 June 1986 Forwards Insp Rept 70-0903/85-02 on 851012,confirming 850930 Notification That Radiation Levels Up to 5 M/H Discovered in Waste Storage Bldg on Former Gulf-United Nuclear Corp Site in Pawling,Ny.Areas Have Been Decontaminated ML20234F4311986-06-0202 June 1986 FOIA Request for Documents Re Listed Facilities,Including Risk Diversion Analyses or Repts Prepared from 741101-761231 That Discuss Risk That Plutonium Could Be Diverted from Facilities ML20197J3971986-05-0202 May 1986 Responds to 860320 Request for Info Concerning Hot Spot Found in Waste Disposal Bldg at Former Gulf-United Nuclear Corp Site.Nrc Site Insp Conducted on 851015 & Addl Decontamination Performed.Safety Not Threatened ML20197J4461986-03-20020 March 1986 Requests Info Concerning Removal of Fixed Contamination in Former Waste Disposal Bldg at Nuclear Lake Site.Area to Be Opened in Summer as Part of Appalachian Trail ML20197J4411986-03-11011 March 1986 Discusses Addl Sampling at Former Gulf-United Nuclear Corp Site.Cleanup Efforts of Small Area of Cs-137 Contamination in Waste Disposal Bldg Continuing.Cleanup to Background Levels Not Complete Due to Lack of Time & Info ML20211E0861985-09-30030 September 1985 Notifies of 850830 Discovery of Radiation Levels Up to 5 M/H in Waste Storage Bldg of Former Gulf-United Nuclear Corp Site in Pawling,Ny,Per NRC Insp 70-0903/85-01 on 850225- 26 & Subsequent Release of Premises for Unrestricted Use ML20210A8191973-11-26026 November 1973 Forwards New Amends to 10CFR50,70 & 73 Published in 731106 Fr Re Security,Matl Control & Accounting.Encls Re Preparation of Required Protection Plans,Matl Control & Accounting & Facility Protection Encl.W/O Encls 1993-09-17
[Table view] Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA
MONTHYEARML20197J3971986-05-0202 May 1986 Responds to 860320 Request for Info Concerning Hot Spot Found in Waste Disposal Bldg at Former Gulf-United Nuclear Corp Site.Nrc Site Insp Conducted on 851015 & Addl Decontamination Performed.Safety Not Threatened 1986-05-02
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20062J7791993-11-0505 November 1993 Completes Review of Listed Repts on Decontamination & Decommissioning of Multiple Failure,Plutonium Facility & Waste Disposal Bldgs.Based on Rept Data,Residual Contamination in Plutonium Facility Below NRC Guidelines ML20062J7551993-11-0303 November 1993 Completes Review of Listed Repts Re Decontamination & Decommissioning of Multiple Failure,Waste Disposal & Plutonium Facility Bldgs,Nuclear Lake Site,Pawling, New York ML20058N8941993-10-15015 October 1993 Responds to Chevron Requesting Clarification of NRC Approving Demolition of Outdoor Area Structures at Pawling Site ML20058N9101993-10-0808 October 1993 Approves Chevron 931007 Request to Demolish Outdoor Area Structures,Including Sodium Tent Pad,Emergency Generator Bldg & Shield Blocks.Approval Based on Oak Ridge 930920-28 Gamma Scan Surveys ML20058N9751993-10-0606 October 1993 Approves Demolition of Engineering Bldg,Critical Facility, Shield-Mock-up Bldg,Lodge & Remote Assembly Bldg,Based on Results of Surveys Performed by Oak Ridge Institute for Science & Edcucation,In Response to 930930 Telcon Request ML20057B5621993-09-13013 September 1993 Submits Comments on Final Project Rept for Decontamination & Decommissioning of Plutonium Facility & Multiple Failure Bldg,Nuclear Lake,Pawling,Ny, Dtd Aug 1993,prepared & Submitted on 930831 by Nes,Inc/Ies ML20138D2371993-02-0303 February 1993 Responds to Re Alleged Radioactive Contamination at Nuclear Lake Site in Pawling,Ny & Contract Between RP Densen Contractors,Inc & Dept of Agriculture.Orise Contracted to Perform Addl Walkover Surveys ML20127A7261993-01-0808 January 1993 Responds to 921218 Request for Explanation for Approving Work Plan for Soil Remediation of Natl Park Svc Property Located Near Pawling,Ny W/Cleanup Level of 15 Pci/G for Cs-137 ML20128F0461992-12-11011 December 1992 Responds to Requesting Approval to Begin Remediation of Contaminated Soil Areas at Nuclear Lake Site in Pawling,Ny ML20127P7001992-10-30030 October 1992 Discusses Progress Being Made Towards Cleanup of Former Gulf Atomics Co Owned Facility at Nuclear Lake Site Near Pawling, Ny ML20235Y5421987-07-0101 July 1987 Documents 870610 Telcon Responding to 870511 Questions Re Potential for Radioactively Contaminated Matls to Be Present in Nuclear Lake Near Pawling,Ny & Possibility of Any Radioactivity Infiltrating Water Table in Surrounding Area ML20234F5731987-07-0101 July 1987 Responds to FOIA Request for Documents Re Plutonium Accountability at Listed Facilities.Forwards App a Documents.Documents Also Available in Pdr.App B Documents Partially Withheld (Ref FOIA Exemptions 3 & 4) ML20211E0771986-06-11011 June 1986 Forwards Insp Rept 70-0903/85-02 on 851012,confirming 850930 Notification That Radiation Levels Up to 5 M/H Discovered in Waste Storage Bldg on Former Gulf-United Nuclear Corp Site in Pawling,Ny.Areas Have Been Decontaminated ML20197J3971986-05-0202 May 1986 Responds to 860320 Request for Info Concerning Hot Spot Found in Waste Disposal Bldg at Former Gulf-United Nuclear Corp Site.Nrc Site Insp Conducted on 851015 & Addl Decontamination Performed.Safety Not Threatened ML20210A8191973-11-26026 November 1973 Forwards New Amends to 10CFR50,70 & 73 Published in 731106 Fr Re Security,Matl Control & Accounting.Encls Re Preparation of Required Protection Plans,Matl Control & Accounting & Facility Protection Encl.W/O Encls 1993-09-13
[Table view] |
Text
o MAY 0 21986 Mr. Robert Young Member, Harlem Valley Alliance P. O. Box 920 Wingdale, New York 12594
Dear Mr. Young:
I am pleased to respond to your letter of March 20, 1986 to Tom Murley, in which you requested information regarding the " hot spot" found in the Waste Disposal Building at the former Gulf-United Nuclear Corporation site (currently known as the Nuclear Lake Site), in Pawling, New York.
An NRC inspection was conducted at the site on October 15, 1985 as a result of a letter received from the Conservation Advisory Board-Town of Pawling.
Radiation surveys were made during that inspection and the presence of ra-diation levels up to five mrem per hour was confirmed. For your information, I am enclosing a copy of the bRC inspection report that documents the results of those radiation surveys. _
Subsequent to the inspection, an NRC contractor, Oak Ridge Associated Univer-sities (0RAU), was directed to perfonn additional decontamination of the Waste Storage Building.
On February 28, 1986, ORAU personnel performed cleanup operations on the hot spot that prompted your inquiry and the other areas identified by our inspector on October 15, 1985. Following their decontamination efforts, the ORAU personnel conducted a radiation survey of the entire building, looking for areas reading in excess of natural background levels (0.01 - 0.016 mrem /hr or 10 to 16 uRem/hr). Two such areas were identified, both involving fixed contamination. One of these areas read 0.12 mrem /hr (120 uRem/hr) on contact. As noted in the enclosed ORAU report, that area was not accessible for decontamination because it was located under a building support structure.
The other area, on the western edge of the hole in the concrete floor described in the enclosed reports, read 0.045 mrem /hr (45 uRem/hr) on contact.
ORAU personnel did not reduce the remaining areas to background levels because of the inaccessibility of one of the areas and because of a breakdown of their equipnent while cleaning the other area. Because the equipment could not be repaired at the site, and because the residual radiation in that area was insignificant, it was decided that further cleanup work was not warranted.
860520002686050h03 PDR ADOCK 07000PDR C
! [d,
Mr. Robert Young MAY 0 21986 While these remaining spots do exhibit slightly elevated radiation levels, they are well within the NRC criteria (maximum of 1,000 uRem/hr) for release t
for unrestricted use by the public. Accordingly, it is our view that any radioactivity that remains in the Waste Storage Building will not pose a safety hazard to individuals using the fomer plant site as a rest stop while traveling the Appalachian Trail. For your information, it is our understanding that the National Park Service has contracted ORAU to perform additional radiation surveys at the Pawling site in the near future.
Thank you for your interest in this matter.
Sincerely, l m t pn sincd 3I:
y: , 9. ' c'; ^'
~
Thomas T. Martin, Director Division of Radiation Safety and Safeguards
Enclosure:
- 1. NRC Region I Inspection Report No. 70-903/85-02
- 2. Letter, Oak Ri.dge Associated Universities to J. Roth, NRC Region I, dated March 11, 1986 cc(w/encis):
National Park Service, Appalachian Trail Project Office Public Document Room (PDR)
Nuclear Safety Information Center (NSIC)
State of New York bcc (w/ encl):
Region I Docket Room (Docket No.70-903)
W. T. Crow, NMSS J. Kinneman, RI J. Berger, ORAU J. Roth, RI P. Lohaus, RI
/
F : S RI: RSS . RSS RS I d h Ke m g aoyner artin G rrez j /p86
( 5/ 2 /86 5/ 9/86 5/ v/86 5/ 6 0FFICIAL RECORD COPY