ML20197J056
| ML20197J056 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 12/24/1997 |
| From: | Lanksbury R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Franz J IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT |
| References | |
| NUDOCS 9801020068 | |
| Download: ML20197J056 (3) | |
Text
y,
-~... - -.- -.. - - - - - - -
3 7 p"8:4
.usetise STATas c!:
g
- 1 1 9^. T NUCt. EAR RE;ULATORY COMMIS$10N i
-d
~
REGION W G
a01 WARREWuf ROAD 3
- usta. KuNois eossa-4ssi,
(* M --
December 24, 1997' a
e
._.=
i
~
)
- Mr. John F. Franz, Jr.
1 Vice President, Nuclear -
lES Utilities, Inc..
200 First Street SE P. O. Box 351 Cedar Rapids, IA 52406-0351 p
t
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR)- DUANE ARNOLD i
Dear Mr. Franz:
1 On October 22,1997, NRC staff completed the semiannual Plant Performance Review (PPR) of the Duane Amold Nuclear Plant.' The staff conducts these reviews for all operating nuclear l
power plants to develop an integrated understanding of safety performance. The results are.
f used by regional management to facilitate planning and allocation of inspection resources. The
' PPR for Duane Amold involved the participation of all Re0 on lil technical divisions as well as i
responsible NRR staff, in evaluating inspection results and safety performance information for
. the period of Mamh through October 1997,- PPRs provide NRC management with a current summary of liceraee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.
p
. No significant performance trends from the previous PPR (March 1997) were noted during this PPR.
- This letter advises you of our planned inspection effort resulting from the Duane Amold PPR
' review. Wc have not scheduled any team inspections or other inspections outside the
- Core" inspection program through June 1998f The enclosure details our inspection plan for approximately the next 6 months. Resident inspections, as well as periodic inspections by other assigned members of the staff, may occur at any time in support of the Core inspection program.
4 l
4 a:
jE
{
p 8
-PDR
. u..
.-.u.
~
J. Franz, Jr We are interested in feedback on this program, including the need for any changes in the inspection plan, and we invite your questions or comments, if changes are necessary, you will be informed, if you have any questions or comments, please contact me at (630) 829 9631.
Sincerely, Roger D. Lanksbury, Chief Reactor Projects Branch 5 Docket No. 50-3G5 License No. DPR-43
Enclosure:
Inspectioe Plan cc w/ encl:
L. Root, President and Chief Operating Officer G. Van Middlesworh, Plant Manager K. E. Peveler, Manager, Regulatory Performance Chairperson, Iowa Utilities Bord Docket File w/enci SRI DAEC w/enct PUBLIC IE-01 w/ encl CAA1 w!enci (E-Mail)
Project Mgr., NRR w/enci Deputy RA w/ encl A. B. Beach w/enci Rlli PRR w/ eccl Rlli Enf. Coordinator w/ encl DRS (2) w/ encl TSS w/ encl DOCDESK (E-MaQ DRP w/enct DOCUMENT NAME: G:\\DUAN\\lNSPPLNS.DUA To receAre a copy of thh darument, indiente In the bov "C" Co py without attachment / enclosure "E" a Copy with attachmaWenclo-ure "N" a No copy
[7FFICE Rill l
Rlli _
l l
0 l
ME DuPorMl/
Larfnfiry p g,TE
- (DA 12/M'97 12/s/97 OFFICIAL RECORD COPY t
1 i
020009
DUANE ARNOLD INSPECTION PLAN INSPECTION TITLEI NUMBER OF PLANNED TYPE OF INSPECTION -
PROGRAM AREA INSPECTORS INSPECTION COMMENTS DATES IP 83750 Occupational Radiological Protection 1-2 4/6 - 10/98 Core inspection IP 87100 Security 1-2 4/13 - 17/98 Core Inspechon IP 73753 inservice inspection 1-2 4/20-24/98 Core inspection IP 84750 Uquid/ Gaseous Radioactive Waste 1-2 6/29-7/3/98 Core inspects IP - Inspection Procedure Ti - Temporary instruction Core Inspection - Minimum NRC Program (mandatory all plants) 1
_ _