Text
.--
. ~ _ - - - _. _,
W$LF CREEK NUCLEAR OPERATING CORPORATION Richard A. Muench Vice President Engineering DEC 8 1998 ET 98-0103 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Mail Station Pl-137 Washington, D. C.
205$5
References:
- 1) Letter ET 98-0009, dated March 20, 1998, from R. A.
- 3) Letter ET 98-0048, dated June 30, 1998, from R. A.
- 4) Letter ET 98-0070, dated August, 28, 1998, from R. A.
- 5) Letter ET 98-0077, dated September 4, 1998, from R. A.
- 6) Letter ET 98-C092, dated November 20, 1998, from R. A.
Subject:
Docket No. 50-482:
Follow-up To December 3, 1998, NRC/ Wolf Creek Nuclear Operating Corporation /AmerenUE Meeting on Spent Fuel Pool Rerack Gentlemen:
Reference 1 provided the original submittal of an amendment request to revise the Wolf Creek Generating Station (WCCS) Technical Specifications to support a modification to increase the spent fuel storage capacity at WCGS.
References 2 through 5 - provided additional information.
Reference 6 provided written responses to items raised during meetings held on October 14 and 15, 1998, between the NRC, Wolf Creek Nuclear Operating Corporation (WCNOC),
and AmerenUE.
l As discussed during the meeting between NRC, WCNOC, and AmerenUE, held on December 3, 1998, this letter documents WCNOC's commitment to incorporate the following as part of the Updated Safety Analysis Report (USAR) update l
following the spent fuel pool (SFP) reracking modification:
A' discussion of the time frame the bulk fuel pool temperature could be in l
excess of 150 degrees Fahrenheit following a full core off-load.
The l'
maximum allowed time frame for this condition will not exceed 9 days.
\\
The maximum allowed bulk fuel pool temperature is 170 degrees Fahrenheit.
Tha maximum allowed total fuel pool heat load is 63,41 x 10' BTU /hr.
- e.
These commitments are also identified in the Attachment.
These items were originally provided to the NRC in response to Question 11 contained in Reference 4.
Q\\
9812140153 901200 PDR ADOCK 05000482 p
PDR e '3
..e I
P.O. Box 411/ Burlington, KS 66839 / Phone: (316) 364-8831 Ari EquM Opporturuty Employer MFMCNET 2
l ET 98-0103 Prga 2 of 2 i
In addition, Reference 6, Attacha. ant III, page 1 of 1, provided ac incorrect markup of WCGS Improved Technical Specification (ITS) page 4.0-2.
The j
Enclosure provides the corrected markup of WCGS ITS page 4.0-2 and supersedes Attachment III, page 1 of 1, of Reference 6.
i If you have any questions concerning this submittal, please contact me at (316) 364-4034, or Mr. Michael J. Angus, at (316) 364-4077 i
Very truly yours,
/
1 Richar A. Muench RAM /rir Attachment Enclosure cc: V.
L. Cooper (KDHE) w/a, w/e W. D. Johnson (NRC) w/a, w/e E.
W.
Merschoff (NRC) w/a, w/e K. M. Thomas (NRC) w/a, w/e Senior Resident Inspector (NRC) w/a, w/e r
L l
i
STATE OF KANSAS
)
)
as COUNTY OF COFFEY
)
Richard A. Muench, of lawful age, being first duly sworn upon oath says that he is Vice President Engineering of Wolf Creek Nuclear Operating Corporation; that he has read the foregoing document and knows the content thereof; that he has executed that same for and on behalf of said Corporation with full s
power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
By
//j[14e Richard A.
uench Vice Preo' dent Engineer ng SUBSCRIBED and sworn to before me this dayofhectmht, 1998.
km Notary P ic O
1% Appl 4 Expiration Date 3
+
. M6 2 I
Attachment to ET 98-0103 Page 1 of 1 4
LIST OF COttfITMENTS The (ollowing table identifies those actions committed to by Wolf Creek Nuclear Operating Corporation (WCNOC) in this document.
Any other statements in this submittal are provided for information purposes and are not
'nsidered to be commitments.
Please direct questions regarding these commitments to Mr.
Michael J.
Angus, Manager Licensing and Corrective Action at Wolf Creek Generating Station, (316) 364-4077.
COttiITMENT Due Date/ Event The following will be incorporated into the Updated USAR update Safety Analysis Report (USAR) update following SFP following SFP rera cking : A discussion of the time frame the bulk reracking, fuel pool temperature could be in excess of 150 degrees Fahrenheit following a full core off-load.
The maximum allowed time frame for this condition will not exceed 9 days.
The following will be incorporated into the USAR USAR update update following SFP reracking: The maximum allowed following SFP bulk fuel pool temperature is 170 degrees Fahrenheit.
reracking.
The following will be incorporated into the USAR USAR update update following SFP reracking: The maximum allowed following SFP total fuel pool heat load is 63.41 x 108 BTU /hr.
reracking.
l l
l t