ML20197H250
| ML20197H250 | |
| Person / Time | |
|---|---|
| Issue date: | 12/08/1998 |
| From: | Essig T NRC (Affiliation Not Assigned) |
| To: | Sepp H WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| Shared Package | |
| ML20197H255 | List: |
| References | |
| TAC-MA1074, NUDOCS 9812140034 | |
| Download: ML20197H250 (2) | |
Text
e December 8, 1998 Mr. Hank Sepp, Manager Regulatory and Licensing Engineering Westinghouse Electric Corporation Mail Stop ECE 4-07A P.O. Box 355 Pittsburgh, PA 15230-0355
SUBJECT:
REVISED COVER LETTER OF THE SAFETY EVALUATION RELATED TO TOPICAL REPORT WCAP-15025-P, " MODIFIED WRB-2 CORRELATION, WRB-2M, FOR PREDICTING CRITICAL HEAT FLUX IN 17x17 ROD BUNDLES WITH MODIFIED LPD MIXING VANE GRIDS" (TAC NO. MA1074)
The NRC staff forwarded to you, on December 1,1998, the safety evaluation report on the subject topical report, submitted by Westinghouse by letter dated February 6,1998. In the second paragraph of the cover letter, we had inadvertently ! eft out the safety evaluation report (SER) date. Enclosed is the correct cover letter of the SER. Please replace the first page of the cover letter with the enclosure provided in this letter.
Should you have any questions or wish further clarification, please call me at (301) 415-1282, or Peter Wen at (301) 415-2832.
Sincerely, Frank Akstulewicz for/
Thomas H. Essig, Acting Chief Generic issues and Environmental Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation
Enclosure:
The Revised Cover Letter cc w/ enc: See next page DISTRIBUTION:
J
_. 3
/ Central File
[FG -$
)
PUBLIC GHolahan TCollins RCaruso SRXB r/f WJensen PWen Mizuno
, PGEB r/f OGC
[ ACRS SC:hd/
(A) B G
ld O ~
~
OFFICE PM:PGEB PWen:sw ih/ Fhhwcz
[
U
'" b NAME TE DATE g / 7 /98
/ [/98 f 4 $(
8 OFFICIAL RECORD COPY 9812140034 981208
'2/
PDR TOPRP EMWEST 6{ %'
C PDR
8 i
4 UNITED STATES NUCLEAR REGULATORY COMMISSION f
WASHINGTON, D.C. 2(NW&0001
\\....+/
December 8, 1998 Mr. Hank Sepp, Manager Regulatory and Licensing Engineering Westinghouse Electric Corporation Mail Stop ECE 4-07A P.O. Box 355 Pittsburgh, PA 15230-0355
SUBJECT:
REVISED COVER LETTER OF THE SAFETY EVALUATION RELATED TO TOPICAL REPORT WCAP-15025-P, " MODIFIED WRB-2 CORRELATION, WRB-2M, FOR PREDICTING CRITICAL HEAT FLUX IN 17x17 ROD BUNDLES WITH MODIFIED LPD MIXING VANE GRIDS"(TAC NO. MA1074)
The NRC staff forwarded to you, on December 1,1998, the safety evaluation report on the subject topical report, submitted by Westinghouse by letter dated February 6,1998. In the second paragraph of the cover letter, we had inadvertently left out the safety evaluation report (SER) date. Enclosed is the correct cover letter of the SER. Please replace the first page of the cover letter with the enclosure provided in this letter.
Should you have any questions or wish further clarification, please call me at (301) 415-1282, or Peter Wen at (301) 415-2832.
Sincerely, A lA homas H.
ssig, Acting Chief Generic issues and Environm ranch Division of Reactor Program nagement Office of Nuclear Reactor Regulation
]
Enclosure:
The Revised Cover Letter cc w/ enc: See next page
.