ML20197G730

From kanterella
Jump to navigation Jump to search
Forwards Rev 24 to UFSAR for Ccnpp,Units 1 & 2.Annual Rev Submitted in Accordance with 10CFR50.71(a).List of Effective Pages Included
ML20197G730
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 12/08/1998
From: Cruse C
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20197G734 List:
References
NUDOCS 9812100148
Download: ML20197G730 (2)


Text

_

. ~

Cuatr.s H. CaOSE Baltimore Gas and Electric Company l

Vice President Calvert Cliffs Nuclear Power Plant Nuclear Energy 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4455 December 8,1998 U. S. Nuclear Regulatory Commission Washington,DC 20555 i

ATfENTION:

Document Control Desk l

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Undated Final Safety Analysis Reoort. Revision 24 Enclosed for your use is one original and ten copies of Revision 24 of our Updated Final Safety Analysis Report (UFSAR). This is the annual revision submitted in accordance with 10 CFR 50.71(e). The List of Effective pages is included. Please replace the appropriate pages of your copies of the UFSAR with the enclosed pages.

i l

q-

no t

I i

~

9812100148 991200t>

PDR ADOCK 05000317 I

l x

em l

g; i

m

.~

Document Control Desk o

December 8,1998 Page 2 Should you have questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours, unk STATE OF MARYLAND

TO WIT:

COUNTY OF CALVERT I, Charles 11. Cruse, being duly sworn, state that I am Vice President, Nuclear Energy Division, Baltimore Gas and Electric Company (BGE), and that I am duly authorized to execute and file this response on behalf of BGE. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other BGE employees and/or consultants. Such information has been reviewed in accordance with company pra 'ce and I believe '

be reliable.

k6*

I

/

Subscribed and sworn before me, a Notary Public in and for the State of Maryland and County of SM

.this 7 day of 3 cs k,1998.

WITNESS my Hand and Notarial Seal:

Notary Public

! sod My Commission Expires:

D/c CilC/MRC/bjd

Attachment:

Updated Final Safety Analysis Report, Revision 24 (Original and 10 Copies) cc:

(Without Attachment)

R. S. Fleishman, Esquire

11. J. Miller, NRC J. E. Silberg, Esquire Resident inspector,NRC S. S. Bajwa, NRC R. I. McLean, DNR A. W. Dromerick, NRC J.11. Walter, PSC 1