ML20197G644
| ML20197G644 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 12/04/1998 |
| From: | Patrick W CENTER FOR NUCLEAR WASTE REGULATORY ANALYSES |
| To: | Linehan J NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML20197G642 | List: |
| References | |
| CON-FIN-D-1035, CON-FIN-J-5164, CON-FIN-J-5186, CON-FIN-J-5206, CON-FIN-J-5210, CON-FIN-J-5226, CON-NRC-02-97-009, CON-NRC-2-97-9, REF-WM-11 HLWR, NUDOCS 9812090169 | |
| Download: ML20197G644 (1) | |
Text
Center for Nuclear Waste j
Regulatory Analyses l
6220 CULEBRA ROAD
- P.O. DRAWER 28510
- SAN ANTONIO, TEXAS, U.S.A. 78228-0510 (210) s22 5160. FAX (210) 522-5155 December 4,1998 Contract No NRC-02-97-009 Account No. 20-1402-158 U.S. Nuclear Regulatory Commission Attn: Mr. John J. Linehan, Director Office of Nuclear Material Safety and Safeguards Program Management Policy Development and Analysis Staff Mail Stop 8-A23 Washington, DC 20555
Subject:
CNWRA Program Manager's Periodic Repon on Activities of the Center for Nuclear Waste Regulatory Analyses for Period 2-FY1999
Dear Mr. Linehan:
The attached " Program Manager's Periodic Report"(PMPR) documents the progress and financial status of the Center for Nuclear Waste Regulatory Analyses (CNWRA) for the period October 24-November 20, 1998. Its contents comply with the requirements of section F.1.5. of the referenced contract. A diskette containing the PMPR in Wordperfect 8 format is also enclosed.
Cost variance analyses are provided for the Division of Waste Management (D1035),' Tank Waste Remediation System (J5164), gree Mile Island Unit 2 L..fependent Spent Fuel Storage Installation (J5186), '
Dry Transfer System (J5206),Uentralized Interim Storage Facility (D1035), Private Fuel Storage Facility (J5226), and Savannah River Site Aluminum-Based Spent Fuel (J5210) Job Codes (JCs), as well as for composite spending on this contract. All variances are expressed with regard to the current operations plans.
During period 2, three new intermediate milestones were introduced and one schedule change was made as reflected in table 2. Five deliverables were transmitted as indicated in table 3.
Please contact me or Mr. Henry Garcia if you have questions regarding this repon.
./
Sinc y ur[
49lllfla(
esley C. Patr ck President
[
HFG/lg Enclosures cc:
B. Meehan J. Greeves S. Shankman C. Paperiello J. Holonich S. Bahadur D. DeMarco E. Ten Eyck M. Federline B. Stiltenpole (38)
E. Brach CNWRA Directors / Element Managers W. Kane F Miraclia S. Boyanowski (SwRI Contracts) 9812090169 981207 PDR WASTE WM-11 PDR Washington Office
- Twinbrook Metro Plaza, #210 *12300 Twinbrook Parkway
- Rockville. Maryland 20852-1606