Motion to Withhold Final Decision Re Awpp Contention V1-1 Pending Reinsp of Independent Measurement Described in 840608 Motion
ML20197G604
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 06/11/1984
From: Romano F
AIR AND WATER POLLUTION PATROL
To:
Atomic Safety and Licensing Board Panel
References
OL, NUDOCS 8406150338
Download: ML20197G604 (1)


Text

[

AIR and WATER COLvn.

Pollution Patrol W'

BROAD AXE, PA.

.g N 82:gg June 11, 1984 bCC;lz(k,h.

U.S. Nuclear Regulatory Commission 3

y Washington, D.C.

20555 BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In The Matter Of 0L PHILADELPHIA ELECTRIC COMPANY Docket Nos. 50-352 (Limerick Generating Station and 50-353 OL/

Units 1 and 2)

MOTION TO WITHHOLD FINAL DECISION RE AWPP CONTENTION VI-I As per letter of June 4, 1984 from the USNRC to Philadelphia Electric Company's John S. Kemper, Vice President Engineering and y

Research, 2301 Market Street, Philadelphia, Pa. 19101, NRC will conduct Independent Measurments to begin on July 9, 1984, and con-clude on July 20, 1984.

This re-inspection infers a doubt on prev-ious inspections as was the partial subject of AWPP Contention VI-I.

AWPP (Romano) again states random scientific statistical samp-ling must be the procedure inasmuch as " rule of thumb" and " judge-ment" of individuals was used throughout the construction of Lim-erick.

Further, as per AWPP's Motion To The Board of June 8,

1984, this instant letter, confirms there exists a legitimate uncertainty regarding proper inspection of welds, and Quality Assurance super-vision of its welding inspection program.

AWPP again pleads that the Byron decision to withold licensing pending re-inspection described in AWPP (Romano) June 8, 1984 Mot-ion to the Board.be considered.

8406150338 840611 Sincerely, PDR ADOCK 05000352 C

PDR IR A WATER EOLLUTION PATROL gy /_ c 9

s w-Fr R.

Romano, Chairman

.