ML20197G595

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-458/97-17 on 971012-1129 & Notice of Violation.One Cited & Several Noncited Violations Identified.Cited Violation Involved Actions Associated with Unsatisfactory Containment Air Lock Leakage Test Results
ML20197G595
Person / Time
Site: River Bend Entergy icon.png
Issue date: 12/24/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mcgaha J
ENTERGY OPERATIONS, INC.
Shared Package
ML20197G599 List:
References
50-458-97-17, NUDOCS 9712310065
Download: ML20197G595 (5)


See also: IR 05000458/1997017

Text

- .

. . -- ..

.

. - .

~

_

. .-

p* %

\\

UNITED STATES

[

r , [j

v NUCLEAR REGULATORY COMMISSION

.

h [f

-

e

e

nrcoo w

3-

[

m M( Pu?A recE M att 4;0

ga s

g

w..wo w m m

.....

% 2 A

>

John R. McGaha, Vice President - Operations

i

River Bend Station

t

Entergy Operations, Inc.

P.O. Box 220

St. Francisville Louisiana 70775

SUBJECT: NRC INSPECTION REPORT 50-458/9717 AND NOTICE OF VIOLATION

Dear Mr. McGaha:

-

'

An NRC inspection was conducted October 12 through November 29,1997, at your River Bend '

Station reactor facility. The enclosed report presents the scope ud results of that inspection.

. During the 7 week period covered by this inspection, you, conduct of activities at the River Bend

i

facility was generally characterized by safety-conscious operations, sound engineering and

maintenance practices, and good radiological controls. However, une cited and several

noncited violations of NRC requirements wers identified. The cited violation involved actions

!

'

associated with unsatisfactory containment al. lock leakage test results. NRC inspectors

identified that operators failed to initially enter the appropriate Technical Specification ACTION

Statement and, after the correct ACTION Statement was entered, operators failed ta complete

all of the actions required by the Technical Specifications,

in our review of your maintenance activities, we noted five instances where surveillances were

interrupted, delayed, or had to be repeated because of inappropriate plant configuration for the

test or weaknesses in executing test procedure steps. The details and their significance are

discussed in the inclosed report. Previous resident inspection reports (50-458/9714 and 97 15)

also documented similar findings. We are concerned that these examples represent a pattern of

inattention or a developing adverse trend. Focused attention to performance in this area is

warranted.

Finacy, this report documents difficulties in operating the suppression pool cleanup (SPC)

system, The diversity of problems associated with this new system are of concern to us. During

_ system operat on, the system was damaged to an extent that it could not be used. The technical

depth of operator training and the adequacy of operating procedures was challenged. More

importantly, however, the equipment operator's lack of a questioning attitude and his willingness

to work around procedural shortcomings calls into question your success in dealing wit'1

personnel performance issues.

The cited violation is presented in the enclosed Notice of Violation (Notice) and the

~

cirumstances surrounding the violation is described in detailin the enclosed report. Please

note that you are required to respond to this letter and should follow the instructions specified in

.the enclosed Notice when preparing your response. The NRC will use your response, in part, to

- determine _whether further erJorcement action is necessary to ensure compliance with regulatory

requirements.

Y

.971231

5 971224

"

PDR

A

K 05000458

=G

PDR

_

_._ __

_.

-

-.

-

.-

..

--

__. .._. _ ._ . _ . _ .. _ _ _ _ _ _

.

l

.j:

l

l

'

Entergy Operations, Inc.

2<

j

i

n

i

-

!

i

In accordance with 10 CFR 2.790 of the NRC's Rules of Practice," a copy of this letter, its

enclosure (s), and your response will be placed in the NRC Public Document Room (PDR). To

l

' the extent possible, your response should not include any personal privacy, proprietary, or

l

!

safeguards information so that it can be placed in the PDR without redaction.

.

. Should you have any questions concerning this inspectbn, we will be pleased to discuss them

.

with you.

I

Sincerely,

i

i

.,

f ,b

  • th # #

\\

[ Dho as P.

3;Oirecicr

- '

i

,

Di sion of Reactor Projects

j

Docket No.: 50458

License No.: NPF 47'

j

-

Enclosures:

1. Notice of Viol & tion

'

2. NRC Inspection Report

50-458/97 17

.

cc w/or'dosures:

Executive Vice President and

!

Chiet Operating Officer

. Entergy Operations, Inc,

'

P.O. Box 31995

Jackson, Mississippi. 392861995

{

-Vice President

t

Operations Support

Entergy Operations, Inc.

- P.O. Box 31995 -

,

Jackson, Mississippi 39286-1995

1

l

!

General Manager

,

~

. Plant Operations:

.

~

River Bend Station

,

Enter 9y OperationsTinc.

P.O. Box 220 L ..

a

St. Francisville,-Louisiana 70775

.

4

n

.

s

n

h

@

ap

y

4

4

y

7 ;.

-

<

,

ii A -.

. .. ..

..

,,;,

. , , , , _ , _ , . , ,

. ,;

}

.

.

Entergy Operations, Inc.

-3

Director - Nuclear Safety

River Bend Station

Entergy Operations, Inc.

P.O. Box 220

St. Francisville, Louisiana 70775

i

Wise, Caner, Child & Caraway

P.O. Box 651

Jackson, Mississippi 39205

Mark J. Wetterhnhn, Esq.

Winston & Strawn

1401 L Street, itW.

Washington, D.C. 20005 3502

Manager - Licensing

River Bend Station

Entergy Operations, Inc.

P.O. Box 220

St. Francisville, Louisiana 70775

The Honorable Richard P. leyoub

Attorney General

P,0. Box 94095

Baton Rouge, Louisiana 70804 9095

H. Anne Plettinger

3456 Villa Rose Drive

Baton Rouge, Louisiana 70806

President of West Feliciana

Police Jury

e

P.O. Box 1921

St Francisville. Louisiana 70775

Joint Ownership Manager

Cajun Eleck Power Coca. Inc.

,

P.O. Dox 15E40

Baton Rouge, Louisiana 70895

.

Williara H. Spell, Administratet

Lou;slana Radiatbn Protectinn DivMion

+

.

-

P.O. Box 92135

,

tiebn Rouge, Louisiana 70884 2135

'

.

'$

-t

'

~C

(

.j

<

. . .

<

= -)

J-

L

-

'

,

.

. . - .

.

Entergy Operations, Inc.

4-

DEC 2 41997

E Mail report to T. Frye (TJF)

E Mail report to T. Hiltz (TGH)

i

E Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

,

bec distrib by RIV:

Regional Administrator

Senior Resident inspector (Grand Gulf)

DRP Director

DRS-PSB

'

Branch Chief (DRP/C)

MIS System

Project Engineer (DRP/C)

RIV File

'

Branch Chief (DRPRSS)

Resident inspector

,

DOCUMENT NAME: R:\\_RB\\RB717RP.GDR

To receive copy of document, indicate in box:"C" = Copy without enclosures "E" = Copy with endosures *N" = No copy

RIV:SRl*

C:DRP/C'

D:DRP

,

GDReplogie

EECollins

TPGwynrldV

12/15/97

12/15/97

12/M/97 \\\\

  • Previously Concurred

OFFICIAL. RECORD COPY

i

T

wm+

rW*

.

-

.-

__ _ . -

- .__

, .

-

- -- . . - - -

. . . - . _ _ - - - _

Il

f

,

.

1

l

', *

Entergy Operations, Inc.

4-

Dh^ 2 4 " "~

!

!

E Mail report to T. Frye (TJF)

E Mail report to T. Hiltz (TGH)

E Mail report to NRR Event Tracking System (IPAS)

.

'

E Mail report to Document Control Desk (DOODESK)

E Mail report to Richard Correia (RPC)

l

E Mail report to Frank Talbot (FYT)

l

l

bec to DCD (IE01)

-

l

.,

'

t,cc distrib; by PlV:

Regional Administrator

Senior Ruident inspector (Grand Gulf)

t

DRP Director

DRS PSB

^

Branch Chief (DRP/C)

MIS System

'

Project Engineer (DRP/C)

RIV File

- Branch Chief (DRP/TSS)

Resident inspector

I

i

-

'

n

i

,

t

.,

i

i

.

!

DOCUMENT NAME: R:\\_,RB\\RB717RP.GDR ~

to receive copy of occument. inoicate ir box: c Copy we.hout enclosures *E" a Copy wth enclosures "N" * No copy

- l RIV:SRl'

C:DRP/C'

D:DRP

_

l GDReplogle-

EECollins

TPGwynn

l12/15/97

12/15/97

12/ ^, - /97

'Previously Concurred

OFFICIAL RECORD COPY

(

-

'

31001L

!

.

<

,-n.-

-vnn'--H

e ,

=

.no,

rw,

.-v-,

- - -,

r- w w-

- , - ,

w

w---

, - r

-w--