s Docket No. 50-397 liEMORANDutt FOR: H. R. Denton, NRR -
E. G. Case, NRR G. Edison, TOSB, NRR D. G. Eisenhut, DL R. A. Purple, DL H. Thompson, DHFS R. H. Vollmer, DE R. J. Mattson, DSI T. Speis, DST B. Snyder, TM1PO G. Holahan, ORAB T. M. Novak, DL G. Lainas, DL F. Miraglia, DL THRU:
A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing FR0ft:
R. Auluck, Project Manager Licensing Branch No. 2 Division of Licensing
SUBJECT:
DAILY HIGHLIGHT -
UNP-2 PLANT STATUS At 5:00 a.m. (EST) May 8,1984, UNP-2 reached a power level of 20 percent of rated thermal power with turbine at 400 rpm's. The plant is in Test Condition 1 of the power ascension progran and is expected to reach full power during the first week of September, 1984.
R. Aulock, Project Manager Licensing Branch No. 2 Division of Licensing
$$0,Nirre"rr mmme=
DI DL: B /BC Distribution:
f E. Hyl ton, LA R. Auluck 8405180474 840509 X h ADOCK 05000397 ei:-