n APR 2 01984 j
Docket No. 50-397 MEMORALDUti FOR:
H. R. Denton, NRR E. G. Case, ?!RR G. Edison, NRR D. G. Eisenhut, DL R. A. Purple, DL H. Thompson, DHFS R. H. Vollmer, DE R. J. Mattson, DSI T. P. Speis, DST J. Taylor, I&E i
G. Holahan, ORAB T. M. Novck, DL G. Lainas, DL F. fiiraglia, DL THRU:
A. Schwencer Chief Licensing Branch No. 2 Division of Licensing FROM:
R. Auluck, Project Manager Licensing Branch No. 2, DL
SUBJECT:
DAILY HIGHLIGHT - WNP-2 PLANT STATUS As of 2:00 PM (EST) April 19, 1984, the reactor pressure is at 1000 pounds with the reactor coolant temperatures at 540 F.
The drywell average tenperature is 117 F (well under the technical specification limit of 135 F).
However two areas have temperatures of 158'F and thus, the plant is in a 30-day action statement with regard to these local drywell high terperatures.
The power level is approximately 5%.
The pcwer ascension progran has been resumed which will take the plant to :pproximately 15% power next week.
]
p-l R. Auluck, Project Manager Licensing Branch No. 2 Division of Licensing LB#2 Rdg.
~
EHylton O!$00 bc 7
c W. Paton, OELD l
SBlack
/PM DL:L<3#2/BC ck:kw ASchwencer 4
/84 4/ /84
\\.-
.