Forwards Sser Re Implementation of Cable Identification & Clarification of Cable Separation Criteria of Section 8.4.1 in 821028 Sser.Implementation & Clarification Acceptable
ML20197G315
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/16/1984
From: Rubenstein L
Office of Nuclear Reactor Regulation
To: Novak T
Office of Nuclear Reactor Regulation
References
CON-WNP-0741, CON-WNP-74, CON-WNP-741 NUDOCS 8404050047
Download: ML20197G315 (3)


Text

7Mh] , ..e D- ]1 7 MT4 7.',/ Gd IdAR I 61984 Docket No: 50-397 MEMORANDUM FOR: Thomas M. Novak, Assistant Director for Licensing, DL FROM: L. S. Rubenstein, Assistant Director for Core and Plant Systems, DSI

SUBJECT:

SUPPLEMENT TO SAFETY EVAUUATION REPORT -

WPPSS NUCLEAR PROJECT NO. 2 Plant Name: WPPSS Nuclear Project No. 2 Licensee: Washington Public Power Supply System Docket No: 50-397 Licensing Stage: OL Project Manager: R. Auluck Systems Integration Branch: Power Systems PSB Reviewers: S. Rhow/R. Giardina Review Status: Complete The enclosed Supplement to the Safety Evaluation for WNP No. 2 is our evaluation of implementation of the cable identification and clarification of cable separation criteria of Section 8.4.1 (Physical Identification and Independence of Redundant Safety-Related Electrical Systems) in SER Supplement No. 2 dated October 28, 1982. The evaluation is based on the applicant's information provided in letters dated December 9 and 28,1982.

We find that implementation and clarification have not deviated from the previously approved design criteria and are,therefore, acceptable. -

C . ;, ,' ' Gyd by ' ff . .. \ > v i

~W"

/ ,,sLTS. Ru'oenstein

[f8404050047 ~_g '

~

t

  • U "8 0 "' 88 * #" "

for Core and Plant Systems

( 7 ADOCK N O hh7 i Division of Systems Integration y

Enclosure:

As stated cc: R. Mattson J. E. Knight D. Eisenhut A. Ungaro M. Srinivasan R. Auluck A. Schwgacer S. Rhow

"'C'> .....CQRtACt/ . . .f S B.. . .... ...P.S fA-I ...P.SN.'.... ...'ANCPS . .. .. ..... . . ...... .. . .....

= ~ ~ > ....hggp .~.16.MM.bt.. .mnuk..... .msn.t aasan. . . .. . ... .. . ...........

)taudente.tn.

3

./.:78?........

. .. 3(!.4.(.84

. ........ 3 W..!.84.......

... 3d.?/.8i.......

iac w.u m .io aoi ~ac u o24o OFFICIAL RECORD COPY *""""~~'"

. .,, ENCLOSI SUPPLEMENTAL SAFETY EVALUATION REPORT WPPSS NUCLEAR PROJECT NO. 2 8.0 ELECTRIC POWER SYSTEMS 8.4 Other Electrical Features and Requirements for Safety 8.4.1 Physical Identification and Independence of Redundant Safety-Related Electrical Systems The applicant provided information in Letters dated December 9 and 28, 1982 for physical identification and separation of electrical equipment ano cables in addition to the design criteria in the Amendment 23 of the FSAR which NRC had ,

previously approved in . Supplement No. 2 of the Safety Evaluation Report (NUREG-0892).

The information describes the implementation .of the identification of Class 1E redundant cables in Class 1E raceways FSAR section (8.3.1.3.1), prime ind associated cables in raceways FSA9 Section (8.3.1.3.2), and non-Class 1E cables in raceways FSAR Section (8.3.1.3.3).

n. - . - - - - - - , - - - . . - . _ - . _ . . . - - - . . . , ,

The Ljcensee.also provided supplemental clarification of their position of Separation Within Panels FSAR Section (8.3.1.4.3.7),

Analysis f or Category 3 A Non-Class 1E Circuits FSAR Section (8.3.1.4.4.1.b), Analysis f or Category 3B Non-Class 1E Circuits FSAR Section (8.3.1.4.4.1.7), and Analysis for Category 3C Non-Class 1E Circuit s FSAR Section (8.3.1.4.4.1.8).

We have reviewed the implementation and clarification of design criteria for the physical identification and cable separations and concluded that the implementation and the clarification of the cable separation criteria has not deviated from the previously approved design criteria (SER dated October 28, 1982) and is, therefores acceptable.