ML20197G256

From kanterella
Jump to navigation Jump to search
Comment Supporting Proposed Rule 10CFR50 Re Emergency Planning & Preparedness Requirements for Nuclear Power Plant Fuel Loading & Initial Low Power Operations.Time Reduction Should Be Made Between Completion of Plant & Operation
ML20197G256
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 06/01/1988
From: Ameringer E
AFFILIATION NOT ASSIGNED
To:
NRC
References
FRN-53FR16435, RULE-PR-50 53FR16435-00354, 53FR16435-354, NUDOCS 8806150071
Download: ML20197G256 (1)


Text

_ _-_ -

DOCKCT NUMBER DD PROPOSED ROLE EU

( 5 3 P R / lo Y 3 C hWM8 U.S. h*uclear Regulatory Commissicn

'dashingten, D.C. 20555

'% JM -6 P12:16 Gentlemen, Although we live a long way from flew England it i

Meg.

h CRANCH that yo; do everything in your power to promote the licensing of the Seabrock

(.

Station which in my opinien hae been prevented from going on stream much t'oc.

long by a small grcup of anti-nukes. The entire nation in my judgement could use more alternative sources of energy such as nuclear which I believe to have many advantages over ccal, oil and gas, if we are compete with the world. I would hope that we could be a leader in this area despite the resistance cf a minc:ity....I would hope that the !.?.C would do its partlin this challenge. Yet at time I have wondered what side you are on despite ycur mandates. I would further wish.that you lend your strength to advancing the use of nuclear energy.

I further wish something could reduce the time between the time a plant is finished and when it can be placed on stream. This seems like an awful waste.

Thanks for taking the tirre to read this shor6 letter which will serve to let you know,although living in a state where oil a2d gas are found,we am concerned about the many deleys in getting the Seabrock Station en line.

Since rely,

.y&

c E.0. Ameringer 6109 S 72nd E Ave Tulsa, Ok 74133 l

8806150071 980601 PDR PR 50 53FR16435 PDR tp T(6

.