Text
UJ0KET NUMBER PROPOSED RULE ?O $
anAsr otAes, usw senscv osoos(53 FR l (o'
~
,o, m or nrr<..mrs.'"
35-)
L O L *. i.. ~
' i;:
'88 JN -6 A 8 1 June, 1988 Orrsu.
DOCHi:\\ts., 4 :w :
Bl :.li>
g Secretary of the Commission Attn:
Docketing and Service Branch U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Gentlemen:
I strongly support NRCs proposed new ruling clarify-ing the requirements new nuclear power plants must meet before 5% low-power testing is conducted.
I agree with expert opinions stating that such low-power testing poses no threat to the public outside the plant, therefore sirens need not be in place dur-O.
ing initial low-power testing.
Do not permit opponents of Seabrook to exploit the ambiguity of the current rule to stop Seabrook from opening..Do not be intimidated by the reported actions of some public officials in Massachusetts to remove existing siren systems in a furthur effort to block Seabrook 's progress !
New England needs all the power it can generate, be-lieve that nuclear generated power can be safely pro-vided, and urge you to approve your proposed ruling.
Sincerely, c
i beth J.
dJy 8806140522 880601 PDR PR 50 53FR16435 PDR l>s/6
-