ML20197F910

From kanterella
Jump to navigation Jump to search
Confirms Extension for Response to NOV to Insp Rept 50-416/97-21.Based on Telcon W/D Kirsch,Response Will Be Due 980122
ML20197F910
Person / Time
Site: Grand Gulf 
Issue date: 12/18/1997
From: Hughey W
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
50-416-97-21, GNRO-97-00124, GNRO-97-124, NUDOCS 9712300322
Download: ML20197F910 (1)


Text

-.

Entergy operations,Inc.

- I h

Po. Box 756 Port Gbson, MS 391So Tel 601437-6470

~*

W.K.Hughey

) a safety & nr.patay em December 18,.1997 U.S. Nuclear Regulatory Commission Mall Stop P1-37 Washington, D.C. 20555 Attention:

Document Control Desk

SUBJECT:

Grand Gulf Nuclear Station Docket No. 50-416 Ucenre No. NPF-29 Confirmation of Extension GNRO-97/00124 Gentlemen:

Grand Gulf Nuclear Station is confirming the extension for our response to Notice of Violation 97-21-01. This violation is included in NRC Inspection Report 50-416/97-21, dated December 5,1997.

Based on our telehpone conversation with Mr. Der.

Kirsch, the response will be due January 22,1998.

i l

2 Yours truly,

/

Yon

~

WKH/ CAB /cg cc:

Ms. J. L Dixon-Herrity, GGNS Senior Resident (w/a)

-}y,0 Mr. L. J. Sm'th (Wise Carter) (w/a) j Mr. N. S. Reynolds (w/a)

Mr. H. L Thomas (w/o)

Mr. J. W. Yelverton (w/a)

Mr. Ellis W. Merschoff (w/a)

Regional Administrator U.S. Nuclear Regulatory Commission Region IV

!- A 611 Ryan Plaza Drive Suite 400 U jV v qO-Arlington, TX 76011 Mr. J. N. Donohew, Project Manager (w/2)

Office of Nuclear Reactor Regulation U S. Nuclear Regulatory Commission Washington D.C.20555 9712300322 9712187 PDR ADOCK.05000416 G

PDRm