Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20135F6941996-11-27027 November 1996 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Decision of Atomic Safety & Licensing Board Terminating Proceedings in Docket Has Expired.W/Certificate of Svc.Served on 961127 ML20128L7761996-10-10010 October 1996 Notification of 961023 Meeting W/Wppss,Energy Facility Site Evaluation Council & State & Local Govt Agencies in Elma,Wa to Discuss Proposed Termination of CP & OL Application for Plant ML20058C2811990-10-26026 October 1990 Summary of 901018 Meeting W/Util Re Potential Restart of Units 1 &/Or 3 ML20151T9551988-08-0808 August 1988 Notification of 880915 Meeting W/Util in Rockville,Md to Review 880630 Submittal to Resolve Open Issues Re Ground Motion Attenuation ML20155E8511988-06-0909 June 1988 Notification of 880707 Meeting W/Util in Rockville,Md to Discuss Probabilistic Seismic Hazard Analysis Submitted by ML20196J9081988-06-0909 June 1988 Notification of 880707 Meeting W/Util in Rockville,Md to Discuss Probabilistic Seismic Hazard Analysis Submitted by .Meeting Room Changed ML20150C4201988-03-10010 March 1988 Forwards BNL Re Ssi/Deconvolution Issue.Ltr Received for Distribution to Applicant,Util & Lpdrs ML20149K1061988-02-18018 February 1988 Notification of 880301-02 Meetings W/Util in New York,Ny to Discuss Soil Structure Interaction/Deconvolution Issue ML20236W0451987-12-0101 December 1987 Notification of 871215 Meeting W/Util in Bethesda,Md to Discuss soil-structure Interaction/Deconvolution Analysis Used in Facility Seismic Evaluation ML20236N1221987-11-0909 November 1987 Forwards Structural & Geosciences Branch Observation & Findings Re Concrete Module on (C3-02) - Const Assurance Program.Observation & Findings Should Be Identified to Region V Lead Reviewer ML20236A7421987-10-14014 October 1987 Forwards Draft Status of Plant Seismic Review to Be Filed ML20214P5991987-05-21021 May 1987 Notification of Significant Meeting on 870529 W/Util in Walnut Creek,Ca to Discuss Licensee Overview Presentation of Completed Activities of Readiness Review Const Assurance Module C3-02 Re Concrete ML20215F9171986-12-11011 December 1986 Notification of Significant Meeting on 870107 W/Util at Region V Ofc to Review Commitments & Schedules for Readiness Review Program ML20207E5431986-07-18018 July 1986 Notification of 860801 Meeting W/Util in Walnut Creek,Ca to Discuss Const Assurance Program Earthwork Module ML20211G7741986-06-16016 June 1986 Advises That G Dick Assigned as Licensing Project Manager for Facility.Dick Will Be point-of-contact for All NRR Activities,Including Readiness Review ML20141D3631986-03-25025 March 1986 Suggests That Response to Util Re Delay Should Be Sent by NRR Rather than EDO ML20153F1681986-02-21021 February 1986 Requests Approval/Disapproval of Encl DOE Proposal, Readiness Review,Const Assurance Program Insp of Washington Nuclear Plant,Unit 3 ML20210B9881986-02-0505 February 1986 Forwards Util 850731 Request for Review of Itt Grinnell Stiff Clamps.Util Prepared to Make Presentation of Rept & Respond to Questions.Complete Review Requested by 860430 ML20137R8821986-02-0404 February 1986 Notification of 860213 Meeting W/Util in Bethesda,Md to Discuss Recent Developments Re Engineering Assurance Program of Readiness Review Program ML20210A9471986-01-15015 January 1986 Responds to 851219 Request for Info Re S&W Engineering Assurance Program.Principal Differences Between Engineering Assurance Program & Idvp Is Review Timing & Who Performs Review ML20210A6731985-12-0606 December 1985 Forwards Summary of OL Review Costs & Supporting Documentation for 840624-1222.W/o Supporting Documentation from Program Ofcs ML20209H0891985-10-0707 October 1985 Concurs w/marked-up Environ & Hydrologic Enginering Branch Review of Section 2.4 of Draft SER Re PMF on Streams & Rivers & Potential Dam Failures ML20132F2071985-09-27027 September 1985 Notification of Significant Licensee Meeting on 851029 W/Util in Elma,Wa to Examine Readiness Review Const Appraisal Program ML20209H0691985-09-19019 September 1985 Forwards marked-up Section 2.4 of Draft SER for Use in Responding to T Novak Undtd Memo.Figures 2.4.1 & 2.4.2 Missing from Draft ML20209H0811985-09-19019 September 1985 Recommends Concurrence W/Draft SER.Marked-up Page 6-19 of Draft SER Re Combustible Gas Control Sys Encl ML20198A1571985-09-19019 September 1985 Comments on WPPSS Project 3 Draft Ser,Including Sections 13.2,14 & 18 Re Training,Initial Test Program & Human Factors Engineering,Respectively.Comments on Sections 13.1, 13.4 & 13.5 Not Provided ML20210A7421985-09-11011 September 1985 Advises That Input in Draft SER Contains Outstanding Issues, Including Responses to Concerns Received in June 1984.Issues Must Be Received & Resolved at Such Time as Licensing Process Reinstated for Unit ML20210A7451985-09-0404 September 1985 Forwards Draft SER for Comments & Concurrence by 850920. Identification of Change in Staff Positions from Feb 1984 - Aug 1985 Requested So That Applicant May Be Advised of Items Requiring Reconsideration.W/O Encl ML20209G1251985-08-29029 August 1985 Forwards Draft SER for Comments & Concurrence by 850920. Draft Originally to Be Issued in Feb 1984.Draft to Provide Baseline Record of Review in Case Const Reinstated. W/O Encl ML20209G1101985-08-23023 August 1985 Forwards Draft SER Input,Based on FSAR Submitted to Date. Unresolved Issues Requiring Addl Info Listed ML20197K2061985-08-21021 August 1985 Recommends That a Bournia & T Cox Be Made Available If Members of NRR Required to Provide Depositions in WPPSS Securities Litigation.Listing of NRR Personnel Involved in Review of CPs of Facilities Forthcoming ML20209E5861985-06-28028 June 1985 Forwards Comments on Design Review Program to Be Implemented by Util as Second Module of Readiness Review Program,Per 850607 Memo.Specific Input from NRR (Secondary Reviewer) Not Required ML20127G1161985-06-21021 June 1985 Responds to Jg Partlow 850508 Memo Requesting Comments on Eight Draft Emergency Preparedness Preoperational Procedures.Program Should Be Similar to Other IE Insp Programs.Inclusion of Procedure 82102 Not Supported ML20209E5021985-06-12012 June 1985 Forwards Meeting Notice on Readiness Review Program Scheduled by Region V for 850701-02.T Ankrum Comments on Meeting Submitted.Implementation of Design Review Ie/Region V Responsibility.W/O Encl ML20197J5561985-05-0202 May 1985 Forwards Fes for Final Concurrence to Permit Issuance. Responses Received Re 841123 Memo Resolved.W/O Encl ML20209E3071985-04-16016 April 1985 Describes Site Environ Status,As Determined by 850411 Telcons W/F Hahn,A Moore & a Christian.Stabilization & Revegetation Efforts Along Stein Creek & Elizabeth Creek Satisfactory.Site Visit Not Necessary for Environ Review ML20209E3681985-04-12012 April 1985 Informs That Development of Draft SER Not Worthwhile,Per 850129 Request That Draft SER Be Provided by 850301,since Most Responses to Questions Not Received.No Approved Schedule Exists for Facility ML20209E0271985-03-0404 March 1985 Advises That Branch Has No Further Input to 831013 Draft SER & Section 3.11,per 850129 Request.Addl Input for Section 3.10 Will Be Provided at Later Time ML20209E0761985-03-0101 March 1985 Forwards Draft SER Re FSAR Chapter 14 Concerning Initial Plant Test Program.Test Program Acceptable & Meets Requirements of 10CFR50 ML20209D9871985-02-26026 February 1985 Forwards Draft SER Input on FSAR Section 4.2, Fuel Sys Design. License Condition 4.2.3.1(g) Re Maintaining Shoulder Gap Clearance During First Two Refueling Outages Should Be Relaxed ML20209E0061985-02-25025 February 1985 Confirms 850208 Notes That No Revs or Additions to 831213 Draft SER Input Provided,Per 850129 Request ML20209D9541985-02-19019 February 1985 Forwards Proposed License Condition & Safeguards SER Input, Based on Review of Facility Security Plan.Protected SER App Containing Safeguards Info Available from E Mcpeek. SALP Input Also Encl ML20209D9711985-02-19019 February 1985 Advises That Meteorology Sections in Draft SER Require No Changes & Should Be Used,Per G Knighton 850129 Request ML20209D9771985-02-15015 February 1985 Advises of Dr Muller 840511 Memo to Tm Novak That Provided Final SER Input Identifying One Open Item Re Control Room Habitability from Section 6.4.Item Remains Open Due to Lack of Info from Util ML20209D9371985-02-0808 February 1985 Forwards 831031 Draft SER Re Radiation Exposure in Response to 850129 Memo.Fsar Review Status Continuing Since Response to Eight Open Items Not Yet Received.W/O Encl ML20209D8971985-02-0606 February 1985 Discusses Review of Section 4.0, Identification of Vital Areas & App of Safeguards SER for Facility.No Concerns Re 10CFR73.55 Found ML20209D8481985-01-29029 January 1985 Informs That Draft SER Issuance Rescheduled for Mar 1985. Draft SER Input Indicating Appropriate Findings Re Topic Review or Inadequate Applicant Response Requested by 850301 ML20209D7321985-01-0303 January 1985 Forwards Summary of Review Costs Incurred by Various Program Ofcs Directly Involved in Processing of Ol.W/O Encl ML20209D6671984-12-0505 December 1984 Informs That Listed Items Should Be Corrected in Draft Fes. Corrections Needed Include Encl Table 4.7 Changes Re Population Distribution within 0-10 Miles in 1980 & Changes to Sections 4.2.2 & 5.9.4.4(2) Per Encl 840927 Memo ML20209D6331984-11-30030 November 1984 Forwards Comments on Portions of Fes,Per T Novak 841123 Request 1996-11-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20135F6941996-11-27027 November 1996 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Decision of Atomic Safety & Licensing Board Terminating Proceedings in Docket Has Expired.W/Certificate of Svc.Served on 961127 ML20128L7761996-10-10010 October 1996 Notification of 961023 Meeting W/Wppss,Energy Facility Site Evaluation Council & State & Local Govt Agencies in Elma,Wa to Discuss Proposed Termination of CP & OL Application for Plant ML20058C2811990-10-26026 October 1990 Summary of 901018 Meeting W/Util Re Potential Restart of Units 1 &/Or 3 ML20151T9551988-08-0808 August 1988 Notification of 880915 Meeting W/Util in Rockville,Md to Review 880630 Submittal to Resolve Open Issues Re Ground Motion Attenuation ML20155E8511988-06-0909 June 1988 Notification of 880707 Meeting W/Util in Rockville,Md to Discuss Probabilistic Seismic Hazard Analysis Submitted by ML20196J9081988-06-0909 June 1988 Notification of 880707 Meeting W/Util in Rockville,Md to Discuss Probabilistic Seismic Hazard Analysis Submitted by .Meeting Room Changed ML20150C4201988-03-10010 March 1988 Forwards BNL Re Ssi/Deconvolution Issue.Ltr Received for Distribution to Applicant,Util & Lpdrs ML20149K1061988-02-18018 February 1988 Notification of 880301-02 Meetings W/Util in New York,Ny to Discuss Soil Structure Interaction/Deconvolution Issue ML20236W0451987-12-0101 December 1987 Notification of 871215 Meeting W/Util in Bethesda,Md to Discuss soil-structure Interaction/Deconvolution Analysis Used in Facility Seismic Evaluation ML20236N1221987-11-0909 November 1987 Forwards Structural & Geosciences Branch Observation & Findings Re Concrete Module on (C3-02) - Const Assurance Program.Observation & Findings Should Be Identified to Region V Lead Reviewer ML20236A7421987-10-14014 October 1987 Forwards Draft Status of Plant Seismic Review to Be Filed ML20214P5991987-05-21021 May 1987 Notification of Significant Meeting on 870529 W/Util in Walnut Creek,Ca to Discuss Licensee Overview Presentation of Completed Activities of Readiness Review Const Assurance Module C3-02 Re Concrete ML20215F9171986-12-11011 December 1986 Notification of Significant Meeting on 870107 W/Util at Region V Ofc to Review Commitments & Schedules for Readiness Review Program ML20207E5431986-07-18018 July 1986 Notification of 860801 Meeting W/Util in Walnut Creek,Ca to Discuss Const Assurance Program Earthwork Module ML20211G7741986-06-16016 June 1986 Advises That G Dick Assigned as Licensing Project Manager for Facility.Dick Will Be point-of-contact for All NRR Activities,Including Readiness Review ML20141D3631986-03-25025 March 1986 Suggests That Response to Util Re Delay Should Be Sent by NRR Rather than EDO ML20153F1681986-02-21021 February 1986 Requests Approval/Disapproval of Encl DOE Proposal, Readiness Review,Const Assurance Program Insp of Washington Nuclear Plant,Unit 3 ML20210B9881986-02-0505 February 1986 Forwards Util 850731 Request for Review of Itt Grinnell Stiff Clamps.Util Prepared to Make Presentation of Rept & Respond to Questions.Complete Review Requested by 860430 ML20137R8821986-02-0404 February 1986 Notification of 860213 Meeting W/Util in Bethesda,Md to Discuss Recent Developments Re Engineering Assurance Program of Readiness Review Program ML20210A9471986-01-15015 January 1986 Responds to 851219 Request for Info Re S&W Engineering Assurance Program.Principal Differences Between Engineering Assurance Program & Idvp Is Review Timing & Who Performs Review ML20210A6731985-12-0606 December 1985 Forwards Summary of OL Review Costs & Supporting Documentation for 840624-1222.W/o Supporting Documentation from Program Ofcs ML20209H0891985-10-0707 October 1985 Concurs w/marked-up Environ & Hydrologic Enginering Branch Review of Section 2.4 of Draft SER Re PMF on Streams & Rivers & Potential Dam Failures ML20132F2071985-09-27027 September 1985 Notification of Significant Licensee Meeting on 851029 W/Util in Elma,Wa to Examine Readiness Review Const Appraisal Program ML20209H0691985-09-19019 September 1985 Forwards marked-up Section 2.4 of Draft SER for Use in Responding to T Novak Undtd Memo.Figures 2.4.1 & 2.4.2 Missing from Draft ML20209H0811985-09-19019 September 1985 Recommends Concurrence W/Draft SER.Marked-up Page 6-19 of Draft SER Re Combustible Gas Control Sys Encl ML20198A1571985-09-19019 September 1985 Comments on WPPSS Project 3 Draft Ser,Including Sections 13.2,14 & 18 Re Training,Initial Test Program & Human Factors Engineering,Respectively.Comments on Sections 13.1, 13.4 & 13.5 Not Provided ML20210A7421985-09-11011 September 1985 Advises That Input in Draft SER Contains Outstanding Issues, Including Responses to Concerns Received in June 1984.Issues Must Be Received & Resolved at Such Time as Licensing Process Reinstated for Unit ML20210A7451985-09-0404 September 1985 Forwards Draft SER for Comments & Concurrence by 850920. Identification of Change in Staff Positions from Feb 1984 - Aug 1985 Requested So That Applicant May Be Advised of Items Requiring Reconsideration.W/O Encl ML20209G1251985-08-29029 August 1985 Forwards Draft SER for Comments & Concurrence by 850920. Draft Originally to Be Issued in Feb 1984.Draft to Provide Baseline Record of Review in Case Const Reinstated. W/O Encl ML20209G1101985-08-23023 August 1985 Forwards Draft SER Input,Based on FSAR Submitted to Date. Unresolved Issues Requiring Addl Info Listed ML20197K2061985-08-21021 August 1985 Recommends That a Bournia & T Cox Be Made Available If Members of NRR Required to Provide Depositions in WPPSS Securities Litigation.Listing of NRR Personnel Involved in Review of CPs of Facilities Forthcoming ML20209E5861985-06-28028 June 1985 Forwards Comments on Design Review Program to Be Implemented by Util as Second Module of Readiness Review Program,Per 850607 Memo.Specific Input from NRR (Secondary Reviewer) Not Required ML20127G1161985-06-21021 June 1985 Responds to Jg Partlow 850508 Memo Requesting Comments on Eight Draft Emergency Preparedness Preoperational Procedures.Program Should Be Similar to Other IE Insp Programs.Inclusion of Procedure 82102 Not Supported ML20209E5021985-06-12012 June 1985 Forwards Meeting Notice on Readiness Review Program Scheduled by Region V for 850701-02.T Ankrum Comments on Meeting Submitted.Implementation of Design Review Ie/Region V Responsibility.W/O Encl ML20197J5561985-05-0202 May 1985 Forwards Fes for Final Concurrence to Permit Issuance. Responses Received Re 841123 Memo Resolved.W/O Encl ML20209E3071985-04-16016 April 1985 Describes Site Environ Status,As Determined by 850411 Telcons W/F Hahn,A Moore & a Christian.Stabilization & Revegetation Efforts Along Stein Creek & Elizabeth Creek Satisfactory.Site Visit Not Necessary for Environ Review ML20209E3681985-04-12012 April 1985 Informs That Development of Draft SER Not Worthwhile,Per 850129 Request That Draft SER Be Provided by 850301,since Most Responses to Questions Not Received.No Approved Schedule Exists for Facility ML20209E0271985-03-0404 March 1985 Advises That Branch Has No Further Input to 831013 Draft SER & Section 3.11,per 850129 Request.Addl Input for Section 3.10 Will Be Provided at Later Time ML20209E0761985-03-0101 March 1985 Forwards Draft SER Re FSAR Chapter 14 Concerning Initial Plant Test Program.Test Program Acceptable & Meets Requirements of 10CFR50 ML20209D9871985-02-26026 February 1985 Forwards Draft SER Input on FSAR Section 4.2, Fuel Sys Design. License Condition 4.2.3.1(g) Re Maintaining Shoulder Gap Clearance During First Two Refueling Outages Should Be Relaxed ML20209E0061985-02-25025 February 1985 Confirms 850208 Notes That No Revs or Additions to 831213 Draft SER Input Provided,Per 850129 Request ML20209D9541985-02-19019 February 1985 Forwards Proposed License Condition & Safeguards SER Input, Based on Review of Facility Security Plan.Protected SER App Containing Safeguards Info Available from E Mcpeek. SALP Input Also Encl ML20209D9711985-02-19019 February 1985 Advises That Meteorology Sections in Draft SER Require No Changes & Should Be Used,Per G Knighton 850129 Request ML20209D9771985-02-15015 February 1985 Advises of Dr Muller 840511 Memo to Tm Novak That Provided Final SER Input Identifying One Open Item Re Control Room Habitability from Section 6.4.Item Remains Open Due to Lack of Info from Util ML20209D9371985-02-0808 February 1985 Forwards 831031 Draft SER Re Radiation Exposure in Response to 850129 Memo.Fsar Review Status Continuing Since Response to Eight Open Items Not Yet Received.W/O Encl ML20209D8971985-02-0606 February 1985 Discusses Review of Section 4.0, Identification of Vital Areas & App of Safeguards SER for Facility.No Concerns Re 10CFR73.55 Found ML20209D8481985-01-29029 January 1985 Informs That Draft SER Issuance Rescheduled for Mar 1985. Draft SER Input Indicating Appropriate Findings Re Topic Review or Inadequate Applicant Response Requested by 850301 ML20209D7321985-01-0303 January 1985 Forwards Summary of Review Costs Incurred by Various Program Ofcs Directly Involved in Processing of Ol.W/O Encl ML20209D6671984-12-0505 December 1984 Informs That Listed Items Should Be Corrected in Draft Fes. Corrections Needed Include Encl Table 4.7 Changes Re Population Distribution within 0-10 Miles in 1980 & Changes to Sections 4.2.2 & 5.9.4.4(2) Per Encl 840927 Memo ML20209D6331984-11-30030 November 1984 Forwards Comments on Portions of Fes,Per T Novak 841123 Request 1996-11-27
[Table view] |
Text
'
)
i DEC 131982 MEMORANDU!i FOR: ' George Knighton, Chief ~
Licensing Branch No. 3 '
- Division of Licensing FROM: George Lear, Chief Hydrologic and Geotechnical Engineering Branch Division of Engineering
SUBJECT:
DES REVIEW QUESTIONS - HYDROLOGIC EllGIflEERIflG Plant Name: WPPSS Muclear Project flo. 3 (UNP-3)
Docket Number: 50-508 Licensing Stage: OL Responsible Cranch: LBJ3, A. Vietti, LPM Requested Completion Date: December 10, 1932 tie presently have no additional questions with respect to our review of the Environmental Report. However, we note that six of our thirteen questions submitted to you on July 12, 1382 werit delayed in being transmitted to the applicant until October 13, 1982. The appitcant, in a letter to you, dated November 17, will not have responses to these remaining questions until January 14, 1983. Hopefully, all of our questions will be fully and completely addressed in this forthcoming response.
Eginal signed by George 1.sar George Lear, Chief Hydrologic and Geotechnical Engineering Branch Division of Engineering cc: P.. Vollmer T. Novak J. Knight M. F11egel A. Vietti D. Gupta G. Staley D. Chery DISTRIBUTION:
Docket File - DCD 016 DE:HGEB Rdg. File ( 212270360 821213 N ~ >
G. Lear t p ADOCK 05000508 '
sb - . __
omce > ...DE..:.H..G.E..B.. D.. ....D..E..:.H..G..i..f....
. .. . D.E...:.HC EB...... ....
~ . . ~ . - ~ ~ ~ . . . . . ~ ~ ~ ~ ~ . -- - - .~. - ~ -~~ --
suaum ) .. .D,C,h e ,ry,;,1,n,,,, ,,l,1f.1.f!S#.I.... . .0Lur...Q .<... . . . . . . ~ . . . ~ . . . . ~ ....- ~ ~ ~ ~ ~ - - - . . - - - - - - - ~ ~ ~ ~
oan > .12/jp./82.. . . ....12/f.?).M.. ..12J.\5/82...... . - ~ ~ . ~ ~ ~ . ~ . . . . ~ ~ ~ ~ ~ - ~ ~ ~ ~ ~ ~ " " " " - -
unc ronu ais oomi nacu ca OFFICIAL RECORD COPY ucm ime*w
. 4
. .r m
w .
nw y FEB 101983 Docket flo.: 50-508 MEi!0RATIDUi1 FOR: George W. Knighton, Chief, Licensing Branch flo. 3, DL FR0f1: Annette Vietti, Project flanager, Licensing Branch flo. 3, DL
SUBJECT:
fl0TICE OF I1EETING FOR DISCUSSI0!10F INFORMATI0!! FOR E!!VIRON!!EllTAL REVIEW AllD SITE TO'JR - UASHIllGT0ft PUBLIC POWER SUPPLY SYSTEM PROJECT 3(WitP-3)
DATE & TI!!E: March 15,1983 - 9:00 am - 4:00 pm March 16,1983 - 8:00 am - 11:00 am LCCATI0ft: March 15 (Site Tour) - UitP-3 Plant Site March 16 (Discussion) - HilP-J Conference Room PURPOSE: March 15: To observe environmental conditions at selected locations.
Itarch 16: To discuss information for environmental review of WNP-3 plant.
PARTICIPA!!TS: flRC T. flovak, A. Vietti, L. Wheeler, G. Lear, D. Chery, D. Gupta, R. Samworth, C. Ilickey, E. Pentecost, 1. Kaltman, C. Campe, J. Levine, R. Struckmeyer, D. Swanson WilP-3 K. Cook, A !!oore, fl. Kaufman, R. Leddick, G. Sorensen, J. Chasse, J. Werle D. Dobson, et al.
Annette Vietti, Project flanager Licensing Branch flo. 3 Division of Licensing
Enclosure:
vvw-Agenda .,m ,
1.au i ; ' '; 4%
cc: See'nextVa3F q j The meeting nf March 16, 1983 is open to interested members of the public to attend as observers pursuant to flRC staff policy on open meetings. !! embers of the public wishing to attend should contact ifr. K. Cook,IlitP-3 Project
..anower, at t wuree mu una wy . .a s ui i, im, .x wa s as rangu, i gn .
l 0.f.3.,,,,,,,,
C FFICE ) be..Clada..for..their..Atland@:Q.................... ........................ ........................ . . . . . . . . .
i t ighton sunNAus > ........................ ...................... ........................ .................... ...................... . . . . . . . . . . .............
.%. .@.3.........
CAfs ) ........................ ........................ ....................... ........................ ...................... ..
..'Zlf.J.8I........
wo ronu ais oo em nncu cao OFFICIAL RECORD COPY wmi mi-m =
~
.- =
-]i
, WNP-3 Mr. R. L. Ferguson Managing Ofrector .
Washington Public Power Supply System P. O. Box 968 3000 George Washington Way
~Richland, Washington 99352 cc: Nicholas S. Reynolds, Esq.
DeBevoise & Liberman 1200 Seventeenth St., NW Washington, DC 20036 G. E. Doupe Esq.
Washington Public Power Supply System
. 3000 George Washington Way a
Richland, Washington 99352 Nicholas D. Lewis, Chairman Energy Facility Site Evaluation Council 820 East Fifth' Avenue ~
01'ympfa, Washington 98505 Mr. Kenneth W. Cook Washington Public Power Supply System P. O. Box 1223 Elma, Washington 98541
- r-Resident Inspector /WPPSS 3/5 c/o U.S. Nuclear Regulatory Commission P/ O. Box 545 Elma, Washington 98541 Regicnal Administrator - Region V -
'J.S. No: lear Pagulata y Corriesion -
'.450 '%rfe La'?
Suite 210 Walnut Creek, California 94596 m
I l
1 I
L
WNP-3 Environmental Review Site Visit Agenda March 15, 1983 (9:00 AM - 4:00 PM)
A site tour will be made with the applicant and consultants. All review groups will tour the plant site. Individual review groups have expressed specific areas to be highlighted during the tour as follows:
Hydrologic & Geotechnical Engineering Branch (HGEB)
- 1. The intake and diffuser locations;
- 2. River gaging stations near the site on the Chehalis and Satsop Rivers;
- 3. The terrestrial ecology watersheds;
- 4. Reach of river from Purgatory Creek to Stevens Creek Environmental Engineering Branch (EEB)
Terrestrial Resources
- 1. Plant life existing that is expected to receive maximum salt drift deposition from cooling tower operations.
- 2. Representative comerical forest and big game hunting areas within five miles of the site, and representative habitats for endangered species.
- 3. Erosion control
- 4. Ravagetation following construction activities.
Aquatic Resources
- 1. Effects of plant operation on water quality, water level, and fish activity in surrounding creeks and rivers.
- 2. Intake and discharge areas and structures.
Radiological Assessment Branch (RAB)
Tour of radiological monitoring stations.
All persons to go on the tour are to meet inside the Site Construction Office Building at 9:00 AM. The specific route will be announced at that time.
This meeting is expected to take no more than 20 minutes in order to allow the tour to begin in a timely manner.
7- ,
, . N
.- ,,- /
.2-March 16, 1983 (3:00 AM - 11:00 AM)
Discussions will be held between the NRC staff an the applicant. These dis- .-)
cussions will encompass the questions that resulted from the review of the Environmental Report and other areas of interest developed during the site tour.
HGEC will review the following materia' to be provided by the applicant:
- 1. Topcgraphic maps of the r.njer watersheds,1ccal drainages, and the l plant site;
- 2. Aerial photographs of the site and Chehalis River in the vicinity of
, the intake and the diffussr. (Both vertical and oblique photographs if available);
- 3. Flood plain maps for the rivers and straams adjacent to the plant site;
- 4. Flood a.1d low flow records for those reacnes of the Cnehalis River adjacent to the plar.t and in the vicinity of the intakes and diffusers;
- 5. Rainfall and runcff records for the "Terrestial ecology" watersheds RAB will review the applicant's nealth physics program with representatives from the health physics organization.
Other. branches (i.e., EEB, SAB) w!11 review responses to the questions they have submitted with technically qualified app}icant representatives.
t i
i 4
~
MEETING NOTICE DISTRIBUTION: Date:
~
i L PDR NSIC PRC LBf2' Reading NRC PARTICIPAliTS:
E. Hylton ,
Project Manager A. Vietti T. Novak, DL H. Denton/E Case G. Knighton, DL D. Eisenhut/R. Purple A. Vietti, OL ,, ,
T. M. Novak* L. Wheeler, DL '
B. Youngblood G. Lear, HGE3 A. Schwencer D. Chery, PGEB G. Knighton D. Gaeta, HGEB E. Adensam R. Sanworth, EEB G. Lainas C. Hickey, EES F. Miraglia E.fentecost,EER J. P. Knight M. Kal: nan, SAB W. Johnston -. C. Campe, SAB D. Fuller ' J. Lavine,ffET T. Speis '
R. Struckmeyer, RA3 R. Houston D. Swanson ,-GELD.
L. Rubenstein *~
v' ~
F. Schroeder M. Ernst J. Kramer NRR Division Directors
- OELD Attornay D. Swanson E. L. Jordan, M QA:IE J. M. Taylor, DRP:IE Phillips Building Receptionist **
ACRS {.16}
Region V Resident Inspector cc: Serstce List
- 0nly if participant in meeting