Forwards Request for Addl Info Re Application for Const Permit & Operating License for Alchemie Facility-1
ML20197F667
Person / Time
Site: 05000603
Issue date: 06/03/1988
From: Clark A
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Pfeiffer W
ALL CHEMICAL ISOTOPE ENRICHMENT, INC.
References
NUDOCS 8806140331
Download: ML20197F667 (3)


Text

- .

JUNoaiggg Docket hos. 50-603 l

All Chemical Isotope Enrichment, Inc.

ATTN: M.. William A. Pfeiffer Pine Ridge Office Park, Suite 202-B i 702 South Illinois Avenue Oak Ridge, TN 37830 Gentlemen:

In order to complete our review related to your application for a construction permit and operating license for AlchemIE Facility-1 CPDF, additional information related to your environmental report is needed. We have enclosed a list of the additional information needed with this letter. Please note that some of the cost information is related to the letter from Mr. George W. McCorkle, dated June 3, 1988, covering safeguards l_icense conditions.

We would be pleased to meet with you if you have any questions concerning this request for additional information.

Sincerely, SR@4MLEnzo gy A. Thomas Clark .Jr.

NRC Project Manager /AlChemIE Fuel Cycle Safety Branch Division of. Industrial and Medical' Nuclear Safety

Enclosure:

As stated  ;

l bec: JFowler, DOE 1 RCuncan, DOE 8806140331 080603 PDR JHamelman, SAIC A ADOCK 05000603 FScanlon, State of TN PDR DISTRIBUTION:. #

iDocket Mos.'50-603 PDR1  ?

INRC File Center 1 NMSS R/F IMAF R/F IMSB R/F LCRouse RLFonner BMBordenick GATerry ATClark JPetersen FLBrown CSawyer OFC : IMAFA :I F  : MA -

. . . . . . . . . . ./5.fl.

b ly NAME: ATClark:lg rown .d41 l

......................______...g.W.1..............................__.....

6/3 /88 . 6"/ /88 DATE: 6/3/88 0FFICIAL RECORD COPY l

RE0 VEST FOR FINANCIAL INFORMATION ALL CHEMICAL ISOTOPE ENRIlHMENT, INC.

DOCKET N0. 50-603 I

1. Please provide detailed estimates of the costs of fulfilling NRC safeguards requirements including physical security requirements and measures for the )

protection of classified information. Such cost estimates should be separately I identified as to capital (construction) costs and operating costs. With regard to operating costs, provide astimates for each of the projected first five years of operation of the facilities. The level of detail in the estimates should be such that their reasonableness can be evaluated. Also 1

provide a detailed explanation of the assumptions underlying the cost i estimates.

Elements of safeguards cost estimates include (but are not necessarily limited to) the following: safeguards function; physical barriers; access requirements; intrusion alarms; verification measures; safeguards briefiags; test and maintenance programs; material accounting and inventory; records maintenance; preparation of material transfer and status reports; and reporting of safeguards events. i

. l l

2. Please provide detailed estimates of the costs of decontamination and disposal (deconnissioning) of all classified and/or contaminated equipment and facilities. Also provide a detailed estimate of costs of disposal of classified wastes. The level of detail in the estimates should be such that their reasonableness can be evaluated. Provisie a detailed explanation of the assumptions underlying the cost estimates.
3. Provide a detailed statement of the projected sources of funds to cover all costs in item nos. I and 2, above. Such sources should be identified as to estimated arnounts and as to the division between capital funds and operating funds. Sources of operating funds should be estimated for each

i l 2

of the projected first five years of operation of the facilities. Provide a detailed explanation of the assumptions underlying the projections of funding source: . Such projections and assumptions should be at a level of detall that will permit an evaluation of their reasonableness.

It is noted that the NRC is currently considering a final rule that sets forth technical and financial criteria for decosnissioning licensed nuclear facilities. With regard to the subject facilities to be owned by ALChemIE, Inc., such final rule would require, among other things, that the applicant demonstrate that its planned funding method is of several-specific, allowed types. It is possible that the final decossissioning rule will be promulgated while the applicant is responding to this request for financial information. If this occurs, the applicant should respond to the above questions on decommissioning costs and decommissioning funding in light of the final rule's provisions.

4. Please provide a detailed description of ALChemIE's legal and financial relationships with it! owners or stockholders, corporate affiliates, or others (such as financial institutions or investors) upon which it is relying for financial assistance. If the sources of funds relied upon include parent companies or other corporate affiliates, provide information to support the financial capability of each such company or affiliate to meet its commitments to the applicant. Provide copies of any agreements or contracts between the entities that relate to funding of the proposed activities.

l S. ProvidecopiesofALChemIE'smostrecentcertifiedannual(andmost recent interim) financial statements including income statement, balance sheet, and statement of ch:nges in financial position. If any such statements are not available, provide a statement of assets, liabilities and capital structure, and of income as of the most recent date available.

- .___m._.....-__,..m .. . . . _ ,__-.m. ._....,..,._,...,_..._.-,,..,_,_._,--,_,.-,,,,,,,,,..__m,.,m,_.,.__,.m_