..'. D:ve Morey1 Southern Nuclear
%ce Preudent =
Operenne Company Farley Preject P.O. Box 1295 Birmingham. Alabama 35201 Tel 205.992.5131 SOUTH.E.RN. -
c Deecember 18,1997 Earrgy se SentnurWl/"
10 CFR 2.201 Docket Numbers: 50-348 50-364 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 205$5 Joseph M. Farley Nuclear Plant Correction To Reply To a Notice Of Violation NRC lata = rated lawina Raaart N==hars 50-348.364/97-11 Ladies and Gcatlemen:
As requested by your transmittal dated November 17,1997, Southern Nuclear Operating Company (SNC) responded to the Notice of Violation==winted with NRC Integrated Inspection Report Numbers 50-348,364/97-11 on D==F-:= 17,1997.
In the,p to VIO 50-348,364/9 l107, Auxiliary Building Battery Surveillance Test Criteria Inansistent With TS, SNC incorrectly stated that a TS change would be submitted to the NRC by January 31,1997, vice January 31,1998. Attachment 2 corrects this typographical error.
Attachment I provides a red-line version for clarification. Please replace page E6-2 of the D= _ *-:= 17,1997, letter with the =**M corrected page E6-2.
Should you have any questions, please advise.
Respectfully submitted, f/
hl/W Dave Morey
[
DRC/maf:nev97-11 At'hhnumts:
1.- Red-Lined Page E6-2
- 2. Corrected Page E6-2
. cc:
Mr. L. A. Reyes, Region 11 Administrator d
i Mr. J. I. Zimmerman, NRR Project Manager
- Mr. T. M. Row, Plant Senior Residcsg Inspector 97 2300119 971218 5
2M'i flllE,5lllBEll
^'"
~.
-,. =
i-i---
h 9
0 9
e ATTACIIMENT I RED-LINED PAGE E6-2 a
a g
v-
^-
ENCLOSURE 6 VIO 50-348,364/97-11-07, " Auxiliary Building Battery Surveillano-Test Criteria inconsistent With TS,"
states the following:
10 CFR 50.36(c)(3), Technical Specifications, Surveillance Requirements, states, in part, tnau urveillance requirements are requirements relating to test, calibration, or inspectio-to assure that the necessary quality of systems aad components is maintained, and that limiting conditions for operation will be met.
Contrary to the above, as of March 14,1997, the Auxiliary Building, Direct Lurrent (DC) l Distribution technical specification (TS) surveillance requirement (4.8.2.3.2.C.5), battery capacity after a service test, was inadequate to ensure that limiting conditions for operr. ion would be met.
Specifically, the battery surveillance requirement specified in TS Section 4.8.2.3.2.c.5 was les, conservative than the design voltages specified in calculation 07597-E144. Battery I
operation at the TS allowed voltage would not have met the design requirement for 1
supplying adequate voltage for all safety-related components.
This is a Severity Level IV violation.
l Admission or Denial 1
The violation oc arred as described in the Not:-
l Violation.
Reason for Violation e
'Ih reason for this violation was personnel error in that a 50.59 screening had an inadequate resiew. It was incorr.xtly conclude a that the change to the design basis was not a change to Tecimical Specificatiar.s.
Corrective Steos Taken and Results Achieved Tecimical Specification changes have been drafted for submittal to the NRC by January 31,19937.
l Corrective Steps '" Tat Will Be Taken To Amid Further Violation Design Orgamzations ethin Southern C'ompany Services and BMitel along with individuals at FNP qualified to perform 50.59 evali otions will be given tie details of this violation. Emphasis will be given to perform adequate reviews dunng 50.59 screenmgs.
Dye of Full Comnliance December 31,1998 a ; - 'ag NRC approval by this date.
E6-2 I
________m._
-__.._m_.
e 6
4 4
ATTACIIMENT 2 l
'7 CORRECTED PAGE E6-2 I
a 4
i mmm_E.____.m__
__.____m. _ _ _ _ _ _ _ _ _ _ _ _
ENCLOSURE 6 VIO 50-348,364/97 11-07, " Auxiliary Building Battery Surveillance Test Criteria Inconsistent With 73,"
states the following:
10 CFR 50.36(c)(3), Technical Specificadons, Surveillance Requirements, states, in part, that surveillance requirements are (quirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, and that limiting conditions for operation will be met.
Contrary to the above, as of March 14,1997, the Auxiliary Building, Direct Current (DC)
Distribution technicaJ specification frS) surveillance requirement (4.8.2.3.2.C.5), battery capacity after a scrww test, was inadequate to ensure that limiting conditions for operation would be met.
s Specifically, the battery surveillance requirement specified in TS Section 4.8.2.3.2.c.5 was less conservative than the design voltages specified in calculation 07597-E144. Battery operation at the TS allowed voltag would not have met the design requirement for supplying adequate voltage for all safety-related components.
This is a Severity Level IV violation.
~ Admission or Denial The violation occuued as described in the Notice of Violation.
t Reason for Violation The cason for this violation was personnel error is that a 50.59 screening had an inadequate revim. It was mcorrectly concluded that the change to 15e design basis was not a change to Technical Specifications.
Corrective Steos Taken and Results Achieved Technical Specification changes have been drafted for submittal to the NRC by January 31,1998.
Corrective Steos That Will Be Taken To Aynid Further Violation Design Organizations within Southern Company Senices and Bechtel along with individuals at FNP quahfied to perform 50.59 evaluations will1, ginn the details of this violation. Emphasis will be given to perform adeq,, ate reviews during 50.59 screenings.
Date of Full ComtAiance
- December 31,1998 assuming NRC approval by this date.